# Promise dates your shop floor can keep.

> Emplotec Manufacturing runs BOMs, MRP and a finite-capacity schedule that checks orders against your machines and replans when a machine stops or a rush lands.

Page: https://www.emplotec.com/erp/manufacturing

MRP and a finite-capacity schedule check every order against your machines, and replan the moment a machine stops or a rush order lands.

## Emplotec Manufacturing in one line

BOMs, routings, MRP, a finite-capacity scheduling board, job work, OEE and job costing.

## A manufacturing ERP from drawing to dispatch.

BOMs, planning, the shop floor, job work and job cost run on one system with your stock and accounts, and Inventory is included.

### BOMs, routings and drawings

Every part's BOM, routing and drawing carries its revision, so the floor builds the current one.

- Multi-level BOMs with versions and alternates
- Routings, operations, workstations and capacities
- Engineering change notes
- A drawing register with revision control
- BOM import from CAD exports and drawings

### MRP and the schedule

Plan from real demand, load it onto real machines, and see what slips before you promise a date.

- MRP from orders, OEM schedules, reorder levels and planner forecasts
- What-if MRP beside the live plan
- A finite-capacity scheduling board
- Auto-scheduling on progress, breakdowns and rush orders
- Delivery promises from the schedule

### Work orders and the shop floor

Operators book work on a kiosk or the mobile app, with the right instructions for each operation in front of them.

- Work orders, job cards and kiosk entry
- Digital work instructions per operation
- Setup sheets, tool lists and CNC programs as versioned documents
- An operator certification check before a job card starts
- Scrap, rejection and rework
- Tool, die and mould life

### Job work, both ways

Material you send out stays in your stock, and material customers send you is tracked as theirs.

- Job work given: material out, received back and process loss
- Job-worker reconciliation with ageing
- ITC-04 from the challans
- Job work received: customer job orders and customer-owned material
- Return challans and conversion charges

### Job cost and performance

Each job's real cost and each machine's performance come from the job cards themselves.

- Material, labour, machine and overhead per job
- Planned against actual, with WIP valuation
- OEE and downtime
- Throughput, queue and dwell time per operation
- Quotes from similar past drawings and their actual job costs

### Supplying OEMs

Schedules, part numbers, containers and quality packs, the way your OEM customers ask for them.

- Delivery and cumulative schedules, with CRM & Sales
- Customer part numbers and labels
- Returnable containers and consignment stock
- Heat and batch traced, with Inventory
- PPAP, SPC and 8D, with Quality

## MRP software with a what-if before you commit.

MRP explodes every multi-level BOM against orders, OEM schedules, reorder levels and planner forecasts, and lists what to make and what to buy. A what-if run shows what a rush order, a schedule change or a machine down would do, beside the live plan, without committing anything.

- Demand from orders, OEM schedules, reorder levels and planner forecasts
- Multi-level BOMs with alternates
- Shortages raised as material requests for Procurement
- What-if runs compared with the live plan
- Nothing committed until a planner accepts

## Production scheduling software that knows your machines.

The scheduling board loads every operation onto the workstation that runs it, at that machine's real capacity. When work runs late, a machine stops or a rush order lands, auto-scheduling re-sequences the plan, and the planner approves it before anything moves.

- Finite capacity for every machine and line
- Auto-scheduling on progress, breakdowns and rush orders
- Breakdowns from Assets & Maintenance drop capacity
- Promise dates passed back to CRM & Sales
- Every replan shown as a plan to approve

## Job costing and OEE from every job card.

Job cards book material, labour and machine time to the work order as the work happens, with overhead absorbed, so each job's actual cost sits beside its plan. OEE and downtime come from the same job cards and downtime logs, and past job costs feed the next quote.

- Material, labour, machine and overhead per job
- Planned against actual, line by line
- WIP valuation
- OEE and downtime by machine
- Quotes from similar past drawings and their real costs

## Hand Emplotec the replanning.

Ask in plain words. Emplotec reads orders, stock, capacity and job cards, then shows you a plan. Nothing moves on the floor until a planner approves.

- "CNC-07 is down until Thursday. Reschedule and tell me which orders slip." → A new sequence and the customers affected, as a plan for the planner to approve.
- "Can we take 400 more valve bodies for 18 November?" → A what-if run against capacity and material, with nothing committed.
- "Quote this drawing." → Similar past parts, their real job costs and problems, and a costed draft quote.
- "Which job workers hold our material past 90 days?" → Each job worker's material with its ageing, and the ITC-04 position.

