# ERP for electronics manufacturing: Every serial traced to the reel. Every shortage planned around.

> ERP for electronics manufacturing: BOM revisions and ECNs, approved alternates in MRP, serials traced to the component reel, test records and warranty claims.

Page: https://www.emplotec.com/industries/manufacturing/electrical-and-electronics

For assemblers of LED drivers, controllers, panels, switchgear, motors and meters, and for EMS houses: BOM revisions and ECNs, approved alternates in MRP, imported parts at landed cost, and every serial with its component lots, test and burn-in record. One system, with an agent that works across all of it.

Who it is for: electronics manufacturers

## Runs on

- Manufacturing
- Inventory
- Procurement
- Quality
- CRM & Sales
- Books
- Field Service
- Planning

## Every serial, from the reel to the margin.

Emplotec follows Lumexa's drivers from the component stores through the line and the burn-in racks, and people approve every plan it drafts.

- The component stores: LD-7731 is 7,400 short, so Emplotec plans the approved alternate and a distributor buy.
- Goods in: Each reel is scanned in with its lot and date code, held until checked.
- The SMT line: Every serial records the reels loaded on the line, alternate IC included.
- Test and burn-in: BC-28's no-start failures all carry capacitor lot C-2207, so containment is drafted.
- Dispatch: The serial list Lumexa asks for leaves with the e-invoice and e-way bill.
- The returns bench: Aerodyne's returns trace to lot C-2207, so Emplotec drafts the 8D and claim response.
- Board cost: Landed component cost per driver, at today's rupee, against the quote.

## Does your week look like this?

These are the moments the BOM spreadsheet and the test station PC stop keeping up.

- Today: A ₹40 IC is short and a 12,000-unit order stops. The alternate was approved months ago, in an email nobody can find. (Email and Excel) Fix: Approved alternates sit on the BOM with the ECN that approved them. MRP uses them before it reports a shortage, and every serial records which part it carries.
- Today: The ECN moved the BOM to rev E, and the line built 600 boards on rev D. (BOM_final_v3.xlsx) Fix: BOMs have revisions and ECNs with approvals and an effective work order. The line can only issue the revision in force, and old stock and WIP are decided before release.
- Today: A brand calls with a failed unit's serial, and it takes a day to find when it was built, what went into it and how it tested. (Registers and test logs) Fix: Every serial carries its work order, BOM revision, component lots from the reels, and its test and burn-in record. One search, forward or back.
- Today: Test and burn-in results sit on the station PC as CSV files nobody links to the serial. (Test station PCs) Fix: Results are recorded against the serial on the test plan, failures open NCRs, and first-pass yield is shown by product, station and component lot.
- Today: Imported parts are costed at the quote's exchange rate. Duty and freight never reach the item cost. (Tally) Fix: Every bill of entry posts duty, freight and clearing into landed cost, so each board's cost is real and you see what the rupee does to every product.
- Today: A brand's warranty debit arrives as a total, and it gets accepted because checking 38 serials takes too long. (Email and Excel) Fix: Each claim is matched to its serial, build date, test record and component lots. You accept what is yours, dispute the rest with records, and recover from the vendor.
- Today: A tray of MSL 3 ICs sat open over the weekend, and nobody knows whether it went on the line on Monday. (A label and a pen) Fix: Floor life is counted per reel from the moment the dry pack opens. A reel past its limit can't be issued until it is baked, and the baking is logged.
- Today: Returned units pile up on the bench, and the customer asks every week which ones were replaced. (A returns register) Fix: Every return has its authorisation, its serial's full build and test record, a fault found and a decision, with replacements and credit notes raised from the same record.

## One ERP for electronics manufacturing, from the BOM to the warranty claim.

Planning, the line, stores, serials, tests, warranty claims, purchase and accounts run on one system, set up for electronics assembly. BOMs, components, serials, tests and money share the same data from day one.

### Start with: [Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

BOMs with revisions, ECNs and approved alternates, MRP, a line board for SMT and assembly, stencil life, work orders that assign serials, and board cost.

- Alternates used before a shortage is reported
- ECNs with an effective work order
- BOM import from CAD exports

### Start with: [Inventory](https://www.emplotec.com/erp/inventory.md)

Components by reel, lot and date code with MSL floor life and baking, finished goods by serial, and customers' free-issue parts, on one ledger. Included with Manufacturing.

- Serial genealogy down to the reel
- Lots held in QC until released
- Customers' own components kept apart

### Add next: [Procurement](https://www.emplotec.com/erp/procurement.md)

Shortages become RFQs to distributors, imports carry the bill of entry, duty and freight into landed cost, and every PO is matched before payment.

- Quotes from distributors in one comparison
- Bill of entry, duty, IGST credit and landed cost
- Approved vendor lists per part

### Add-on: [Quality](https://www.emplotec.com/erp/quality.md)

Incoming checks on components, test and burn-in records by serial, NCR and 8D, and failures traced to the lot and the supplier.

- Test records against every serial
- Failures traced to the component lot
- 8D for brands, corrective action for vendors

### Add next: [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md)

Brands' POs read into orders, blanket orders and call-offs, ECN approvals on the customer's page, warranty claims matched to debits, and returns of your products from authorisation to replacement or credit.

