# ERP for Pune's auto component makers, from Chakan to Ranjangaon.

> ERP software for Pune auto suppliers in Chakan, Talegaon and Pimpri-Chinchwad: OEM schedule revisions, job work and ITC-04, PPAP and 8D, Maharashtra PT and LWF.

Page: https://www.emplotec.com/erp/india/pune

The schedule revision arrives overnight, half the lot is still at a heat treater in Bhosari, and the truck for the customer's line leaves at six. Emplotec holds the revision, the job-work challan, the QC hold and the dispatch in one system for component makers across the Pune belt, and drafts the plan your planner approves.

## The Pune belt, area by area.

MIDC calls Pune the largest auto hub in India. The work spreads across industrial areas from the north-west of the city to the north-east, and parts often pass through more than one of them before they reach a customer.

- **Pimpri-Chinchwad and Bhosari.** The older industrial township north-west of the city, where MIDC counts more than 4,000 manufacturing and ancillary units in the region alone. When the next process sits at another firm in the township, material spends days out on challan, and every piece has to come back and be counted.
- **Chakan.** MIDC's Chakan industrial area has grown phase by phase, and MIDC plans to acquire 500 acres for a fifth phase. A plant shipping from here to an assembly line on a daily schedule needs the ASN, e-invoice and e-way bill ready before the truck reaches the gate.
- **Talegaon.** Part of the Pune-Chakan-Talegaon-Satara land bank that MIDC lists for engineering, auto and components. A supplier with plants in both Chakan and Talegaon moves stock between them on delivery challans and keeps one stock ledger for the two.
- **Ranjangaon.** North-east of the city, and one of the areas where MIDC is acquiring land for a third phase. A unit here that sends work to job workers elsewhere in the district needs gate passes and challans that close against what returns.

## Who we talk to in Pune.

- **Tier 1 and Tier 2 suppliers to vehicle makers.** Plants shipping to an OEM's line on weekly schedules with cumulative quantities, who answer for every short supply and every rejection in a review.
- **Machine shops working for Tier 1s.** Smaller units machining forgings and castings they receive on challan, who need customer-owned material kept apart from their own and a conversion charge billed for each lot.
- **Forge shops and foundries that supply the belt.** Units sending fettling, heat treatment or machining out on job work, where heat numbers and test certificates follow each lot to the customer.
- **Engineering firms building to order.** Fabricators and special-purpose machine builders around the industrial areas, costing each job from the drawing and the revision on the shop floor.

## What Emplotec runs for a Pune component maker.

Each of these starts with a customer's document or a job worker's return, the two places where a Pune supplier's week usually goes wrong.

- **A revision overnight, a new plan by morning.** The agent reads the OEM's schedule from the PDF, Excel sheet or email it arrives in and turns it into draft lines with each part's running cumulative. MRP runs against the new quantities, and the finite-capacity board re-sequences the cells, for the planner to accept. Products: [CRM & Sales](https://www.emplotec.com/erp/crm-sales), [Manufacturing](https://www.emplotec.com/erp/manufacturing).
- **Out to Bhosari on challan, back through QC.** Heat treatment or plating sent to a job worker leaves on a challan linked to the gate pass. What comes back is inspected before it can be picked, held in QC if it fails, and reconciled with the job worker, with ITC-04 built from the same challans. Products: [Manufacturing](https://www.emplotec.com/erp/manufacturing), [Inventory](https://www.emplotec.com/erp/inventory), [Quality](https://www.emplotec.com/erp/quality).
- **The PPAP file and the audit next month.** PFMEA on the AIAG-VDA method, control plans, PPAP packs, SPC with Cp and Cpk, and layered process audits sit with the part they belong to. A gauge past its calibration date is blocked from inspections, so no record rests on it. Products: [Quality](https://www.emplotec.com/erp/quality).
- **A rejection at the customer's line.** The complaint is linked to the dispatch and opens an 8D in Quality, with containment, root cause and CAPA checked for effect. The customer's rejection debit is recorded against it, and a supplier's share goes back to them as a corrective-action request on the vendor portal. Products: [Quality](https://www.emplotec.com/erp/quality), [CRM & Sales](https://www.emplotec.com/erp/crm-sales).
- **Bins, labels and the consignment store.** Customer part numbers and labels print on the dispatch, the ASN is raised with the e-invoice and e-way bill, and returnable bins are counted out and back. Stock held at a customer's plant is invoiced from their consumption report. Products: [CRM & Sales](https://www.emplotec.com/erp/crm-sales), [Inventory](https://www.emplotec.com/erp/inventory).
- **Payroll for a Maharashtra plant.** Shifts, overtime and contract workers from the biometric devices flow into payroll, with PF, ESI, Maharashtra Professional Tax and LWF computed for each plant. A person releases every salary payment. Products: [HRMS](https://www.emplotec.com/erp/hrms).

## Maharashtra's rules, and MIDC's plans for the belt.

State payroll levies, the state's GST code and the land MIDC is adding around the city all reach a Pune plant's system.