- Ask (Anand Krishnan, Managing director): "What did Sahyadri's rejected castings cost us this quarter, with rework, delays and debit notes?"
- Reads: Inspections, Job cards, Work orders, Debit notes
- Answer: Sahyadri's rejections cost ₹3,67,500 this quarter, and debit notes recovered ₹2,10,000, so ₹1,57,500 is still ours. I've drafted a summary for the vendor review, with every figure linked to its source.
- Action: Add to vendor review
- Why only on Emplotec: A standalone MES or a Tally add-on holds only part of it. Emplotec has the inspections, the job costs and the vendor debits in one place.

## One breakdown, from the machine to the customer.

Maintenance logs CNC-07 down, the schedule replans around it, and sales sees which customer to call, with nobody rebuilding a spreadsheet.

1. Assets & Maintenance: Maintenance logs CNC-07 down
2. Manufacturing: CNC-07's capacity drops until Thursday
3. Manufacturing: Schedule replanned, Ravi approves
4. Manufacturing: A slipping order gets a new promise date
5. CRM & Sales: Meera sees which customer to call

- [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md): Orders and delivery schedules Back: Promise dates from the schedule
- [Procurement](https://www.emplotec.com/erp/procurement.md): Open purchase orders, counted as supply in MRP Back: Material requests for shortages and bought-out parts
- [Inventory](https://www.emplotec.com/erp/inventory.md): Stock available Back: Issues, transfers and finished goods
- [Quality](https://www.emplotec.com/erp/quality.md): Inspection results, release checks and rejections Back: In-process inspections at operations
- [Assets & Maintenance](https://www.emplotec.com/erp/assets-maintenance.md): Breakdowns, so capacity drops Back: Machine-hour meters
- [HRMS](https://www.emplotec.com/erp/hrms.md): Operator skills and certifications
- [Field Service](https://www.emplotec.com/erp/field-service.md): Service jobs at customers' sites, with parts and time on each

## Deep enough for a job shop.

The parts of manufacturing that spreadsheets and add-ons get wrong are built into the core.

- **Actual job costing**: Each job carries its actual cost, with a standard cost for quotes and the variance between them.
- **Job work stays in your stock**: Material at a job worker stays in your inventory until it comes back, so ITC-04 comes from the challans.
- **Revisions on every BOM**: BOMs, routings and drawings carry revisions, and an engineering change note records each change.
- **Finite capacity, every replan**: The board loads each machine only up to its capacity, and each replan is a plan a planner approves.
- **One ledger under every work order**: Every work order posts through the same stock and ledger engines as the rest of Emplotec.
- **Tested before every release**: The manufacturing costing suite and the plan-to-produce flow must pass before anything ships.

## Shaped around how your plant runs.

Our team fits Manufacturing to your plant when you start, and Emplotec changes it on request once an admin approves.

- Routings and inspection plans per part
- Job-card fields and shop-floor screens
- ECN approvals
- Scheduling rules
- Job-work challan formats

## Keep Tally for accounts.

Production, stores and job work on Emplotec, accounts synced to Tally, until the move to Books. The migration agent brings your items and stock across from Tally and Excel, and proves the move against the source.

- We map your items, BOMs and routings with your team.
- The migration agent moves them, after a dry run you check.
- Stock is tied out against the source, item by item.
- Accounts keep syncing to Tally while the plant runs on Emplotec.
- Move the accounts to Books when you choose.

## Built for the rules where you work.

The plant runs the same way in every market. What changes is how job work is recorded, the tax on what you dispatch and the currency.

### India: Job work, ITC-04 and GST, built in.

Material at job workers stays in your stock, ITC-04 comes from the challans, and every dispatch reaches GST through Books.

1. Job-work challan to Kaveri Castings (Sent)
2. Castings back, process loss booked (Received)
3. ITC-04 drawn from the challans (For review)
4. Dispatch to Haldane Pumps with its e-invoice, in Books (Invoiced)

- Job work given and received, with ITC-04
- Job-worker reconciliation with ageing
- GST on dispatches and conversion charges, through Books
- E-invoices on dispatch, through Books
- Tally sync for accounts
- ₹, Indian digit grouping and DD-MM-YYYY

### UAE: Mainland and free-zone plants, VAT on every dispatch.

Each plant can sit in its own entity, on the mainland or in a free zone, and every dispatch and conversion charge carries VAT into Books for the VAT return and e-invoicing.

1. Subcontracting challan to Ras Al Khor Castings (Sent)
2. Castings back, process loss booked (Received)
3. Dispatch to Haldane Pumps with VAT, in Books (Invoiced)
4. Figures in Books' VAT return (For review)

- VAT on dispatches and conversion charges, through Books
- E-invoicing on dispatch, through Books
- Mainland and free-zone entities
- Corporate tax from the same ledger, in Books
- WPS payroll for operators, with HRMS
- Subcontracting challans and reconciliation

### Saudi Arabia: VAT and FATOORA on every dispatch.

Production runs the same way; each dispatch and conversion charge carries VAT, and Books issues its ZATCA e-invoice (FATOORA).