- POs read from PDF into draft orders
- Warranty claims checked serial by serial
- Promise dates from stock and capacity

### Add-on: [Field Service](https://www.emplotec.com/erp/field-service.md)

Panels, switchgear, UPS and meters at your customers' sites: warranty and AMC calls checked against cover, a service engineer matched by skill and certification with the part in the van, and the signed report billed the same day.

- Every installed unit by serial
- Engineers matched by skill and certification
- Signed report becomes the invoice

### Add-on: [Planning](https://www.emplotec.com/erp/planning.md)

The year's budget by plant and product line from your own orders, routings, people and ledger, with the CMA data your bank asks for at renewal, in that bank's own template.

- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario

## One order, from Lumexa's PO to cash.

Lumexa's 12,000 LED drivers, followed through every product they touch, shortage included. Nobody re-enters anything, and every step is a record you can open.

1. **CRM & Sales: Lumexa's PO comes in.** Lumexa emails a PO for 12,000 LD-40W drivers. Emplotec reads the PDF into a draft order with Lumexa's SKU mapped to our item and BOM rev E, and Meera confirms it.
2. **Manufacturing: MRP uses the approved alternate.** MRP explodes rev E against stock. LD-7731 is 7,400 short, so it takes the 5,200 approved XC-7731A first and leaves 2,200 to buy.
3. **Procurement: A spot buy from the distributor.** Ravi raises the PO for a full reel of 2,500 at Novacomp's spot price. Anand approves it on his phone, because it is above the contract rate.
4. **Inventory: Received by reel and date code.** Arun scans the reel at the gate. The GRN carries the reel number, lot and date code, and the reel waits for its incoming check before the line can use it.
5. **Manufacturing: Built, serialised, every lot recorded.** SMT-1 builds the boards and each one gets its serial. The reels loaded on the line are recorded against every serial, so serials 04601 to 09800 show XC-7731A.
6. **Quality: Tested and burned in, per serial.** Each driver is tested at TS-3 and runs 8 hours of burn-in at 45 °C. Karthik's results land on the serial, and a failure opens an NCR instead of a note in a log.
7. **Books: Shipped with the serial list, paid.** Arun raises the e-invoice and e-way bill at dispatch and attaches the serial list Lumexa asks for. When Lumexa pays, the receipt matches by itself and the order's margin is final.

## Ask your plant anything.

Emplotec reads across BOMs, components, serials, tests and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

- Ask: "Can we take Gridline's 5,000 meter boards for December?"
- Reads: Line board, Burn-in racks, Gridline's free-issue stock, BOM GM-1, Last conversion charges
- Answer: Yes, by 18 December, if Gridline sends 1,200 more MCUs by 4 December. I've drafted the reply for Meera at last order's conversion charge.
- Plan: Reply to Gridline
-   - GM-1 boards: Asked 5,000 → 5,000 by 18 Dec
-   - Gridline's MCUs: 3,800 held → 1,200 more by 4 Dec
-   - Conversion charge: None → ₹96 a board

- Ask: "Which parts are single-source with a lead time over eight weeks?"
- Reads: Approved vendor lists, Approved alternates, Lead times, BOMs, Open orders
- Answer: Three parts could stop a product line on their own. I've drafted ECN requests for alternates on two of them and an RFQ to a second transformer maker.
- Plan: Second sources
-   - GD-6230: Single source → ECN-121 to Aerodyne
-   - C-47450: Single source → ECN-122 to Lumexa
-   - EE25 transformer: Kalinga only → RFQ to two makers

- Ask: "Quote Lumexa's new LD-60W from this BOM."
- Reads: BOM LD-60W (Excel), Item master, Last purchase prices, LD-40W job costs, Placement counts
- Answer: A draft at ₹462 a driver for 10,000, with today's exchange rate in the landed cost and the new parts at budget prices until quotes come in. Lead time is six weeks from PO.
- Plan: Quote QT-1044 · Lumexa
-   - LD-60W × 10,000: No quote → ₹462 each
-   - RFQs for new parts: None → 11 parts, 3 distributors

- Ask: "Prepare ITC-04 for this quarter, with Kalinga's coil winding."
- Reads: Job work challans, Receipts, Process loss norms, Copper wire issues
- Answer: ITC-04 is ready with 9 challans. Kalinga used 14 kg more copper than the norm, and I've drafted a debit note. Your accountant files the return.
- Plan: ITC-04 · Q3
-   - Challans in the return: 0 → 9
-   - Debit note to Kalinga: None → 14 kg copper · ₹13,860

## Your line's way of working, not ours.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

### Configure it

Your fields, forms, approvals and dashboards, set to the way you work, without code.

- Firmware version: 2.4.1
- Hi-pot voltage: 3 kV
- Line leader sign-off

### Set your rules

Business rules that run on every record: holds, checks, limits and who is told.

- Block packing if burn-in is under 8 hours
- Tell quality when a product's first-pass yield falls below 97%

### Your industry's extension

What every electronics assembler needs, built once and kept up for all of them.

