# ERP for furniture manufacturing: Cut to order, installed on time. And every sheet of board accounted for.

> ERP for furniture manufacturing: variants by size and finish, cut lists, board yield, site installation projects and dealer orders on one AI-native system.

Page: https://www.emplotec.com/industries/manufacturing/furniture-and-woodwork

Office fit-outs installed floor by floor, dealer orders for the standard range and stock built ahead, all in one factory: variants, cut lists, board yield, the panel saw's plan, site installation and each order's real margin, with an agent that works across all of it.

Who it is for: furniture makers

## Runs on

- Manufacturing
- Inventory
- Projects
- CRM & Sales
- Books
- Planning

## From the floor plan to the handover bill.

Emplotec follows Veltrix's Floor 3 from the board store through the saw, the bander and the site, and people approve every plan it drafts.

- The showroom: Meera quotes Veltrix's 420 workstations from the layout, costed from past jobs.
- The board store: Floor 3 is 72 sheets short, so Emplotec plans the Aster move and an order.
- Panel saw and edge banders: Each variant explodes into a cut list, so the panel saw never waits for Excel.
- The powder coater: Steel frames go out on a job work challan and come back counted.
- Packing and dispatch: Floor 3 is packed by bay, so every carton carries its floor and bay.
- The site: Karthik's crew files progress each evening, offline when the network drops.
- Billing and margin: Rahul Bose signs off the floor, and its milestone bill is drafted for Priya.

## Does your week look like this?

These are the moments that send furniture makers looking for a new system. Each one is a drawing, a sheet of board or a site that lives in a different place.

- Today: Every desk comes in three sizes and three finishes, and the item list in Tally has a thousand codes nobody trusts. (Tally) Fix: One product with its variants by size and finish, each with its BOM, stock and price. Stock batches are planned from reorder levels, contract jobs from orders.
- Today: Cut lists are typed into Excel from the drawing by one person, and the panel saw waits for them. (Excel) Fix: Cut lists come from the variant's BOM: every panel with its size, board, edging and grain, grouped by board and finish for the saw.
- Today: Board is cut, offcuts pile up, and nobody knows the yield or what it cost on the job. (Guesswork) Fix: Sheets issued against each cut list, so yield shows by finish, job and week, and board cost lands on the job's real cost.
- Today: A fit-out slips on site because one floor's material was short, and the client holds the payment. (Excel and WhatsApp) Fix: Each fit-out is a project with floors, a budget, a site diary on mobile and milestones that release the invoice when the floor is handed over.
- Today: Stock batches and contract jobs fight over the same board and the same edge bander. (Whiteboard) Fix: A finite-capacity plan for the panel saw, edge banders, boring and assembly, with stock cover shown, so a stock batch can wait when a site can't.
- Today: Dealers order on WhatsApp, some past their credit, and dispatch doesn't know whom to hold. (WhatsApp) Fix: A dealer's order is an ordinary sales order, at your price list and within the customer's credit limit. An order over the limit holds, and accounts releases it.
- Today: The client approved rev C of the drawing on WhatsApp, and the factory cut rev B. (WhatsApp and a drawings folder) Fix: Every shop drawing is on the register with its revisions and who approved each. A cut list is made only from the approved revision, and a new revision holds the old one.
- Today: A customer calls about a stuck drawer, and nobody can find the order, the warranty or who installed it. (A complaints register) Fix: Each service request opens against the order, with its warranty, the parts needed and the crew's visit, and is closed only when the customer signs off.

## Furniture manufacturing software, from the layout to the last floor handed over.

The factory, stores, dealer and showroom orders, site installation and accounts run on one system, set up for furniture makers. Every product shares the same variants, cut lists and projects from its first day.

### Start with: [Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

Variants' BOMs, shop drawings by approved revision, cut lists, routings for cutting, banding, boring, finishing and assembly, a finite-capacity plan and each order's real cost.

- Cut lists from the BOM, grouped by board
- Powder coating and polishing as job work, with ITC-04
- Board yield and job cost per order

### Start with: [Inventory](https://www.emplotec.com/erp/inventory.md)

Board by thickness and finish in sheets, timber by the cubic foot, hardware in pieces, edge band and fabric in metres, in every godown and site store. Included with Manufacturing.

- Variants by size and finish
- Reservations for projects and orders
- Slow and non-moving variants flagged

### Add next: [Projects](https://www.emplotec.com/erp/projects.md)

Every fit-out as a project: floors as the work breakdown, a budget, the installation crew's site diary and milestones that release billing.

- Daily progress report on mobile, offline
- Site store and material against the plan
- Installation subcontractors and their bills

### Add next: [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md)

Fit-out enquiries to costed quotes with advances, showroom and dealer orders as ordinary sales orders, with price lists and credit limits, and service requests against each order's warranty.

- Quotes from what past jobs really cost
- Proformas with the advance received
- Credit holds before dispatch

### Add next: [Procurement](https://www.emplotec.com/erp/procurement.md)

Board and hardware shortages become POs at rate contracts, received at the gate and matched before the vendor is paid.