- **Profession tax in Maharashtra.** Levied under Maharashtra's profession tax Act of 1975 and run by the Maharashtra GST Department, whose portal takes PTRC returns and PTEC payments and lists PTRC returns as monthly. Emplotec computes Professional Tax in payroll by state, so each plant's deductions are ready for the return. Source: Maharashtra GST Department, https://www.mahagst.gov.in/ (checked 2026-11-07).
- **The Maharashtra Labour Welfare Fund.** The Maharashtra Labour Welfare Fund Act of 1953 set up the Maharashtra Labour Welfare Board, which runs welfare schemes for workers and their families, with responsibility shared by employee, employer and government. LWF is computed in Emplotec payroll with the other state deductions. Source: Labour Department, Government of Maharashtra, https://labour.maharashtra.gov.in/en/allied-offices/maharashtra-labour-welfare-board (checked 2026-11-07).
- **GST state code 27.** The e-invoice system's master codes list Maharashtra as state code 27. Each Pune plant's GSTIN carries it, and a group with a plant outside Maharashtra keeps that GSTIN's returns separate. Source: e-Invoice System, GSTN, https://einvoice1.gst.gov.in/Others/MasterCodes (checked 2026-11-07).
- **Pune in Maharashtra's auto industry.** MIDC describes Pune as the largest auto hub in India, with more than 4,000 manufacturing and ancillary units in the Pimpri-Chinchwad region alone. Source: Maharashtra Industrial Development Corporation, https://midc.maharashtra.gov.in/en/focus-sectors/automobiles/ (checked 2026-11-07).
- **MIDC's land around the city.** MIDC lists a land bank of 8,000 acres along Pune, Chakan, Talegaon and Satara for sectors including engineering, auto and components, ESDM and logistics, plans to acquire 500 acres for Chakan Phase 5, and names Ranjangaon Phase 3 among its demand-led acquisitions. Source: Maharashtra Industrial Development Corporation, https://midc.maharashtra.gov.in/en/about-midc/ (checked 2026-11-07).

## Industries and products

- [Automotive components](https://www.emplotec.com/industries/manufacturing/automotive-components): For suppliers shipping to vehicle makers' lines: schedules with cumulatives, PPAP, 8D, rejection debits, bins and consignment.
- [Engineering and fabrication](https://www.emplotec.com/industries/manufacturing/engineering-and-fabrication): For build-to-order shops: each job costed from its drawing, with machining sent out on challan.
- [Metal casting, forging and steel](https://www.emplotec.com/industries/manufacturing/metal-casting-and-forging): For forge shops and foundries: heat numbers followed from the melt to the test certificate the customer receives.
- [Emplotec Manufacturing](https://www.emplotec.com/erp/manufacturing): MRP from OEM schedules, a finite-capacity board for the cells, and job work both ways.
- [Emplotec Quality](https://www.emplotec.com/erp/quality): Inspections that hold stock, PPAP packs, 8D and gauges blocked when overdue.
- [Emplotec CRM & Sales](https://www.emplotec.com/erp/crm-sales): OEM schedules with cumulatives, ASN, labels, returnable bins and rejection debits.
- [Emplotec Inventory](https://www.emplotec.com/erp/inventory): One stock ledger for the Chakan and Talegaon plants and the material at job workers.
- [Emplotec HRMS](https://www.emplotec.com/erp/hrms): Shifts, contract labour and payroll with Maharashtra Professional Tax and LWF.

## Working with us from Pune.

- **The free audit, over video.** One working session with your planner, quality head and accounts team, held remotely, then a written summary of a few pages within five working days. It costs nothing, and the summary is yours to keep whether or not we work together.
- **Same time zone, remote by default.** Pune and Chennai keep the same clock, so calls fall in your working hours. Implementation is remote unless the proposal agrees a visit to your plant.
- **Your schedules and challans first.** We start from a real week: one customer's schedule, the challans out at your job workers and the lots in QC. The migration agent brings masters and open documents across from Tally or spreadsheets and ties them out side by side.
- **Data moved in 48 hours, live in 30 days.** The proposal says what live covers, for example the Chakan plant and its main OEM first, then Talegaon. Each phase after the audit is a fixed fee, paid phase by phase.

## Questions and answers

### Do you have an office in Pune?

No. Emplotec Solutions Private Limited is in Madipakkam, Chennai. We work with Pune plants remotely, the free audit is held over video, and any visit to your plant is agreed in the proposal.

### Our OEM sends schedule revisions by email. Does someone still have to key them in?

No. The agent reads the schedule from the PDF, Excel sheet or email and drafts the lines with each part's cumulative. Your planner checks and accepts them before MRP or dispatch uses them.

### Half our heat treatment and plating is done by job workers in Bhosari. Can we see where every piece is?

Yes. Every challan shows what went out, what came back, what was rejected and what is still with the job worker, reconciled with each of them. Returned lots pass incoming inspection before they can be picked, and ITC-04 comes from the same records.

### Will Emplotec make us IATF 16949 compliant?

No software certifies a plant. Emplotec keeps the records an audit asks for, PFMEA, control plans, PPAP packs, SPC, calibration, internal and layered process audits and CAPA, in one place. Certification stays between you and your certification body.

### Does payroll handle Maharashtra Professional Tax and LWF?

Yes. PF, ESI, Professional Tax and LWF are computed for each plant on the Labour Codes, with the returns and registers. A person files and pays: the agent never files a statutory return or releases a payment on its own.

### We have plants in Chakan and Talegaon. Is that one licence?

Every company and branch is included, and each plant with them. Pricing is a fee per product plus seats, quoted once we know which products you need.

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- ERP in India: https://www.emplotec.com/erp/india.md
- Emplotec ERP: https://www.emplotec.com/erp.md
- Software Development Company in Pune: https://www.emplotec.com/services/india/pune.md
