# Real estate ERP software for developers: Know your cost per square foot, tower by tower. Pay contractors only for what's built.

> Real estate ERP software for developers: cost per square foot by tower, contractor bills checked against the site, site stores and SPV books on one system.

Page: https://www.emplotec.com/industries/real-estate

Every tower's budget, purchases, site store, contractor bills and the project company's books on one record, with an agent that checks each bill against the site diary. Unit inventory, bookings, payment schedules, demand letters and customer receipts run on the same record, so a slab cast on site raises its demands the same day.

Who it is for: developers

## Runs on

- Projects
- Procurement
- Inventory
- Books
- CRM & Sales
- Field Service
- Expense
- Planning

## From the budget to cost per square foot.

Tower C at Kayal Riverside, followed from its budget to the payment that updates its cost.

- The project office: Tower C is budgeted by cost code against its built-up area, and Ravi approves it.
- The site store: Steel bought at the rate contract is weighed in and issued free to Vypin.
- Tower C: Karthik's site diary records slab 6 cast, with concrete, workers, pump hours and photos.
- The contractor's bill: Vypin's RA-09 claims slab 7, which isn't cast, so Emplotec plans paying slab 6 only.
- The sales gallery: Saturday's visitors get follow-ups drafted with the unit each one asked about.
- The accounts: Priya releases the SPV's payment, and Tower C's cost per square foot updates.

## Does your month on the project look like this?

These are the moments developers start looking for a real estate ERP. Each one is a gap between the site, the contractors and the books of each project company.

- Today: Cost per square foot is known only when the tower is finished and the last bill is paid. (Excel and Tally) Fix: Every tower is a project with its budget by cost code and its built-up area, so the forecast cost per square foot moves with every PO, issue and contractor bill.
- Today: A contractor's RA bill claims a slab the site hasn't cast, and it gets paid. (Measurement books) Fix: Our engineer measures every contractor bill against the DPR. A slab that isn't recorded as cast isn't paid, and the bill shows retention, TDS and labour cess already applied.
- Today: Cement and steel issued free to contractors are never reconciled, so nothing is recovered. (Store registers) Fix: Free issues are reconciled against the consumption coefficients for the work done. Anything past the wastage limit is recovered on the contractor's next bill.
- Today: Each project company keeps its own Tally, and the group view is an Excel built every month. (One Tally per company) Fix: Every company and SPV keeps its own books on one ledger, with inter-company entries mirrored and a consolidated view of the group.
- Today: Bookings and demand letters sit in a sales tool, cost sits in Tally, and nobody sees margin by tower. (A separate sales CRM) Fix: Unit inventory, bookings, payment schedules, demand letters and receipts sit on the same ledger as the build, so collections and cost meet tower by tower, and margin by tower is a report, not a project.
- Today: Site visits come in from the website and WhatsApp, and half are never followed up. (WhatsApp) Fix: Enquiries from your website, email and WhatsApp land in one pipeline, visits are checked in on mobile, and the agent drafts the follow-ups for your team to send.
- Today: Cancellations, transfers and broker commissions are worked out in Excel, and the refund is late. (Excel and email) Fix: A cancellation forfeits what the agreement allows and schedules the refund, a transfer moves the booking with its receipts, and each channel partner's commission falls due on the stage you agreed.
- Today: An approval lapses or the land papers can't be found when the lender asks for them. (Files in the liaison office) Fix: Every parcel keeps its title documents and encumbrance search, and every approval its validity and conditions, with reminders well before each one expires.
- Today: After possession, maintenance charges, the corpus and the shops you kept are billed from a separate tool. (A billing spreadsheet) Fix: Maintenance charges, the corpus fund and rent on retained shops and offices are billed from the same system, until the owners' association takes over with its asset register.

## One real estate ERP for building and selling.

Start with Projects and add the rest as you need it. Every product shares the same record, so the site diary, the store, the contractor's bill, the buyer's demand letter and the SPV's books always agree.

### Start with: [Projects](https://www.emplotec.com/erp/projects.md)

Each tower or phase as a project, with its budget by cost code and built-up area, so cost per square foot is live.

- Cost per square foot by tower, budget against forecast
- Contractor RA bills measured against the DPR
- Primavera P6 and Microsoft Project files in and out

### Add next: [Procurement](https://www.emplotec.com/erp/procurement.md)

Indents from site become POs at rate contracts, compared on landed cost, with contractor work orders as service orders.

