# ERP for Coimbatore's pump makers, foundries and the job shops between them.

> ERP software in Coimbatore for pump, motor and foundry units: job work tracked challan by challan, castings checked by heat, LUT exports and Tamil Nadu payroll.

Page: https://www.emplotec.com/erp/india/coimbatore

A Coimbatore pump is rarely made under one roof. The casing comes from a foundry, the shaft is hardened by one unit and the stator wound by another, and every part travels on a challan. Emplotec keeps that trail, the stock and the books in one system for pump and motor makers, foundries and textile machinery suppliers.

## What Coimbatore makes, and where.

The district's own export plan groups motor, pump and foundry units as one sector. They sit in a ring of estates and parks around the city, with thousands of micro units doing the machining, winding and finishing in between.

- **Pumps and motors.** The district export plan calls Coimbatore the Pump city of Asia and counts 250 pump and motor units, selling to Africa and the Middle East. Monoblocks, submersibles and the motors that drive them are built from castings, shafts, impellers and wound stators that rarely come from one plant.
- **Foundries.** Castings for pump casings, motor bodies and machine frames. Foundries and their pump-making customers share the same pressure the export plan names: raw-material prices that move while the order is still open.
- **Textile machinery.** The district administration traces it to the mills: once Coimbatore spun cotton, it began building the machines and parts for its mills. Today that means machine shops making components to the customer's drawing, revision by revision.
- **Estates and parks.** SIDCO's estates at Kurichi, Malumichampatti and Kalapatti, the CODISSIA parks at Kallapalayam and Moopiripalayam near Sulur, COSIEMA's park at Solavampalayam and the Anna Industrial Park at Kittampalayam, each a cluster of sheds within a short drive of the next.
- **Micro units on job work.** Of the 80,408 manufacturing units registered under Udyam in the district, 75,650 are micro enterprises. Many of them work on material a bigger unit sends them: a lathe shop, a winder, a heat-treatment furnace, a paint line.

## Who we talk to in Coimbatore.

- **Pump and motor makers.** Companies selling through dealers in India and exporting to Africa and the Middle East, with dozens of models and ratings, and half their operations sitting at job workers on any given day.
- **Foundries supplying the pump trade.** Units casting bodies and impellers to their customers' patterns, who need yield, rejections and the heat behind every casting they invoice.
- **Textile machinery component makers.** Machine shops building parts to drawings that change, who quote from what similar jobs really cost and need the right revision on the shop floor.
- **Job-work units.** Winders, machine shops and heat treaters working on customers' material, who must keep it apart from their own and bill the conversion charge.

## The work Emplotec runs for a Coimbatore engineering unit.

Each of these crosses a gate at least twice, out to another unit and back, which is where challan books and spreadsheets lose count.

- **Copper out by the kilo, stators back by the piece.** Wire leaves for the winder in kilograms on a job-work challan and a returnable gate pass, and comes back as wound stators counted in numbers, with the scrap weighed. Emplotec reconciles the two units of measure for each job worker, so a gap shows up challan by challan, and the same records feed ITC-04. Products: [Manufacturing](https://www.emplotec.com/erp/manufacturing), [Inventory](https://www.emplotec.com/erp/inventory).
- **Castings in, checked by heat.** Casings and impellers arrive from the foundry with a gate entry and a GRN, then wait in QC until incoming inspection releases them. The foundry's test certificate is checked by heat, rejections go back on the vendor's record, and only released stock reaches the assembly line. Products: [Procurement](https://www.emplotec.com/erp/procurement), [Quality](https://www.emplotec.com/erp/quality), [Inventory](https://www.emplotec.com/erp/inventory).
- **Fifty models from one set of parts.** Pumps are built from multi-level BOMs with versions and alternates, and each rating or voltage is an item variant rather than a new item. MRP plans from orders and reorder levels, the finite schedule checks the assembly and test bays, and every finished pump is traced by its serial number. Products: [Manufacturing](https://www.emplotec.com/erp/manufacturing), [Inventory](https://www.emplotec.com/erp/inventory).
- **Buying copper and castings when prices move.** RFQs go to several suppliers, quotes arrive as PDF or Excel and land in a comparative statement with landed cost. Rate contracts hold agreed prices, and every purchase order is checked against them before it goes out. Products: [Procurement](https://www.emplotec.com/erp/procurement).
- **Pumps to Africa and the Middle East.** Export orders carry packing lists and invoices in the buyer's currency. Exports under LUT are kept on the LUT register with realisation tracked against each invoice, and foreign receivables are revalued at month end. Products: [CRM & Sales](https://www.emplotec.com/erp/crm-sales), [Books](https://www.emplotec.com/erp/books).
- **Job work done for someone else.** A machine shop working for a textile machinery maker records the customer's job order, keeps their bars and castings apart from its own stock, returns the parts on a challan and bills the conversion charge. The drawing register keeps every revision, and quotes are priced from similar past drawings and their actual job costs. Products: [Manufacturing](https://www.emplotec.com/erp/manufacturing), [Billing](https://www.emplotec.com/erp/billing).
- **Micro suppliers paid on their date.** Each MSME supplier's due date runs from the date of acceptance, so the payment run puts them first and MSME-1 has its data. A person releases every payment. Products: [Procurement](https://www.emplotec.com/erp/procurement), [Books](https://www.emplotec.com/erp/books).

## Tamil Nadu rules and the district's own plan.

Payroll in a Coimbatore unit carries state and city items on top of PF and ESI, and the district has written down what its pump and foundry makers need.

