# ERP for engineering and fabrication companies: Every job costed against its quote. Every revision on the shop floor.

> Fabrication ERP for make-to-order shops: drawings and ECNs, job cost against the quote, welders, QAP and TPI, milestone billing and retention, on one system.

Page: https://www.emplotec.com/industries/manufacturing/engineering-and-fabrication

For shops that build structures, process equipment, skids and sheet metal to the client's drawing: revisions and ECNs, quotes from the jobs you've already made, welders and the QAP, third-party inspection, and milestone or tonnage billing with retention, on one system with your stores and accounts.

Who it is for: engineering and fabrication companies

## Runs on

- Manufacturing
- Projects
- Billing
- Procurement
- Quality
- Inventory
- CRM & Sales
- Books
- Field Service
- Planning

## From the estimate to the job's real margin.

Emplotec follows Narmada's skid from the estimate through the drawing office, the bays and the hydrotest, and people approve every plan it drafts.

- Quoting: Narmada's SRS-2 is quoted from J-2541, last year's skid, with its real hours and plate.
- The drawing office: ECN-118 costs ₹12.1 L, so Emplotec plans the plate hold and drafts CO-07.
- The plate yard: Each plate is weighed in, and its MTC is checked by heat before release.
- The fabrication bays: Every weld is booked to a qualified welder, and every piece carries its plate's heat.
- The hydrotest bay: The TPI call letter and dossier index are drafted before Sentinel's inspector arrives.
- Dispatch: Dispatch after TPI is a milestone, so the bill is drafted as the skid leaves.
- Job cost: Every plate, hour and bill posts to the job, so margin is known as costs land.

## Does your job look like this?

These are the moments fabricators and engineering companies start looking for a new system. Every one is money a job made on paper and lost in the shop.

- Today: The client sends a new revision mid-job, and the shop has already cut plates on the old one. (AutoCAD folders and printouts) Fix: A drawing register with revisions, ECNs and approvals. Job cards and cut lists carry their revision, so the old one is recalled the moment the new one is approved.
- Today: The job is dispatched, and nobody knows if it made money until the CA closes the year. (Tally and Excel job sheets) Fix: Every plate, hour, consumable and job worker's bill posts to the job's cost codes as it happens, against the quote's budget, with a forecast to finish.
- Today: Every quote starts from a blank sheet because nobody can find what the last vessel really cost. (Excel and memory) Fix: Quotes from similar past jobs and their real costs, overruns included, so the next price carries what the last one taught you.
- Today: The TPI inspector is due on Thursday, and the dossier is built over three late nights. (Files and email) Fix: MTCs by heat, the weld map, NDT reports and the hydrotest live with the job. Emplotec assembles the dossier index and shows what is still open.
- Today: A milestone is reached or 18 t are dispatched, and the bill goes out two weeks after. Retention is never chased. (Tally and reminders) Fix: Billing plans by milestone or tonnage, with retention and advances. Dispatches and milestones become unbilled lines the day they happen, and retention release dates are tracked.
- Today: A welder's qualification has lapsed, and he has just welded a pressure joint. (A register in the QA office) Fix: Welder qualifications with continuity and expiry. The job card checks the welder before the weld starts.
- Today: Site calls for column C-12, and nobody can say whether it was painted, dispatched or is still in Bay 1. (A marking register) Fix: Every mark number carries its drawing revision, weight and stage, from cutting to paint. Packing lists and dispatches go by mark number, so the site knows which truck it is on.
- Today: The advance bank guarantee lapses mid-job, and a late delivery's LD is found only in the client's final payment. (Bank letters and the contract file) Fix: Bank guarantees given against each job sit on the job with their expiry and renewal reminders. LD is computed from the contract's terms against the promised dates, so the risk is seen while the job can still recover.

## Fabrication ERP, from the drawing to the retention.

Estimates, jobs, drawings, the shop, stores, quality, billing and accounts run on one system, set up for make-to-order work. Every product shares the same jobs, drawings and ledger.

### Start with: [Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

A drawing register with revisions and ECNs, BOMs from drawings, cut lists with nesting yield, progress by mark number, job cards by bay, job work and the job's cost against its quote.