- Comparative statement with landed cost
- Rate contracts with alerts before they run out
- MSME suppliers paid on time

### Add next: [Inventory](https://www.emplotec.com/erp/inventory.md)

A site store on the same stock ledger as the accounts, with free issues to contractors and returns tracked by slab.

- Issues to contractors against the work done
- Gate entry and weighbridge for steel and cement
- Transfers between project sites

### Add next: [Books](https://www.emplotec.com/erp/books.md)

Every project company or SPV on its own books in one ledger, with GST, TDS on contractors, inter-company entries, consolidation, revenue under Ind AS 115, and the RERA account's withdrawals matched to the engineer's, architect's and CA's certificates.

- Separate books for each project company
- Inter-company entries mirrored, eliminated on consolidation
- Keep Tally for accounts until you move

### Add next: [CRM & Sales](https://www.emplotec.com/erp/crm-sales.md)

The whole sales side: enquiries and site visits, unit inventory, bookings, payment schedules, demand letters raised from the site diary and receipts on the same ledger, set up for developers and then for your own plans and letters.

- Unit inventory with floor rise, car parks and price lists
- Demands raised when a stage is cast; cancellations and transfers
- Channel partner commissions on each booking

### Add-on: [Quality](https://www.emplotec.com/erp/quality.md)

Snag lists and handover checklists on mobile, with photos, so every apartment is checked before possession.

- Construction checklists on mobile
- Snags assigned to the contractor who owns them
- Safety inspections and toolbox talks

### Add-on: [Assets & Maintenance](https://www.emplotec.com/erp/assets-maintenance.md)

Lifts, DG sets, STPs and fire systems registered as they're installed, with AMC visits and preventive plans from handover on, and the asset register handed to the owners' association.

- Building plant with QR tags
- AMC vendors' visits logged
- Preventive plans by calendar or hour meter

### Add-on: [Billing](https://www.emplotec.com/erp/billing.md)

Maintenance charges and the corpus billed to owners until the association takes over, and rent, escalation and service charges on the shops and offices you keep.

- Maintenance charges by square foot, billed monthly
- Leases with rent escalation and security deposits
- Service charges shared by area

### Add-on: [Field Service](https://www.emplotec.com/erp/field-service.md)

Maintenance after handover: residents' calls from the portal or a QR at the tower, lifts, pumps, DG sets and fire systems under the defect liability period or an AMC, technicians dispatched inside the SLA, and every report signed.

- Calls from the portal or a QR scan
- Defect liability cover checked on intake
- PPM on lifts and fire systems

### Add-on: [Expense](https://www.emplotec.com/erp/expense.md)

Site imprest for engineers and storekeepers, and the sales team's site-visit travel, charged to the tower and the project company.

- Imprest per site
- Charged to the tower and SPV
- Settled before the next top-up

### Add-on: [Planning](https://www.emplotec.com/erp/planning.md)

Each project company's plan: sales and collections from the payment schedules, construction cost from the tower budgets, and the funding gap month by month, rolled up for the group.

- Collections from payment schedules
- Cost from the tower budgets
- Funding gap by month

## One slab, from the budget to the payment.

Slab 6 of Tower C followed through every product it touches. The same record carries it from the budget to the bill and the SPV's books, and nobody re-enters anything.

1. **Projects: Tower C is budgeted per square foot.** Tower C's budget is set by cost code against its 3.00 lakh sq ft of built-up area: ₹88.5 Cr, or ₹2,950 a sq ft. Ravi approves budget rev 2 and the slab plan comes from the template.
2. **Procurement: Steel bought at the rate contract.** Karthik indents steel for slabs 5 and 6. Arun raises PO-4458 to Cochin TMT Traders at the rate contract, and Ravi approves it on his phone.
3. **Inventory: Received, then issued free to the contractor.** The truck is weighed at the gate and received into the site store. Senthil issues steel and cement free to Vypin Builders against slab 6, so every bag and tonne is tracked to the slab.
4. **Projects: The site diary records slab 6.** Karthik's DPR on 2 November records slab 6 cast: 186 m³ of concrete, Vypin's 46 workers, the pump's hours and photos. The slab is now measurable, and the cement used goes to the reconciliation.
5. **Projects: Vypin's bill is measured, cement recovered.** Deepa checks RA-09 against the DPRs: slab 6 is paid, slab 7 waits until it's cast. Cement past the limit is recovered, and retention, TDS and labour cess are deducted. The purchase invoice is drafted in the SPV's books.
6. **Books: Paid by the SPV, cost per square foot updated.** Priya releases the payment run from the Riverside SPV's bank. The retention waits for the defects period, the TDS is booked, and Tower C's cost to date and forecast cost per square foot update the same minute.

