# ERP for the packaging industry: Short runs on time, reels by the kilo. The real cost of every box.

> Packaging ERP for corrugated box, flexible packaging and label converters: customer specs, reels by weight, short-run plans, trim and the real cost of each job.

Page: https://www.emplotec.com/industries/manufacturing/packaging

Every customer's spec, every reel by grade, deckle and weight, forty short runs a week on one corrugator, and the trim and margin of each job: one system for box makers, flexible packaging and label converters, with an agent that works across all of it.

Who it is for: packaging converters

## Runs on

- Manufacturing
- Inventory
- Quality
- CRM & Sales
- Procurement
- Books
- Planning

## From the spec to the cost per box.

Emplotec follows Navrang's tile boxes from the spec through the reel godowns and the corrugator, and people approve every plan it drafts.

- Specs and orders: Navrang's PO is read against SPC-NAV-0602 rev 3, so no box ships on an old spec.
- The reel godowns: Changodar's liner covers 16,200 boxes. Sanand has 4 reels, so Emplotec plans the transfer.
- The corrugator: Reels are issued to the job by number and weight, and trim is booked per run.
- The board lab: Bursting strength, GSM and moisture are tested before the board goes to print.
- Print and stitch: Sheets, make-ready and rejects are booked at the kiosk on each machine.
- Dispatch: The e-invoice and e-way bill are raised together as the bundles are loaded.
- Job cost: Kraft is up ₹3 a kg, so revised price lists are drafted for Meera.

## Does your week look like this?

These are the moments that send box makers and converters looking for a new system. Each one is a spec, a reel or a job that lives in a different place.

- Today: A repeat order goes out to last year's spec, with the old print, because the new revision was in someone's email. (Excel and WhatsApp) Fix: Every customer's spec is one record with its revisions: board on each layer, ply, flute, size, print, bundle and pallet. Orders and jobs always pick the current revision.
- Today: A job is on the plan for Monday, but the customer hasn't approved the new artwork, and the plates are still at the plate maker. (Email threads) Fix: Each artwork revision goes to the customer as a proof and comes back approved on the portal or by signed proof. A job can't start on unapproved artwork, and every plate and die carries its impressions against its life.
- Today: The corrugator stops because the liner you thought you had is in the other godown, or in the wrong deckle. (Tally and a stock register) Fix: Reels by number, grade, deckle and weight in every godown. Each job's paper is checked against them before it's planned.
- Today: Forty short runs a week, planned on a whiteboard, and a big customer's rush order breaks it every Thursday. (Whiteboard) Fix: A finite-capacity plan for the corrugator, printers, die-cutter and stitching. A rush order is tried as a what-if first, so you see what moves before you say yes.
- Today: Nobody knows what trim and make-ready waste cost this month, or on which job. (Guesswork) Fix: Trim, make-ready and rejections are booked on job cards, so waste shows by job, machine and customer, in tonnes and rupees.
- Today: Kraft prices move every month and the quotes don't, so some customers are below cost and nobody knows which. (Box-costing sheet) Fix: Every job's actual cost against its price, and the customers who fall below cost when paper rates change.
- Today: A pharma buyer's auditor asks for bursting strength results by lot, and someone spends a day in files. (Paper test reports) Fix: Board and box tests are recorded on mobile against the job and the reels it used, ready to send by lot.

## Packaging ERP: one system from the spec to the box's real cost.

Specs, planning, reels, the corrugator and printers, quality, dispatch and accounts run on one system, set up for converters. Every product shares the same specs, reels and jobs from its first day.

### Start with: [Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

Specs as BOMs, a finite-capacity plan for every machine, job cards with trim and waste, and each job's real cost.

- Short runs planned against corrugator and printer time
- Artwork approvals, plates and dies tracked for life
- Job cost against the price, per box

### Start with: [Inventory](https://www.emplotec.com/erp/inventory.md)

Every reel by number, grade, deckle and weight in every godown, weighed in at the gate and issued to the job. Included with Manufacturing.

- Reels in kilos, boxes in pieces, with conversions
- Weighbridge tickets linked to the GRN
- Reels older than 90 days flagged

### Add next: [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md)

Enquiries to costed quotes, POs read from PDF into orders against the customer's spec, blanket orders with call-offs from FMCG buyers, price lists and credit limits.

- Quotes from a spec's real job costs
- Price lists per customer, revised in one go
- Credit holds before dispatch

### Add next: [Procurement](https://www.emplotec.com/erp/procurement.md)

Paper shortages become POs to the mill at the rate contract, with quotes compared on landed cost and every mill paid on time.

- Rate contracts per grade and mill
- MSME payment dates on every bill
- Rejected reels debited to the mill

### Add next: [Books](https://www.emplotec.com/erp/books.md)

Your accounts on the same ledger: GST invoices and e-way bills at dispatch, receivables by customer and the month-end close.