- Rate contracts per board and finish
- Three-way match before payment
- MSME payment dates on every bill

### Add next: [Books](https://www.emplotec.com/erp/books.md)

Your accounts on the same ledger: milestone invoices, customer receivables, e-way bills to sites and the month-end close.

- E-invoice and e-way bill with each dispatch
- Project and customer receivables in one place
- Keep Tally for accounts until you move

### Add-on: [Planning](https://www.emplotec.com/erp/planning.md)

The year's budget by plant and product line from your own orders, routings, people and ledger, with the CMA data your bank asks for at renewal, in that bank's own template.

- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario

## One fit-out, from the layout to the last floor handed over.

Veltrix Software's office at Whitefield, followed through every product it touches. Nobody re-enters anything, and every step is a record you can open.

1. **CRM & Sales: Quoted, won, advance in.** Meera quotes 420 workstations, 60 storage units and 12 meeting tables from the layout, costed from past jobs. Veltrix accepts and pays the 20% advance against the proforma.
2. **Projects: Set up as a project.** Deepa opens PRJ-0217 from the order: four floors as the work breakdown, a ₹2.31 Cr budget by cost type, and a billing milestone for each floor's handover.
3. **Manufacturing: Variants become cut lists.** Floor 3's variants explode into work orders and a cut list of 1,452 panels. The plan finds panel saw, banding, boring and assembly time, and flags the Grey Oak board short.
4. **Procurement: Board ordered, frames coated.** Anand approves PO-4120 at the contract rate. The steel frames go to Peenya Powder Coaters on a job work challan and come back counted.
5. **Inventory: Packed by bay, sent to site.** Arun packs Floor 3 by bay, so each carton carries its floor and bay number. The trucks leave with the delivery note and e-way bill, and the site store receives them.
6. **Projects: Installed and handed over.** Karthik's crew files a progress report each evening from the site, offline when the network drops. On the fifth day Rahul Bose signs off Floor 3 on the app.
7. **Books: The milestone bills itself, for approval.** The handover releases Floor 3's milestone. Priya approves the invoice, it posts to the ledger, and the project's margin updates with the cost of every sheet and hour.

## Ask your factory anything.

Emplotec reads across variants, cut lists, the plan, sites and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

- Ask: "Can we take Orbis Analytics' 180 workstations for 10 December?"
- Reads: Production plan, Linea BOM, Board stock, Install dates, Crew bookings
- Answer: Yes, if the install starts 2 December with Sri Ganesh Interiors' crew, finishing 9 December. Veltrix Floor 4 doesn't move. I've drafted the quote reply and a crew booking for Deepa.
- Plan: Orbis Analytics · 180 workstations
-   - Make: None → Weeks 48 and 49
-   - Install crew: None → Sri Ganesh Interiors, from 2 Dec
-   - Handover: Asked 10 Dec → 9 Dec

- Ask: "Quote 60 Linea desks in Classic Walnut for Comfort Office."
- Reads: Linea desk BOM, Past job costs, Comfort Office's price list, Board rates
- Answer: A draft at ₹11,600 a desk, the dealer price less 4% for 60, which keeps 20% margin at October's board rate. Delivery 12 days from the order.
- Plan: Quote QT-0688 · Comfort Office Systems
-   - LD-1407-CW × 60: No quote → ₹11,600 each
-   - Delivery: None → 12 days from PO

- Ask: "What was our board yield by finish last month, and what did the waste cost?"
- Reads: Cut lists, Board issues, Board rates, Work orders
- Answer: October's board waste cost ₹3.8 L beyond plan, most of it Walnut cut job by job. Cutting project jobs together by finish, as for dealer batches, would recover about two thirds of it.
- Plan: Yield follow-up
-   - Cut lists for project jobs: Per job → Grouped by finish, daily
-   - Rule: yield below 82%: None → Tell Ravi

- Ask: "Which installs next week are short of material or crew?"
- Reads: Install dates, Work orders, Dispatches, Crew bookings, Site stores
- Answer: One gap next week: the glass shelves for Coastal Interiors' showroom haven't arrived from the vendor. I've drafted a chase to the vendor and moved that install by a day for Deepa to approve.
- Plan: Installs · week 47
-   - Chase · glass shelves: None → Draft to vendor
-   - Coastal Interiors showroom: Tue 17 Nov → Wed 18 Nov

## Your factory's way of working, not ours.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

### Configure it

Your fields, forms, approvals and dashboards, set to the way you work, without code.

- Grain direction: Along length
- Hardware kit: KIT-LW-15
- Supervisor sign-off

### Set your rules

Business rules that run on every record: holds, checks, limits and who is told.

- Block the board issue if the cut list is from an old BOM revision
- Tell the planner when yield falls below 82%

### Your industry's extension

What every furniture maker needs, built once and kept up for all of them.

- Cut list from the variant's BOM, with sizes and edging per panel
- Offcuts above 300 mm returned to stock

### Yours alone

Where your process is yours alone, it runs as your own extension, on the same platform and upgraded with it.