## Ask across every tower and company.

Emplotec reads the site, the stores, the contractors' bills and every company's books at once. It answers with the records it used, and anything it would change or send waits for your approval.

- Ask: "If steel goes up ₹4,000 a tonne, what does that do to Tower C?"
- Reads: Tower C budget, Steel still to buy, Open POs, Rate contracts, Quotes
- Answer: It adds ₹25.6 L to Tower C. A rate contract with Cochin TMT for the full 640 t holds today's price to June, which covers every slab to 22. I've drafted it for Arun.
- Plan: Steel · Tower C
-   - Rate contract RC-STL-27 · Cochin TMT: None → 640 t at ₹62,000 to June
-   - Tower C forecast: ₹3,140 a sq ft → Held at ₹3,140

- Ask: "Compare Vypin and Periyar on cost and speed per slab."
- Reads: Contractor bills, DPRs, Work orders, Material reconciliation
- Answer: Periyar is cheaper and faster. Tower C's floors 19 to 22 aren't awarded yet; an RFQ to both before December could save about ₹7 L and two weeks.
- Plan: Floors 19 to 22 · Tower C
-   - Structure, floors 19 to 22: Not awarded → RFQ to Vypin and Periyar
-   - RFQ closes: None → 30 Nov

- Ask: "Prepare the cost statement for the lender's next drawdown on Riverside."
- Reads: Riverside SPV books, Contractor bills, GRNs, Payments, Loan sanction terms
- Answer: The statement and its schedule of 1,284 bills and payments are ready for your CA to certify. The drawdown request for ₹12.0 Cr is drafted for Priya.
- Plan: Drawdown · Riverside
-   - Cost statement, 31 Oct: None → ₹104.9 Cr, 3 towers
-   - Supporting schedule: None → 1,284 bills and payments
-   - Drawdown request: None → ₹12.0 Cr, draft for Priya

- Ask: "What's left to pay before Tower A's possession?"
- Reads: Tower A forecast, Commitments, Contractor retention, MSME due dates
- Answer: ₹19.6 Cr between now and June, peaking at ₹4.1 Cr in March for lifts and facade. I've drafted a month-by-month plan with MSME bills paid first.
- Plan: Tower A · to possession
-   - Payment plan, Nov to Jun: None → ₹19.6 Cr by month
-   - MSME bills: In the run → Paid first

## Your project's way of working, not ours.

Emplotec fits the way you build at four levels. The core is never forked, so everything we change for you carries through every upgrade.

### Configure it

Your fields, forms, approvals and dashboards, set up without code before you go live.

- Slab number: 6
- Slab area: 9,800 sq ft
- Structural engineer sign-off

### Set your rules

Business rules that run on every record: holds, checks, limits and who is told.

- Hold the bill if the DPR hasn't recorded the slab as cast
- Recover cement past 3% wastage at the issue rate

### Your industry's extension

What every developer needs, built once and kept up for all of them.

- Cost per sq ft by tower updated on approval
- Labour cess on every contractor bill: 1%
- Buyers' demand letters raised when the slab is recorded cast

### Built for you alone

When your process is yours alone, we build an extension for it, on the same platform, upgraded with it.

- Kayal's slab bonus: ₹50,000 for a slab cast in under 10 days
- Tower C bills above ₹25 L go to the MD

## Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your business needs something outside the ERP, such as an app for your buyers, a broker portal or a link to the property portals, our team builds it and connects it to Emplotec, under the same support.

- A buyer app with construction photos and snag requests
- Leads from the property portals into your CRM
- A channel partner portal for brokers
- Your old real estate ERP's history, moved and kept searchable

## Built for the rules where you build.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

### India: India

- GST e-invoices, and GST on every contractor and supplier bill
- TDS on contractor and supplier bills, under the Income-tax Act 2025
- TDS deducted by buyers on each instalment, tracked to its certificate
- 70% of collections to the RERA designated account, withdrawals against certificates
- Labour cess on contractor bills
- Contract labour under the OSH Code, with contractors' challans checked
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates on every supplier bill
- Separate books for each project company, with consolidation
- Tally sync, if your accounts stay in Tally for now

### UAE: UAE

- VAT on every contractor and supplier bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Buyer payments tracked into each project's escrow account
- Separate books for each project company, with consolidation

### Saudi Arabia: Saudi Arabia

- VAT on every contractor and supplier bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Buyer payments tracked into each project's escrow account
- Separate books for each project company, with consolidation

### UK: United Kingdom

- VAT with Making Tax Digital
- PAYE payroll with RTI
- Retention on every contractor's interim application
- Separate books for each project company

### US: United States

- Sales tax, state by state
- Payroll
- 1099 forms for contractors
- Retainage held on every contractor bill
- Separate books for each project company

## Live in 30 days, without stopping a tower.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which projects, companies and products.