- E-invoice and e-way bill with the dispatch
- Reel stock valued in the books
- Keep Tally for accounts until you move

### Add-on: [Quality](https://www.emplotec.com/erp/quality.md)

Incoming reel tests, board and box tests on mobile, lots held until they pass, traced to the reels they used, and a certificate of analysis with each dispatch for food and pharma buyers.

- GSM, BF and moisture on every reel lot
- Bursting strength by job and lot
- Rejected reels into returns and the mill's rating

### Add-on: [Planning](https://www.emplotec.com/erp/planning.md)

The year's budget by plant and product line from your own orders, routings, people and ledger, with the CMA data your bank asks for at renewal, in that bank's own template.

- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario

## One repeat order, from the customer's PO to cash.

Navrang Ceramics' order for 24,000 tile boxes, followed through every product it touches. Nobody re-enters anything, and every step is a record you can open.

1. **CRM & Sales: The PO comes in.** Rahul Bose emails PO NC/PO/7731. Emplotec reads it into a sales order against spec SPC-NAV-0602 rev 3 at Navrang's price, and Meera confirms it.
2. **Manufacturing: Planned on the corrugator.** The spec explodes into paper by grade and deckle. The plan finds corrugator, printer and stitching time, and flags that the liner at Changodar covers only 16,200 boxes.
3. **Inventory: Reels moved and issued.** Anand approves the transfer. The truck is weighed out at Sanand and in at Changodar, and the 4 reels are issued to JOB-2431 by reel number and weight.
4. **Quality: Board tested before print.** Divya tests the corrugated board on her tablet: bursting strength, GSM and moisture. Every result is in limit, so the board is released to the printer-slotter.
5. **Manufacturing: Printed, stitched and costed.** Senthil and Murugan book sheets, trim and rejections at the kiosk on each machine. The job's actual cost is known the moment the last bundle is counted.
6. **Books: Dispatched, invoiced and paid.** Arun raises the e-invoice and the e-way bill together at dispatch. The invoice posts to the ledger, and when Navrang pays, the receipt matches by itself.

## Ask your plant anything.

Emplotec reads across specs, reels, the plan, quality and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

- Ask: "Can we take 40,000 shippers for Zenlife by 20 November?"
- Reads: Corrugator and print plan, SPC-ZEN-0031 rev 2, Reel stock, Open POs
- Answer: Yes for 28,000 by 18 November and the other 12,000 by 20 November, once Monday's reels arrive. Nothing else moves. I've drafted the reply for Meera with the split.
- Plan: Reply to Zenlife Pharma
-   - 40,000 shippers: Asked by 20 Nov → 28,000 by 18 Nov, 12,000 by 20 Nov
-   - Sunday shift, CORR-1: Off → On, 15 Nov

- Ask: "Quote Shree Hari's new 7-ply box from this drawing."
- Reads: Drawing SHP-PB-12 (PDF), Similar specs, Job costs, Kraft rates
- Answer: A draft at ₹191.50 a box for 800, costed from what SPC-SHP-0208 really took, with the stitching time raised and today's kraft rates.
- Plan: Quote QT-0745 · Shree Hari Pumps
-   - 7-ply box, 1,140 × 520 × 480: No quote → ₹191.50 each
-   - Lead time: None → 6 days from artwork

- Ask: "What did waste cost us in October, by machine and by customer?"
- Reads: Job cards, Reel issues, Kraft rates, Sales orders
- Answer: October's waste cost ₹6.1 L net of the scrap sold. Half is trim from wrong deckles, and Gokul's short 4-colour runs carry the most make-ready. Batching Gokul's runs weekly would save about a third of it.
- Plan: Waste follow-up
-   - Gokul's 4-colour runs: As ordered → Batched weekly on FPS-2
-   - Deckle check on planning: None → Warn above 4%

- Ask: "Zenlife's auditor wants bursting strength results for every lot we shipped since August."
- Reads: Board and box tests, Dispatches, Reel lots, Incoming tests
- Answer: The pack is ready: 14 lots with bursting strength, GSM and moisture, traced to their reels. One incoming test is missing a moisture reading; Divya can add the lab note before it goes.
- Plan: Audit pack · Zenlife Pharma
-   - Lots in the pack: None → 14, August to November
-   - Send to Zenlife: None → After Divya's check

## Your plant's way of working, not ours.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

### Configure it

Your fields, forms, approvals and dashboards, set to the way you work, without code.

- Pallet pattern: 600 a pallet, 5 × 6
- Strapping: 2 straps, PP
- Artwork approval

### Set your rules

Business rules that run on every record: holds, checks, limits and who is told.