- **Tamil Nadu Labour Welfare Fund.** G.O.(Ms) No.161 of 2 December 2022 amended rule 11-A of the Tamil Nadu Labour Welfare Fund Rules, 1973, doubling the yearly contributions: ₹20 from each employee, ₹40 from the employer for each of them, and ₹20 from the government. HRMS computes LWF in the payroll run, and a person releases the payment. Source: Tamil Nadu Labour Welfare Board, G.O.(Ms) No.161, 2 December 2022, https://lwb.tn.gov.in/uploads/labo_205/subpage_files/GO_161.pdf (checked 2026-11-07).
- **Profession tax in the corporation.** The Coimbatore City Municipal Corporation levies profession tax on people earning in the city, in slabs of half-yearly gross income, with the lowest slab paying nothing. Payroll computes Professional Tax from each employee's salary and keeps it in the statutory registers. Source: Coimbatore City Municipal Corporation, revenue services, https://ccmc.gov.in/index.php/services/revenue (checked 2026-11-07).
- **National and festival holidays.** The Tamil Nadu Industrial Establishments (National and Festival Holidays) Act, 1958 gives every person employed in an industrial establishment in the state four paid national holidays, on 26 January, 1 May, 15 August and 2 October, and five paid festival holidays. Each plant's holiday calendar in HRMS carries them into attendance and wages. Source: Labour Welfare and Skill Development Department, Government of Tamil Nadu, https://labour.tn.gov.in/TN-Industrial-Establishments-National-and-Festival-Holidays-ACT-1958.php (checked 2026-11-07).
- **The district export action plan.** Prepared under the Districts as Export Hubs initiative, it lists pumps and motors among Coimbatore's top exports for FY 22, from 250 units, to Africa and the Middle East. For motor, pump and foundry units it names raw-material price swings as a problem and proposes bulk purchase of raw material through SIDCO and NSIC. Source: Directorate General of Foreign Trade, District Export Action Plan, Coimbatore, https://msmeonline.tn.gov.in/deap/pdf/012.pdf (checked 2026-11-07).

## Industries and products

- [Engineering and fabrication](https://www.emplotec.com/industries/manufacturing/engineering-and-fabrication): For Coimbatore's pump, motor and textile machinery makers: jobs costed from the drawing, with machining and winding sent out on job work.
- [Metal casting, forging and steel](https://www.emplotec.com/industries/manufacturing/metal-casting-and-forging): For the foundries casting pump bodies and machine frames: heats traced to the customer, yield and pattern life.
- [Textiles and garments](https://www.emplotec.com/industries/manufacturing/textiles-and-garments): For the mills and the knitting and garment units towards Tiruppur: yarn and fabric out on job work and counted back.
- [Emplotec Manufacturing](https://www.emplotec.com/erp/manufacturing): BOMs with variants, MRP, the finite schedule and job work in both directions.
- [Emplotec Inventory](https://www.emplotec.com/erp/inventory): Copper by weight, stators by count, every pump by serial, one ledger across the plant and its job workers.
- [Emplotec Procurement](https://www.emplotec.com/erp/procurement): RFQs, rate contracts, incoming inspection and MSME suppliers paid on their date.
- [Emplotec Quality](https://www.emplotec.com/erp/quality): Castings held in QC until released, with the test certificate checked by heat.
- [Emplotec Books](https://www.emplotec.com/erp/books): LUT exports with realisation tracking, GST on every invoice and the job-work register for the CA.

## Working with us from Coimbatore.

- **The free audit, over video.** One working session with your owner, stores and accounts on a video call, then a written summary of a few pages within five working days. It is free, and the summary is yours whether or not we work together.
- **Your job workers in the scope.** Live in 30 days covers what your proposal names: the plant, the godowns and the job workers you send material to. Data is moved in 48 hours, including the challans still open.
- **Remote unless we agree otherwise.** Implementation runs remotely from Chennai. If you want the team at your plant for go-live or training, it is written into the proposal before work starts.
- **Fixed fees, phase by phase.** After the audit, each phase is quoted as a fixed fee and paid as it is delivered. Emplotec ERP is recommended only where it fits your units.

## Questions and answers

### Do you have an office in Coimbatore?

No. Emplotec Solutions Private Limited is in Madipakkam, Chennai. The free audit is a video session, and any visit to your plant is agreed in the proposal first.

### Our winder returns stators, not copper. Can Emplotec reconcile that?

Yes. Copper goes out by weight and stators come back by count, with scrap weighed in. Emplotec reconciles each challan for each job worker, shows what should still be with them, and keeps the records ITC-04 needs.

### We do job work for textile machinery makers. Does it keep their material separate?

Yes. Job work received keeps the customer's material apart from your stock, from their job order to the return challan, and bills the conversion charge. The drawing register keeps each revision of their drawings.

### Does payroll handle Tamil Nadu LWF and the corporation's profession tax?

Yes. PF, ESI, Professional Tax and LWF come out of the same payroll run, with each plant's holiday calendar. A person approves the run and releases every payment.

### We export pumps under LUT. Is that covered?

Yes. Exports under LUT are kept on the LUT register, realisation is tracked against each invoice, and foreign-currency receivables are revalued at month end.

### How soon can our plant and job workers be live?

Data moved in 48 hours and live in 30 days. Your proposal says what live covers, for example the assembly plant and its four job workers first, then the export desk.

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- ERP in India: https://www.emplotec.com/erp/india.md
- Emplotec ERP: https://www.emplotec.com/erp.md
- Software Development Company in Coimbatore: https://www.emplotec.com/services/india/coimbatore.md