- We map your projects first: towers, budgets, contractors, work orders, the site store and how bills are checked today.
- Your open POs, store stock, contractor balances, retention, advances and each company's accounts come across from Tally and Excel.
- We fit the cost codes, DPR fields, bill formats and approvals to the way you build.
- Site engineers, stores and accounts train on their own tower's data, then go live project by project.

## Questions and answers

### What is the best real estate ERP software for developers?

One that shows cost per square foot by tower while you build, checks every contractor's bill against the site, reconciles free-issue material and keeps each project company's books on the same ledger. Emplotec does that in one system, with an AI agent across it, fitted to the way you build.

### Does Emplotec handle unit bookings and customer payment schedules?

Yes. Unit inventory with blocks and price lists, bookings, payment schedules (construction-linked, time-linked or your own), demand letters, customer receipts and possession all run in Emplotec, on the same ledger as the build. When the site diary records a slab cast, the demands for that stage are drafted for your sales head to approve. Each is set up for developers, then fitted to your own plans, letters and approvals.

### Can we track cost per square foot by tower?

Yes. Each tower or phase is a project with its budget by cost code and its built-up area. Commitments, issues, contractor bills and hours reach it as they happen, so the forecast cost per square foot is always current.

### Can each project company or SPV keep its own books?

Yes. Every company and branch is included. Each SPV keeps its own books, GST registration and fiscal year on one ledger, inter-company entries are mirrored automatically, and the group consolidates with eliminations.

### Can we keep Tally for our accounts?

Yes. The build and sales sides run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

### Can you customise it for the way we build?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for developers; and extensions built for you alone, such as your own contractor incentive. The core is never forked, so your changes survive upgrades.

### Is it cloud or on our own servers?

Both. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.

### Does it run maintenance after handover?

Yes. Residents raise calls from the portal or by scanning a QR at the tower. Each call is checked against the defect liability period or the AMC, a technician is dispatched inside the SLA, and the report is signed on the phone; lifts and fire systems get their PPM visits on plan (Field Service). Site imprest is claimed against the tower (Expense), and each project company's collections, construction cost and funding gap are planned month by month (Planning).

### What doesn't Emplotec cover for developers?

Filing RERA returns with the authority and building BIM models. Emplotec keeps the figures a RERA return draws on, such as collections into the designated account and progress by tower, and your BIM models stay in your design tools. Everything else, from the build to bookings, demands, receipts and each company's books, runs in Emplotec.

### Does it track land, approvals and the RERA account?

Yes. Each land parcel keeps its title documents, encumbrance search, conversion and any landowner share units. Each approval keeps its validity and conditions, with reminders before it lapses. Buyer receipts are split to the project's RERA designated account as they arrive, and every withdrawal is matched to the engineer's, architect's and CA's certificates for that stage.

### Does it handle cancellations, transfers and broker commissions?

Yes. A cancellation forfeits what the agreement for sale allows, reverses the GST and schedules the refund for approval. A transfer moves the booking and its receipts to the new buyer with the transfer fee, and a unit change carries the price difference. Channel partners are registered with their bookings, and each commission falls due on the stage you agreed, with GST and TDS applied.

### Can it bill maintenance charges and rent after handover?

Yes. Maintenance charges by square foot, the maintenance deposit and the corpus fund are billed to owners until the association takes over, and the corpus and asset register are handed to it. Shops and offices you keep are leased with rent, escalation, security deposits and service charges billed every month.

## Related industries

- [Construction and EPC](https://www.emplotec.com/industries/construction-and-epc.md)
- [Facility management and manpower](https://www.emplotec.com/industries/facility-management.md)
- [Hotels](https://www.emplotec.com/industries/hotels.md)
- [Interiors and fit-out](https://www.emplotec.com/industries/interiors-and-fit-out.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- Emplotec ERP: https://www.emplotec.com/erp.md
- All industries: https://www.emplotec.com/industries.md