- Revisions and ECNs on every job card
- Quotes from similar past jobs
- Job cost planned against actual

### Start with: [Inventory](https://www.emplotec.com/erp/inventory.md)

Plates, pipes and fittings by grade, thickness and heat, with remnants kept as stock, electrodes and wire issued by job, gate entry, weighbridge and dispatch by mark number. Included with Manufacturing.

- Every plate and remnant traced by heat
- Free-issue material from clients kept apart
- Weighbridge slips on every dispatch

### Add next: [Projects](https://www.emplotec.com/erp/projects.md)

Each order becomes a job with a work breakdown, budgets by cost code from the quote, change orders, milestones, erection progress at site and the job's P&L.

- Budget, committed, actual and forecast
- Change orders approved before they count
- Milestones that release billing

### Add next: [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md)

Enquiries with the client's drawings, a costing sheet per quote, follow-ups that don't go quiet and orders that become jobs.

- Costing sheet from material, process and overhead
- Quotes that go quiet are flagged
- Orders carry their terms into the job

### Add next: [Procurement](https://www.emplotec.com/erp/procurement.md)

Plate, pipe and bought-out items bought against each job, with comparative statements, rate contracts and MTCs required on the PO.

- Comparative statements with landed cost
- Orders tagged to the job and cost code
- MTC by heat required before payment

### Add next: [Billing](https://www.emplotec.com/erp/billing.md)

Billing plans by milestone, tonnage or measured quantity, with advances, retention, change orders and LD for late delivery computed from the terms, drafted from the signed contract.

- Milestones and tonnage billed when reached
- Retention and advance recovery on every bill
- Change orders billed, never forgotten

### Add-on: [Quality](https://www.emplotec.com/erp/quality.md)

QAPs as inspection plans, MTCs checked by heat, WPS and PQR records, weld maps, NDT, hydrotest, blasting and paint DFT records, welder qualifications and TPI hold points.

- MTCs checked by heat at the gate
- Welder qualifications checked on the job card
- TPI hold points before the next step

### Add next: [Books](https://www.emplotec.com/erp/books.md)

Your accounts on the same ledger: each job's costs and bills, GST and e-invoices on every dispatch, bank guarantees given against each job and the month-end close.

- Bank guarantees with expiry reminders
- Retention and advances in the job's ledger
- Keep Tally for accounts until you move

### Add-on: [Field Service](https://www.emplotec.com/erp/field-service.md)

Skids, vessels and process equipment after commissioning: warranty calls and AMC visits at the client's plant, the engineer with the right spares, and the report signed by the client's engineer before they leave.

- Every supplied unit by tag number
- Warranty and AMC cover on intake
- Signed report becomes the invoice

### Add-on: [Planning](https://www.emplotec.com/erp/planning.md)

The year's budget by plant and product line from your own orders, routings, people and ledger, with the CMA data your bank asks for at renewal, in that bank's own template.

- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario

## One job, from the client's drawing to the retention.

Narmada's SRS-2 skid, followed through every product it touches. The quote becomes the budget, the drawing becomes the cut list, and every milestone becomes a bill.

1. **CRM & Sales: Quoted from a job you've already made.** Narmada sends the GA drawing for SRS-2. Meera builds the costing sheet from J-2541, the SRS-1 skid made last year, with its real hours and plate. The quote goes out at ₹1.84 Cr.
2. **Projects: The order becomes a job.** Narmada's PO becomes J-2614. The quote's heads become the budget by cost code, and the payment terms become a billing plan with five milestones.
3. **Manufacturing: The drawing changes, and so does the job.** ECN-118 brings rev C. The BOM gains 1.1 t of plate, the cut list is reissued, and the 3 plates cut on rev B are held. The change is priced before it is built.
4. **Procurement: Plate bought with its certificate.** The extra plate goes to Sayaji Steel Traders on the comparative statement. The truck is weighed at the gate, and Divya checks the MTC against heat H-77412 before the plate is released.
5. **Quality: Welded, tested and witnessed.** Each weld is booked against a qualified welder and its WPS. RT and DPT results go on the weld map, and Sentinel's inspector witnesses the hydrotest at the TPI hold point.
6. **Billing: Dispatched and billed the same day.** Dispatch after TPI is a milestone, so the bill is drafted as the truck leaves, with CO-07 on it. Priya approves the billing run; the e-invoice and e-way bill go with the skid.
7. **Projects: The job closes with its real margin.** Every plate, hour and bill posted to J-2614 as it happened, so its margin is known the day the last cost lands, against the quote it started from.