- Component lots from the reels: R-88214, C-2241
- Alternate used, with its ECN, shown on the serial

### Yours alone

Where your process is yours alone, it runs as your own extension, on the same platform and upgraded with it.

- Print Lumexa's QR label with its SKU and date code
- Gridline boards: 100% burn-in at 55 °C

## Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your plant needs something outside the ERP, such as a link from your test stations or a portal for your brands, our team builds it and connects it to Emplotec, under the same support.

- A link from your test stations that writes each result to the serial
- A portal where your brands look up any serial's build and test record
- Your distributors' stock and price feeds, connected to MRP
- Your old BOM files and serial history, moved and kept searchable

## Built for the rules where you assemble.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

### India: India

- GST e-invoices and e-way bills raised at dispatch
- Imports with the bill of entry, duty, IGST credit and landed cost
- Job work and ITC-04, for coil winding and PCB assembly
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates tracked on every vendor bill
- BIS registrations per model in the compliance calendar, with renewal reminders
- Tally sync, if your accounts stay in Tally for now

### UAE: UAE

- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Serials traced from the component lot to the customer

### Saudi Arabia: Saudi Arabia

- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Serials traced from the component lot to the customer

### UK: United Kingdom

- VAT with Making Tax Digital
- PAYE payroll with RTI
- Serials traced from the component lot to the customer

### US: United States

- Sales tax, state by state
- Payroll
- 1099 forms
- Serials traced from the component lot to the customer

## Live in 30 days, without stopping a line.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, products and companies. The system is set up for electronics assembly, then fitted to your own workflow, so BOM revisions, serials and test records read the way your lines already work.

- We map your plant first: lines, BOMs and their revisions, approved alternates, and how serials and tests are recorded today.
- Your item master, BOMs from Excel or CAD exports, open orders, stock by lot and balances come across from Tally and Excel.
- We fit the work order, the serial record, test plans and your labels to the way your lines work.
- Your planners, stores, line leads and test engineers train on your own data, then go live line by line.

## Questions and answers

### What is the best ERP for electronics manufacturing?

One that keeps BOM revisions and ECNs under control, uses approved alternates before it reports a shortage, traces every serial to its component lots, holds test and burn-in records against the serial and costs imported parts at landed cost, on the same ledger as your accounts. Emplotec does all of that in one system, with an agent across it.

### Does Emplotec track serial numbers to the component lot?

Yes. Every serial carries its work order, BOM revision, the reels and lots used on it, and its test and burn-in record. You can trace forward from a lot to every serial and customer, or back from a serial to its vendors.

### How does it handle alternate components?

Approved alternates sit on the BOM line with the ECN that approved them. MRP uses an alternate in stock before it reports a shortage, and the serial records which part it carries.

### Does it work for an EMS company building on customers' parts?

Yes. Job work received covers customer job orders, customer-owned components kept apart from your stock, return challans and conversion charges, alongside your own products on the same lines.

### Can it handle warranty claims from our customers?

Yes. Each claim is matched to the serial's build date, test record and component lots, and to the customer's debit note. You accept or dispute each one with records, and the 8D and the vendor's corrective action are drafted from the same data.

### Does it track the floor life of moisture-sensitive parts?

Yes. Each reel carries its MSL. Exposure is counted from the moment the dry pack is opened, time in the dry cabinet is set aside, and a reel past its floor life can't be issued to the line until it is baked and logged.

### How are returns of our own products handled?

Each return gets a return authorisation and is received against the serial it was shipped as. On the returns bench, the build, BOM revision, component lots and test record come up with it; the decision to replace, repair, credit or return it as is goes to a person, and a component fault is recovered from the vendor.

### Can we keep Tally for our accounts?

Yes. Production, stores, serials and job work run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

### Can you customise it for our process?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for electronics assemblers; and extensions for your own workflow. The core is never forked, so your changes survive upgrades.

### Does it run on our own servers?

Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.

### Does it handle service calls for the panels and UPS we install?

Yes. Every installed unit carries its serial, warranty and AMC. A call is checked against the cover, an engineer is matched by skill and certification with the part in the van, the report is signed on the phone, and chargeable work is billed the same day (Field Service). The year's budget and the bank's CMA data come from the same records (Planning).

### What doesn't Emplotec cover for electronics manufacturers?

Live data from placement, AOI or test equipment, which stays on the machines: results are recorded against the test plan. PLM and ECAD integration, beyond BOM import from CAD exports. Field service at your customers' sites is covered by Field Service, and floor life of moisture-sensitive parts and returns of your own products are covered.

## Related industries

- [Manufacturing](https://www.emplotec.com/industries/manufacturing.md)
- [Automotive components](https://www.emplotec.com/industries/manufacturing/automotive-components.md)
- [Plastics and rubber moulding](https://www.emplotec.com/industries/manufacturing/plastics-and-rubber-moulding.md)
- [Distribution and trading](https://www.emplotec.com/industries/distribution-and-trading.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- Emplotec ERP: https://www.emplotec.com/erp.md
- All industries: https://www.emplotec.com/industries.md