# MIS report: what management reporting should show each month, by industry

> A practical guide to management reporting: the types of MIS report, what the monthly pack should contain, the measures that matter in each industry, and how to write commentary owners read.

Page: https://www.emplotec.com/guides/mis-report · Updated: 2026-11-06

Published: 2026-11-06 · Modified: 2026-11-06 · 9 minute read · Market: India

## What an MIS report is

An MIS report (management information system report) is the set of figures and comments that tells the people running a business how it did and what needs a decision. It is internal. No law prescribes its format, which is why every company's MIS looks different and why most of them are too long.

Management reporting differs from statutory reporting in three ways. It is faster: days after the month ends, not months after the year ends. It is about the business, not the legal entity: plants, product lines, projects and customers rather than the balance sheet headings of Schedule III. And it compares: against budget, against last year and against the targets the owners set, because a figure on its own tells nobody what to do.

> Note: A good test for any line in an MIS report: if the number moved sharply, would someone do something different? If not, it belongs in an appendix or nowhere.

## Types of MIS reports

| Report | For | How often | What it answers |
| --- | --- | --- | --- |
| Daily flash | Owner, plant head, sales head | Daily | Sales booked, dispatches, collections, cash, production against plan |
| Weekly operations review | Department heads | Weekly | Orders, backlog, overdue receivables, stock-outs, breakdowns, open complaints |
| Monthly MIS | Owner, MD, management team | Monthly, by working day 5 | Profit against budget, cash and working capital, the main measures, and why they moved |
| Board pack | Board of directors, investors, lenders | Quarterly | Results, outlook, risks, compliance, capital spending and decisions needed |
| Project or contract report | Project managers, client | Weekly or monthly | Cost to complete, progress, billing against work done, margin |
| Functional reports | Each department | As needed | Receivables ageing, stock ageing, payroll cost, purchase price variance, quality |

Most of the value sits in the monthly MIS. The daily and weekly reports should feed it, using the same definitions, so the month's figures never surprise anyone.

## What a monthly MIS report should include

Seven parts, in this order. The first page should be enough for an owner with five minutes.

1. Summary: six to ten numbers for the month and the year to date, each against budget and last year, with a one-line comment on each that moved.
2. Profit and loss: revenue, gross margin, the main overheads, EBITDA and profit, for the month and year to date, against budget and last year, with the variance in rupees and percent.
3. Cash and working capital: cash and bank balances, borrowings and limits used, receivables days, inventory days, payables days, and the cash forecast for the next 13 weeks.
4. Sales: by customer, product line and region, with the order book or pipeline that will become next month's revenue.
5. Operations: the three to five measures that drive cost in your industry (see the table below).
6. Exceptions and actions: what went wrong, who owns it and by when. Carry last month's actions forward until they are closed.
7. Commentary: a short narrative of what happened and why, written for the reader, not the preparer.

Our free MIS report format in Excel lays out the summary and the P&L against budget with the variance formulas built in.

## MIS report measures by industry

The finance pages look similar in every business. The operations page is where industries differ, and where most MIS reports are weakest.

| Industry | Measures to report every month |
| --- | --- |
| Manufacturing | Capacity utilisation and OEE by line; material cost as % of sales and yield; scrap and rework %; contribution per machine hour; on-time delivery; order book in months |
| Distribution and trading | Gross margin by brand and principal; fill rate; stock days and non-moving stock; scheme and claim receivables from principals; collection efficiency by salesperson |
| Construction and EPC | For each project: contract value, work done, billed, certified and collected; cost to complete and forecast margin; unbilled work; retention held; mobilisation advance left to recover |
| Software and IT services | Billable utilisation; revenue and margin per head; unbilled revenue; DSO; bench strength; attrition; revenue at risk from contracts up for renewal |
| Facility management and manpower | Headcount deployed against billed; margin by site; wage cost per shift; statutory payments (PF, ESI) made on time; billing turnaround after attendance lock |
| Real estate development | Bookings and cancellations; collections against demand raised; unsold inventory; construction progress against the RERA schedule; cash in the designated project account |

## Worked example: a one-page monthly summary

Nordwerk Components Pvt Ltd, an auto component maker, closes October 2026 on working day 2. Figures in ₹ lakh.

| Measure | October 2026 | Budget | October 2025 | Comment |
| --- | --- | --- | --- | --- |
| Revenue | 862 | 840 | 744 | Up 2.6% on budget: Kaveri Motors pulled forward November schedules |
| Gross margin | 31.8% | 33.0% | 32.4% | Aluminium ingot up 6% (₹11 lakh), scrap on line 3 (₹7 lakh) |
| EBITDA | 118 | 126 | 104 | 13.7% against 15.0% budget |
| Receivables | 1,940 | 1,680 | 1,610 | 68 days against a 60-day target; two OEMs paying late |
| Inventory | 1,210 | 1,150 | 1,090 | 52 days; ingot bought ahead of a price rise |
| Cash and bank | 214 | 300 | 188 | Working capital limit 72% used |
| Order book | 3,460 | 3,300 | 2,980 | 4.0 months of revenue |
| OEE, machining | 71% | 75% | 69% | Line 3 spindle breakdown, 38 hours lost |
| Scrap | 2.4% | 1.8% | 2.1% | Porosity on housing castings from one die; die repaired 26 October |

Read the page from the top: revenue is ahead, profit is behind, and cash is short. The comments say why in a line each. The actions follow: pass the ingot increase through under the price variation clause, chase the two late OEMs, and watch scrap on the repaired die for two weeks.