## Ask your shop what each job is really making.

Emplotec reads across jobs, drawings, the bays, quality, stores and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

- Ask: "Can we take Sabarmati's 240 t pipe rack PR-4 for February without moving other jobs?"
- Reads: Shop schedule, Bay 1 capacity, J-2608 hours per tonne, Plate on order, Open jobs' promise dates
- Answer: Yes, for completion by early April rather than mid-March. Price it on PR-3's real hours, and allow 5% plate scrap, not 4%. I've drafted the schedule note for Meera's quote.
- Plan: PR-4 · capacity note
-   - Bay 1: Free from 2 Feb → PR-4, 9 weeks
-   - Blasting, March: 1 shift → 2 shifts
-   - Quote basis: 36 h a tonne → In RFQ-0388

- Ask: "Which welders' qualifications lapse before their jobs finish?"
- Reads: Welder qualifications, Continuity records, Job cards, Shop schedule
- Answer: Senthil must requalify before 18 November, and two contract welders need continuity proof before they weld again. I've drafted the booking with Sentinel for 17 November and drafted a note to the contractor.
- Plan: Welder qualifications
-   - Senthil, WQ-31: Lapses 18 Nov → Requalify 17 Nov
-   - 2 contract welders: No record → Blocked until proof

- Ask: "Which jobs made less than we quoted this year, and why?"
- Reads: Closed jobs, Quotes, Job costs by cost code, ECNs and change orders
- Answer: Plate scrap and unbilled client changes explain most of it. Every ECN from a client now opens a change order draft, and quotes can carry 5% scrap until nesting improves. I've drafted both for your review.
- Plan: Margin leaks · FY
-   - Rule: client ECN: No change order → Change order drafted
-   - Scrap allowance in quotes: 4% → 5%
-   - Unbilled changes: ₹3.4 L → 2 claims drafted

- Ask: "Which plates in stock can go into J-2620 instead of buying new?"
- Reads: Plate stock and remnants by heat, J-2620 BOM, MTCs, QAP requirements
- Answer: Remnants cover 3.4 t of J-2620's 5.2 t, worth ₹9.8 L. Only the 1.8 t of 12 mm shell plate needs buying. I've drafted the reservations and a smaller purchase request.
- Plan: J-2620 · plate
-   - SS316L 8 mm remnants: Free → Reserved, jacket and baffles
-   - E250 16 mm remnants: Free → Reserved, base frame
-   - Purchase request: 5.2 t → 1.8 t

## Your shop's way of building, not ours.

Emplotec fits your QAP, your clients' demands and your shop at four levels. The core is never forked, so every change carries through upgrades.

### Configure it

Your fields, forms, approvals and dashboards, set to the way you work, without code.

- Interpass temperature: 150 °C max
- Filler lot: ER316L, lot 2209
- Fit-up photos

### Set your rules

Business rules that run on every job card: holds, checks, limits and who is told.

- Block the job card if the welder isn't qualified for the process
- Tell Divya when a joint is repaired twice

### Your industry's extension

What every fabricator needs, built once and kept up for all of them.

- Plate heat number from the cut list: H-77412
- Raise the NDT request from the joint

### Yours alone

Where a client's demand is yours alone, it runs as your own extension, on the same platform and upgraded with it.

- Print Narmada's own weld map format into the dossier
- Narmada jobs: TPI hold point before any nozzle weld is closed

## Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your shop needs something outside the ERP, such as your nesting software's cut lists flowing in, a portal where clients approve drawings and see progress, or a link to your crane scales, our team builds it and connects it to Emplotec, under the same support.