- Print Veltrix's own floor-and-bay label on every carton
- Installation sign-off by the client's facility manager on the app

## Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your factory needs something outside the ERP, such as a link to your panel optimiser or a showroom catalogue, our team builds it and connects it to Emplotec, under the same support.

- Panel sizes from your design drawings read into each variant's BOM
- Cut lists sent to your panel optimiser and its yield read back
- A showroom catalogue of variants, sizes and finishes
- Your old system's items and history, moved and kept searchable

## Built for the rules where you make.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

### India: India

- GST e-invoices and e-way bills for every dispatch to site or dealer
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- Job work and ITC-04, for powder coating and polishing sent out
- TDS and TCS under the Income-tax Act 2025, including installation subcontractors
- PF, ESI, Professional Tax and LWF on the Labour Codes, and contract labour
- MSME payment dates tracked on every vendor bill
- Tally sync, if your accounts stay in Tally for now

### UAE: UAE

- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Installation milestones billed per contract

### Saudi Arabia: Saudi Arabia

- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Installation milestones billed per contract

### UK: United Kingdom

- VAT with Making Tax Digital
- PAYE payroll with RTI
- Installation milestones billed per contract

### US: United States

- Sales tax, state by state
- Payroll
- 1099 forms, for installation subcontractors
- Installation milestones billed per contract

## Live in 30 days, without stopping the factory.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which factories, showrooms and companies. The system is set up for furniture making, then fitted to your factory's own workflow, so variants, cut lists and site installations read the way your team already works.

- We map your factory first: products and variants, how cut lists are made, and how sites are run today.
- Your items, variants, BOMs, open orders, projects, stock and balances come across from Tally and Excel.
- We fit the work orders, cut lists, site reports and documents to the way you work.
- Your planner, stores, installation leads and accounts train on your own orders, then go live.

## Questions and answers

### What is the best ERP for furniture manufacturing?

One that holds every product's variants by size and finish, makes cut lists from the BOM, shows board yield, plans the panel saw and edge banders, runs fit-outs as projects with site installation, and handles every sales order and its credit, on the same ledger as your accounts. Emplotec does all of that in one system, with an AI agent across it.

### Does it handle made-to-order and made-to-stock together?

Yes. Stock batches are planned from reorder levels and contract jobs from orders, on the same finite-capacity plan, with stock cover shown so a batch can wait when a site can't.

### Can it manage installation at the client's site?

Yes, with Projects. Each fit-out has floors or rooms as the work breakdown, a budget, a site store, the crew's daily progress report on mobile, installation subcontractors and milestones that release the invoice when the client signs off.

### Does it optimise how panels are cut from a sheet?

Emplotec makes the cut list from the BOM and tracks the sheets issued against it, so you see yield by job and finish. It isn't a nesting optimiser; if you use one beside the panel saw, it keeps doing that job and Emplotec still tracks every sheet issued.

### Does it handle shop drawings and client approvals?

Yes. Every drawing is on the register with its revisions, the comments on each and who approved it. Cut lists are made only from the approved revision, and a new revision holds work on the old one. The drawings themselves are drawn in your design software.

### Does it cover showroom orders and after-sales service?

Yes. A showroom order carries its variant, finish, advance and delivery or installation date into the plan, and made-to-order pieces go through their drawing first. After the handover, each service request opens against the order and its warranty, with the parts, the crew's visit and the customer's sign-off. Requests out of warranty are quoted before the visit.

### Does it handle solid wood, veneer and upholstery?

Yes. Timber is bought by the cubic foot and cut to sizes with its recovery recorded, and kiln batches carry their moisture readings. Veneer, lacquer and polish run as finishing steps with coats and curing time, or as job work. Upholstery fabric is stocked in metres and foam by density, cut and stitched against each order.

### Does it run payroll for our factory and installation crews?

Yes, with Emplotec HRMS. Biometric attendance, shifts, overtime and contract labour flow into payroll with PF, ESI, Professional Tax and LWF, and installation subcontractors are paid against the work they did on each project.

### Can we keep Tally for our accounts?

Yes. Variants, cut lists, production, projects and dealer orders run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

### Can you customise it for the way our factory works?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for furniture makers; and extensions for your own workflow, such as one client's carton labels. The core is never forked, so your changes survive upgrades.

### Does it work on our own servers?

Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database. The mobile app works offline on site.

### What doesn't Emplotec cover for furniture makers?

A product configurator, 3D design and rendering, CNC program generation, nesting optimisation, e-commerce, and secondary sales through your dealers' shops. Showroom sales are covered: each order taken in the showroom carries its variant, finish and delivery or installation date into the plan.

## Related industries

- [Manufacturing](https://www.emplotec.com/industries/manufacturing.md)
- [Interiors and fit-out](https://www.emplotec.com/industries/interiors-and-fit-out.md)
- [Engineering and fabrication](https://www.emplotec.com/industries/manufacturing/engineering-and-fabrication.md)
- [Packaging](https://www.emplotec.com/industries/manufacturing/packaging.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- Emplotec ERP: https://www.emplotec.com/erp.md
- All industries: https://www.emplotec.com/industries.md