- Block the job if this revision's artwork isn't approved
- Tell the planner when a job's trim passes 4%

### Your industry's extension

What every converter needs, built once and kept up for all of them.

- Board weight per box from the paper on each layer: 0.64 kg
- Reel numbers carried from the GRN to the job card

### Yours alone

Where your process is yours alone, it runs as your own extension, on the same platform and upgraded with it.

- Print Navrang's own pallet label with the tile batch
- Navrang boxes: compression test on every lot, not sampled

## Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your plant needs something outside the ERP, such as a link to your corrugator's controller, an app for customers to reorder by spec or a connection to a big buyer's supplier portal, our team builds it and connects it to Emplotec, under the same support.

- A reorder app for your customers, by spec and revision
- Metres and breaks read from your corrugator's controller
- Your FMCG buyers' supplier portals, connected to your orders
- Specs and history moved from your old packaging software

## Built for the rules where you make.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

### India: India

- GST e-invoices and e-way bills raised at dispatch
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- Job work and ITC-04, for printing, lamination or dies sent out
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates tracked on every mill's bill
- Tally sync, if your accounts stay in Tally for now

### UAE: UAE

- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Reels tracked by number and weight

### Saudi Arabia: Saudi Arabia

- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Reels tracked by number and weight

### UK: United Kingdom

- VAT with Making Tax Digital
- PAYE payroll with RTI
- Reels tracked by number and weight

### US: United States

- Sales tax, state by state
- Payroll
- 1099 forms
- Reels tracked by number and weight

## Live in 30 days, without stopping the corrugator.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, godowns and companies. The system is set up for packaging conversion, then fitted to your plant's own workflow, so specs, reels, deckles and job cards read the way your team already works.

- We map your plant first: machines, deckles, how jobs are planned and how waste is counted today.
- Your customers' specs, price lists, open orders, reel stock and balances come across from Tally and Excel.
- We fit the specs, job cards, test sheets and documents to the way your plant works.
- Your planner, stores, shift heads and quality team train on your own jobs, then go live.

## Questions and answers

### What is the best ERP for the packaging industry?

One that holds every customer's spec with its revisions, tracks reels by grade, deckle and weight, plans short runs against your corrugator and printers, and gives you each job's trim and real cost, on the same ledger as your accounts. Emplotec does all of that in one system, with an AI agent across it, fitted to your plant.

### Is Emplotec suitable for a corrugated box maker?

Yes. Specs carry board grade on each layer, ply, flute, size, print, bundle and pallet. Reels are stocked by number and weight, the corrugator, printer-slotters, die-cutter and stitching are planned on finite capacity, and trim and rejections are booked on job cards.

### Does it work for flexible packaging and label converters?

Yes. Film, foil and label stock are rolls by weight and metres, with units converted. Extrusion, printing, lamination, slitting and pouching are routings, with ink, solvent and adhesive issued to each job by weight. Gravure cylinders, plates and dies are tracked for life, and their charges are billed to the customer as agreed. Lamination or printing sent out is job work, with ITC-04.

### Does it plan deckle and trim for us?

It checks each job's paper against reels by grade and deckle, books trim from job cards and tells the planner when a job is on the wrong deckle. It isn't a cutting or combination optimiser; if you use one, it keeps doing that job beside Emplotec.

### Does it handle customer artwork approvals?

Yes. Each artwork revision is tied to the spec revision, sent to the customer as a proof and approved on the customer portal or by a signed proof. Jobs pick only approved artwork, and the plates and dies for it are tracked from order to retirement. The artwork itself is drawn in your prepress software.

### Does it run payroll for our shifts and contract workers?

Yes, with Emplotec HRMS. Biometric attendance, shifts, overtime and contract labour flow into payroll with PF, ESI, Professional Tax and LWF, and post to your accounts on the same ledger.

### Can we keep Tally for our accounts?

Yes. Specs, reels, planning and job cost run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

### Can you customise it for the way our plant works?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for converters; and extensions for your own workflow, such as one customer's pallet label. The core is never forked, so your changes survive upgrades.

### Does it work on our own servers?

Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database. The mobile app works offline for the floor and the godown.

### What doesn't Emplotec cover for packaging converters?

Prepress, artwork and structural design software, deckle and cutting optimisation, ink and adhesive formulas, and live machine monitoring from sensors. Waste and OEE come from job cards and downtime logs. Those stay in their own tools and machines.

## Related industries

- [Manufacturing](https://www.emplotec.com/industries/manufacturing.md)
- [Plastics and rubber moulding](https://www.emplotec.com/industries/manufacturing/plastics-and-rubber-moulding.md)
- [Furniture and woodwork](https://www.emplotec.com/industries/manufacturing/furniture-and-woodwork.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- Emplotec ERP: https://www.emplotec.com/erp.md
- All industries: https://www.emplotec.com/industries.md
