# Factory licence renewal under the OSH Code: what changed, documents, fees and state portals

> Who needs a factory licence now that the OSH Code applies, what changed from the Factories Act, how renewal works in Tamil Nadu, Maharashtra, Karnataka and Gujarat, and the documents and dates to plan for.

Page: https://www.emplotec.com/guides/factory-licence-renewal · Updated: 2026-11-06

Published: 2026-11-06 · Modified: 2026-11-06 · 9 minute read · Market: India

## Who needs a factory licence now?

Since 21 November 2025 the Occupational Safety, Health and Working Conditions Code, 2020 (the OSH Code) has applied in place of the Factories Act, 1948 and twelve other labour laws. Under the Code, premises are a factory if 20 or more workers work there with the aid of power, or 40 or more without power, on any day of the preceding twelve months. The old thresholds were 10 and 20. A factory must hold a licence under section 79 of the Code and renew it before it expires.

|  | Factories Act, 1948 | OSH Code, 2020 |
| --- | --- | --- |
| Factory threshold | 10 workers with power, 20 without | 20 workers with power, 40 without |
| Registration | Factory registration and licence under the Act and state rules | Registration of the establishment (section 3) plus a factory licence (section 79) |
| One licence for several activities | Separate licences for the factory and for contract labour | One common licence can cover the factory, contract labour and beedi and cigar premises (section 119) |
| Existing licences |  | A licence obtained under an earlier central labour law is treated as obtained under the Code, until it expires (section 119(5)) |
| Procedure, forms, fees and validity | State Factories Rules | State OSH rules, as each state notifies them |

> Note: A unit that has dropped below the new threshold (say 15 workers with power) is no longer a factory under the Code, but it still needs registration under the Code if it has 10 or more workers, and its pollution consents, fire NOC and other licences do not change. Confirm with the state department before you stop renewing.

## What changed in practice: states are moving at different speeds

The Code sets the framework, but the forms, fees, validity periods and portals come from each state's rules. The central OSH rules were notified in May 2026; states have moved at different speeds, so in November 2026 renewal still looks different from one state to the next.

| State | Where things stand | Department and portal |
| --- | --- | --- |
| Tamil Nadu | The Directorate's October 2026 notice for 2027 licences still cites the Factories Act, 1948 and the Tamil Nadu Factories Rules, 1950. Renewal for the coming calendar year is due by 31 October; after payment the renewed licence is generated online | Directorate of Industrial Safety and Health (DISH), dish.tn.gov.in |
| Maharashtra | Draft OSH rules for factories published in 2026; renewals continue through the state's online licensing system | The state's industrial safety and health directorate, through the MAITRI licence management system |
| Karnataka | Draft OSH rules published in January 2026; final rules awaited | Department of Factories, Boilers, Industrial Safety and Health, online services |
| Gujarat | Gujarat OSH Rules, 2025 notified (Gazette, 12 June 2025), with factory licensing in rules 70 to 79 and a revised fee schedule. A DISH notice of 13 October 2026 asked factories to pay the difference between old and revised fees by 31 October 2026 | DISH Gujarat, dish.gujarat.gov.in |

Read your state's latest notice before each renewal. Where final OSH rules are in force, forms and fee slabs may change at renewal; where they are not, the old Factories Rules procedure continues, with the Code's thresholds and the common licence applying from 21 November 2025.

## When to renew a factory licence

- Tamil Nadu: licences run by calendar year. Apply and pay for the next year's renewal on or before 31 October; late applications attract penalties under the Act and Rules.
- Maharashtra: the Maharashtra Factories Rules, 1963 ask for the renewal application at least two months before the licence expires.
- Other states: most ask for the renewal application 30 to 60 days before expiry; the state rules set the exact period.
- Many states let you renew for several years at once by paying the fee for each year; the portal shows the periods allowed.
- Any change in the occupier, the manager, the installed power or the maximum number of workers above the licensed figures needs an amendment of the licence, not just a renewal.

> Warning: Plants that miss the date usually do so because nobody owns the licence. The HR head thinks it is the plant admin's, the plant admin thinks the consultant does it, and the consultant waits to be asked.

## Documents for factory licence renewal

| Document | Why it is needed | Tip |
| --- | --- | --- |
| Current factory licence | Number, validity, licensed workers and power | Keep a scan; the portal often asks for the number only |
| Renewal application in the state's form | Occupier, manager, workers, power, products | Most state Factories Rules use Form 2 for grant and renewal |
| Maximum workers employed on any day of the year | Fee slab and licence limits | Take it from attendance records, including contract workers |
| Installed power (HP or kW) | Fee slab | Match the electricity bill's connected load and the machinery list |
| Occupier and manager details | Legal responsibility | Update the licence if either changed in the year |
| Fee payment challan or receipt | Proof of payment | Online on most state portals |
| Stability certificate | Building safety | Required periodically in many states; check if yours is due |
| Consent to operate from the pollution control board | Often asked with renewal or amendment | Keep the consent order and fee period at hand |
| Fire NOC, where applicable | Fire safety | Required for many plants by building height and hazard |
| Safety audit or on-site emergency plan | Hazardous processes and major accident hazard units | Due on their own cycles; inspectors ask for them |

## Factory licence fees: how they are worked out

Every state charges the licence fee from a schedule that crosses two things: the installed power (in HP or kW) and the maximum number of workers employed on any day of the year. A plant with 300 workers and 1,000 HP pays several times what a 30-worker shop with 50 HP pays. The schedules differ widely between states, and Gujarat revised its fees under its OSH rules, so read the current schedule on the state portal; most portals compute the fee once you enter the figures.