- Cut lists and remnants from your nesting software
- A client portal for drawing approvals and progress photos
- A tablet app for the TPI inspector's sign-off in the bay
- Your old job files and dossiers moved and kept searchable

## Built for the rules where you build.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

### India: India

- GST e-invoices and e-way bills on every dispatch and milestone bill
- Job work and ITC-04 for galvanising, machining and blasting
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF for the shop and contract welders
- MSME payment dates tracked on every vendor bill
- Contract labour registers and returns under the OSH Code
- Tally sync, if your accounts stay in Tally for now

### UAE: UAE

- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Milestones, retention and change orders per contract

### Saudi Arabia: Saudi Arabia

- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Milestones, retention and change orders per contract

### UK: United Kingdom

- VAT with Making Tax Digital
- PAYE payroll with RTI
- Milestones, retention and change orders per contract

### US: United States

- Sales tax, state by state
- Payroll
- 1099 forms
- Milestones, retention and change orders per contract

## Live in 30 days, with every open job carried across.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which shops, products and companies. The system is set up for make-to-order fabrication, then fitted to your shop's own workflow, so estimates, jobs, drawings, QAPs and bills read the way your team already works.

- We map how a job runs in your shop first: enquiry, drawings, QAP, bays, TPI and billing terms.
- Open jobs come across with their budgets, cost to date, drawings and billing plans, from Tally and Excel.
- Plate stock and remnants are loaded by grade, thickness and heat, and welders with their qualifications.
- Estimators, planners, QA/QC and stores train on your own jobs, then go live job by job.

## Questions and answers

### What is the best ERP for a fabrication company?

One that costs every job against its quote, keeps drawing revisions and ECNs on the shop floor, traces plate by heat into the dossier, and bills milestones, tonnage and retention from the same job. Emplotec does all of that on one system with your stores and accounts, with an AI agent across it, fitted to your shop.

### Is Emplotec a metal fabrication ERP or an engineering ERP?

Both. Structural fabricators bill by tonnage and process equipment makers bill by milestone; both need revisions, job cost, welders, inspections and retention. Emplotec runs either way, and many shops do both.

### Can it cost each job against the quote?

Yes. The quote's heads become the job's budget by cost code. Plate, hours, consumables, job workers and bought-out items post as they happen, with a forecast to finish, so you see the margin while there's still time to act.

### Does it handle drawings, revisions and ECNs?

Yes. A drawing register with revision control and client approval status, ECNs with approvals, BOMs imported from CAD exports, and job cards and cut lists that carry their revision.

### Can it bill by milestones and keep retention?

Yes. Billing plans by milestone, tonnage or measured quantity, with advances, retention, change orders and RA bills, drafted from the signed contract and approved by a person before any invoice goes.

### Does it follow a job to erection at site?

Yes. Every mark number is dispatched with its packing list and weighbridge slip, and erection progress at site is booked on the daily progress report on mobile, by mark and by tonnage, so billing by erected tonnage and the job's cost follow the same records.

### Can it handle nesting yield, consumables and painting?

Yes. Cut lists from your nesting software carry their yield and remnants back to stock by heat. Electrodes and wire are issued by job and checked against the WPS, and blasting and paint DFT readings are recorded by mark number. The nesting itself stays in your nesting software.

### Can we keep Tally for our accounts?

Yes. Jobs, the shop, stores and quality run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

### Can you customise it for our QAP and our clients' formats?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; the fabrication extension; and extensions for your own workflow, such as one client's weld map or hold points. The core is never forked, so your changes survive upgrades.

### Does it run in the cloud or on our own servers?

Either. Emplotec runs in the cloud or on your own servers, the same build both ways, and each customer has its own database.

### Does it handle warranty and AMC service on the equipment we supply?

Yes. Every supplied unit is on record by tag number with its warranty and AMC. Calls are checked against cover and dispatched to an engineer with the spares, and the report is signed by the client's engineer on the phone (Field Service). The year's budget and the CMA data for your bank come from the order book, bids and ledger (Planning).

### What doesn't Emplotec cover for fabricators?

Design software stays as it is: CAD and PLM integration, nesting, design calculations to pressure vessel codes, and BIM. BOMs come in from CAD exports. Estimation is covered: each enquiry is estimated from similar past jobs' actual costs, and the estimate becomes the job's budget when the order is won.

## Related industries

- [Manufacturing](https://www.emplotec.com/industries/manufacturing.md)
- [Construction and EPC](https://www.emplotec.com/industries/construction-and-epc.md)
- [Metal casting, forging and steel](https://www.emplotec.com/industries/manufacturing/metal-casting-and-forging.md)
- [Automotive components](https://www.emplotec.com/industries/manufacturing/automotive-components.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- Emplotec ERP: https://www.emplotec.com/erp.md
- All industries: https://www.emplotec.com/industries.md