## How to write MIS commentary that gets read

| Weak | Better |
| --- | --- |
| Gross margin decreased compared to budget due to various factors. | Gross margin was 1.2 points below budget: ingot cost added ₹11 lakh and line 3 scrap ₹7 lakh. |
| Debtors have increased. | Receivables rose to 68 days. Two OEMs owe ₹2.1 crore past due; both promise payment by 15 November. |
| Production was lower this month. | OEE on machining fell to 71% because the line 3 spindle failed (38 hours). The spare is now held in stock. |

- Lead with the number and the cause, in rupees, not adjectives.
- Explain only what moved beyond your threshold, for example 5% or ₹5 lakh against budget.
- Say what is being done and by whom. A comment with no action is a description.
- Keep it to one page. If the board wants detail, it will ask.

## The budget: what the MIS compares against

An MIS without a budget can only say that this month differs from last month, and most months differ for reasons nobody controls: festivals, plant shutdowns, a customer's year end. The comparison that leads to action is against a plan.

- Phase the annual budget by month. Splitting the year into twelve equal parts makes every seasonal month look like a variance.
- Budget at the level you report: by plant, product line or project, not only for the company as a whole.
- Keep the budget fixed for the year, and show a reforecast beside it from the second quarter. Changing the budget hides the variances it was meant to show.
- Agree a variance threshold, such as 5% or ₹5 lakh, so department heads explain what matters and not every line.

## A monthly MIS calendar

The MIS is only as fast as the month-end close behind it. Indian SMEs often send it on day 15 or later because the books are not closed. A calendar that most businesses can reach:

| Working day | What is done |
| --- | --- |
| Day 1 | Sales and purchase cut-off; stock taken or confirmed; attendance locked; bank reconciled |
| Day 2 | Accruals and provisions booked (expenses, unbilled revenue, rebates), depreciation run, inter-company matched; books closed |
| Day 3 | MIS figures produced from the closed books; variances above the threshold explained by department heads |
| Day 4 | Commentary written and reviewed by the finance head |
| Day 5 | MIS sent to the owner and management team; review meeting fixed |

For a company board, Section 173 of the Companies Act requires at least four board meetings a year with no more than 120 days between two meetings, so the board pack follows a quarterly rhythm. Listed companies must also publish quarterly results within 45 days of the quarter end under Regulation 33 of the SEBI Listing Regulations.

## Common mistakes in management reporting

- Thirty pages of tables and no summary. The owner reads page one, so page one must carry the message.
- Figures that don't tie to the books. If MIS revenue differs from the ledger, nobody trusts the rest of the report.
- Changing definitions from month to month: gross margin with freight one month and without it the next.
- No budget, so there is nothing to compare against except last month.
- Profit with no cash. A business can beat its profit budget and run out of money in the same quarter.
- Built by hand in Excel from a Tally export every month, which takes a week and breaks when a ledger is renamed.
- Commentary written by the preparer for the preparer: what was done, rather than what it means.

## Your MIS, ready on the first working day.

Emplotec Analytics builds the monthly MIS and board pack from the closed books, in the format your industry uses, with the commentary drafted by the agent. A person accepts it before it is sent.

- The MIS is scheduled after close and delivered by email and WhatsApp once accepted.
- Every figure drills down to the invoices, job cards and entries behind it.
- Ask why a number moved in plain words, and see the query Emplotec ran to answer.
- Power BI, Tableau and Excel connect at no extra charge, and nothing is charged per viewer.

Read more: [Emplotec Analytics](https://www.emplotec.com/erp/analytics.md)

## Questions and answers

### What is an MIS report?

A management information system report: the figures and comments that tell the people running a business how it performed against budget and last year, and what needs a decision. It is internal and has no prescribed format.

### What should a monthly MIS report include?

A one-page summary, the P&L against budget and last year, cash and working capital, sales and order book, the operating measures for your industry, exceptions with owners, and short commentary.

### What are the types of MIS reports?

By frequency: daily flash reports, weekly operations reviews, the monthly MIS and the quarterly board pack. By subject: sales, receivables, inventory, production, project, payroll and cash reports.

### What is the difference between an MIS report and financial statements?

Financial statements are statutory, follow Schedule III and the accounting standards, and report the legal entity once a year. An MIS report is internal, monthly, organised by how the business runs, and compares against budget.

### How soon after month end should the MIS be ready?

Within five working days is achievable for most businesses that close their books on time. If the MIS takes two weeks, fix the month-end close first.

### Who prepares the MIS report?

Usually the accounts team or the outside CA, with each department head explaining the variances in their area. The finance head or CFO reviews it before it goes to the owner or board.

## Sources

- [Companies Act, 2013: Section 173 (board meetings) and Schedule III, India Code](https://www.indiacode.nic.in/)
- [SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015: Regulation 33 (financial results)](https://www.sebi.gov.in/)
- [ICAI: Ind AS 108 Operating Segments, and Guidance Note on Division II of Schedule III](https://www.icai.org/)

## Related

- [/erp/analytics](https://www.emplotec.com/erp/analytics.md)
- [/templates/mis-report-format](https://www.emplotec.com/templates/mis-report-format.md)
- [/guides/unbilled-revenue](https://www.emplotec.com/guides/unbilled-revenue.md)
- [/erp/books](https://www.emplotec.com/erp/books.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All guides: https://www.emplotec.com/guides.md
- /erp/analytics: https://www.emplotec.com/erp/analytics.md
- /templates/mis-report-format: https://www.emplotec.com/templates/mis-report-format.md
- /guides/unbilled-revenue: https://www.emplotec.com/guides/unbilled-revenue.md