- Late renewal usually costs a surcharge on the fee, set by the state (in Gujarat's fee-difference notice, 25% of the year's difference).
- Paying for several years at once saves the yearly paperwork; check whether your state allows it.
- If the workers or power go above the licensed figures during the year, amend the licence and pay the difference.

## The renewal process, step by step

1. Sixty days before the due date, confirm who owns the renewal and read the state's latest notice.
2. Collect the year's maximum workers (including contract workers) and the installed power; compare them with the licence.
3. Check the supporting documents that expire on their own cycle: stability certificate, consent to operate, fire NOC.
4. Log in to the state portal with the factory's credentials, open the renewal application and fill the figures.
5. Pay the fee online and download the receipt.
6. Download the renewed licence (generated automatically after payment in Tamil Nadu), or track the application until it is issued.
7. Display the licence at the factory, and file the receipt and licence where an inspector can see them.
8. Put the next renewal date in the calendar with an owner and a reminder.

## A worked example: one plant's renewal for 2027

Nordwerk Components (an example company) runs Plant 1 at Sriperumbudur, Tamil Nadu. Its licence was issued for 300 workers and 1,500 HP. In 2026 the plant installed two VMCs and a compressor, and its attendance shows a maximum of 286 workers on one day in March, including 64 contract workers.

| Check | Finding | Action |
| --- | --- | --- |
| Workers | 286, within the licensed 300 | No amendment needed |
| Installed power | 1,500 HP licensed; 1,610 HP now installed | Apply for amendment with the renewal; pay the higher slab |
| Manager | Changed in June 2026 | Update the manager's details on the licence |
| Stability certificate | Valid to March 2027 | Plan the next one before it lapses |
| Consent to operate | Valid; fee period runs to 2031 | Attach if asked |
| Due date | 31 October 2026 for the 2027 licence | Applied and paid on 17 October; renewed licence downloaded |

Without the power check, Nordwerk would have renewed at the old slab and been short-licensed for 110 HP, which an inspector reads straight off the machinery list.

## Common mistakes with factory licence renewal

- Counting only permanent workers. Contract workers count towards the threshold and the fee slab.
- Renewing without amending after adding machines or workers above the licensed figures.
- Not updating the occupier or manager after a change; the licence still names the old person.
- Assuming the OSH Code removed the need to renew. Existing licences stay valid until they expire, and states still require renewal.
- Keeping licences in one person's email. The licence, the receipt and the renewal date belong in a register the plant can see.

## Or never let a factory licence lapse again.

In Emplotec Compliance, every licence sits in the licences register with its plant, owner, reviewer, renewal date, proof and penalty, on one calendar with everything else the plant must file or renew.

- Applicability comes from the organisation, such as the kind of plant, the state and the headcount, and a person confirms it.
- Each renewal goes to its owner with reminders, and escalates when it isn't done; the item closes with the renewed licence attached.
- Content for central laws and Tamil Nadu shows each obligation's source and the date it was last reviewed, and a partner CA firm reviews every change.
- Statutory inspections of boilers, lifts and pressure vessels from Assets & Maintenance sit on the same calendar.

Read more: [Emplotec Compliance](https://www.emplotec.com/erp/compliance.md)

## Questions and answers

### Is a factory licence still needed under the OSH Code?

Yes. A factory needs a licence under section 79 of the OSH Code, 2020, in force from 21 November 2025. Licences issued under the Factories Act stay valid until they expire and are then renewed under the state's rules.

### How many workers make a unit a factory under the OSH Code?

20 or more workers with the aid of power, or 40 or more without power, on any day of the preceding twelve months. Contract workers count.

### What is the last date for factory licence renewal in Tamil Nadu?

31 October of the year before the licence year. For the 2027 licence it was 31 October 2026, paid on the DISH portal, with penalties for applications after that date.

### How is the factory licence fee calculated?

From the state's schedule, by the installed power (HP or kW) and the maximum number of workers on any day of the year. The state portal usually computes it when you enter the figures.

### What documents are needed to renew a factory licence?

The current licence, the renewal application in the state's form, maximum workers and installed power, occupier and manager details and the fee receipt. Many states also ask for a valid stability certificate and the consent to operate.

### Can one licence cover the factory and contract labour?

Yes. Section 119 of the OSH Code allows one common licence for a factory, contract labour and beedi and cigar premises, or any two of them, applied for electronically to the authority the state notifies.

## Sources

- [Occupational Safety, Health and Working Conditions Code, 2020, Ministry of Labour and Employment](https://labour.gov.in/)
- [Directorate of Industrial Safety and Health, Tamil Nadu](https://dish.tn.gov.in/)
- [Maharashtra licence management system (factory licences), MAITRI](https://lms.mahaonline.gov.in/)
- [Labour Department, Government of Karnataka](https://labour.karnataka.gov.in/)
- [Directorate of Industrial Safety and Health, Gujarat](https://dish.gujarat.gov.in/)

## Related

- [/erp/compliance](https://www.emplotec.com/erp/compliance.md)
- [/guides/consent-to-operate](https://www.emplotec.com/guides/consent-to-operate.md)
- [/tools/compliance-calendar](https://www.emplotec.com/tools/compliance-calendar.md)
- [/templates/hira-format](https://www.emplotec.com/templates/hira-format.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All guides: https://www.emplotec.com/guides.md
- /erp/compliance: https://www.emplotec.com/erp/compliance.md
- /guides/consent-to-operate: https://www.emplotec.com/guides/consent-to-operate.md
- /tools/compliance-calendar: https://www.emplotec.com/tools/compliance-calendar.md