1. Subcontracting challan to Najd Castings (Sent)
2. Castings back, process loss booked (Received)
3. Dispatch to Haldane Pumps, FATOORA e-invoice in Books (Invoiced)
4. Figures in Books' VAT return (For review)

- VAT on dispatches and conversion charges, through Books
- ZATCA e-invoicing (FATOORA), through Books
- GOSI payroll for operators, with HRMS
- Subcontracting challans and reconciliation
- Riyals, with any other currency per order

### UK: VAT under Making Tax Digital, from the shop floor.

Every dispatch and conversion charge carries VAT into Books, which keeps the VAT return under Making Tax Digital, and operators' hours reach PAYE payroll through HRMS.

1. Delivery note to Tyne Castings for machining (Sent)
2. Castings back, process loss booked (Received)
3. Dispatch to Haldane Pumps with VAT, in Books (Invoiced)
4. Figures in the MTD VAT return, in Books (For review)

- VAT on dispatches and conversion charges, through Books
- VAT returns under Making Tax Digital, through Books
- PAYE payroll with RTI for operators, with HRMS
- Subcontracting and reconciliation
- Pounds, with any other currency per order

### US: Sales tax by state on every shipment.

Each shipment and conversion charge carries the right state's sales tax through Books, and subcontractors you pay get their 1099 forms from the same ledger.

1. Material shipped to Ohio Valley Castings for machining (Shipped)
2. Castings back, process loss booked (Received)
3. Shipment to Haldane Pumps with state sales tax, in Books (Invoiced)
4. 1099 for the subcontractor, in Books (Drafted)

- Sales tax by state, through Books
- 1099 forms for subcontractors, through Books
- Payroll for operators, with HRMS
- Subcontracting and reconciliation
- Dollars, with any other currency per order

## Start with Manufacturing. Add the rest when you need it.

- [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md): Quotes carry a promise date from the schedule, and OEM schedules feed MRP.
- [Procurement](https://www.emplotec.com/erp/procurement.md): MRP shortages become POs from the right vendor, received, inspected and matched.
- [Quality](https://www.emplotec.com/erp/quality.md): Inspections at each operation hold or release stock, and rejections reach the vendor.
- [Books](https://www.emplotec.com/erp/books.md): WIP, absorption and the close true-up post to the same ledger as every job.

## Questions and answers

### Is Emplotec Manufacturing a complete manufacturing ERP?

Manufacturing covers BOMs, MRP, scheduling, the shop floor, job work and job costing, and Inventory is included. Add CRM & Sales, Procurement, Quality and Books and it becomes the complete Emplotec ERP, on one data model and one ledger.

### Does the MRP plan against machine capacity?

MRP works out what to make and buy from orders, OEM schedules, reorder levels and planner forecasts. The finite-capacity scheduling board then loads each operation onto its machine at real capacity, and promise dates come from that schedule.

### What happens when a machine breaks down?

Maintenance logs the breakdown, the machine's capacity drops, and auto-scheduling re-sequences the work around it. Emplotec shows which orders slip and proposes new promise dates, and the planner approves the plan before anything moves.

### Does it handle job work and ITC-04?

Yes, both ways. Material sent to job workers stays in your stock until it returns, with process loss, reconciliation and ageing, and ITC-04 comes from the challans. Job work you do for customers tracks their material, return challans and conversion charges.

### Can we keep Tally for our accounts?

Yes. Production, stores and job work on Emplotec, accounts synced to Tally, until the move to Books.

### How is Emplotec Manufacturing priced?

Manufacturing is licensed as a product, with Inventory included. Planners and stores use full seats, shop-floor kiosks use device seats, and the MD and plant head use lower-priced team seats. We quote once we've seen how your plant runs.

### How long does it take to go live?

Your data is moved in 48 hours, and you're live in 30 days. Your proposal sets out what live covers: which plants, companies and products.

### What doesn't Manufacturing do?

Emplotec doesn't cover process manufacturing, such as formulas, potency and GMP. Scheduling is a finite-capacity board with auto-scheduling, not a constraint-based optimiser, and OEE comes from job cards and downtime logs, not machine sensors. It doesn't integrate with PLM or CAD tools, though BOMs import from CAD exports, and planners enter their own forecasts rather than the system predicting demand.

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- CRM & Sales: https://www.emplotec.com/erp/crm-sales.md
- Procurement: https://www.emplotec.com/erp/procurement.md
- Quality: https://www.emplotec.com/erp/quality.md
- Books: https://www.emplotec.com/erp/books.md
