# Costing sheet format in Excel, with cost per unit and selling price

> A cost sheet builds up what one unit really costs, from material and labour to the selling price. Fill in this one on the page, or download the Excel with every formula in place.

Page: https://www.emplotec.com/templates/costing-sheet-format · Updated: 2026-11-06

Market: India

- Cost sheet as ICAI teaches it
- Per-unit cost and selling price
- Part cost sheet for quotes
- Excel with formulas

## Download

- Excel: https://www.emplotec.com/downloads/costing-sheet-format.xlsx
- Word: https://www.emplotec.com/downloads/costing-sheet-format.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/costing-sheet-format.pdf
- Fill it in online: https://www.emplotec.com/templates/costing-sheet-format

## What the format contains

### Cost sheet (portrait)

- Title: Cost sheet (Statement of cost and profit for the period)
- Issuer block: Name and address, Name and address
- Fields: Product and cost unit, Period, Plant or cost centre
- Calculation: Opening stock of raw material, Add: purchases, with carriage and freight inward, Less: closing stock of raw material, Direct material consumed, Direct labour (direct employee cost), Direct expenses (job work, royalty on production), Prime cost, Add: factory overheads (works overheads), Gross works cost, Add: opening work in progress, Less: closing work in progress, Works cost (factory cost), Add: quality control and process R&D, Add: administration overheads (production related), Less: credit for scrap and recoveries, Add: primary packing cost, Cost of production, Add: opening stock of finished goods, Less: closing stock of finished goods, Cost of goods sold, Add: administration overheads (general), Add: selling and distribution overheads, Cost of sales, Profit margin on cost of sales (%), Profit, Sales (selling price), Units produced, Units sold, Cost of production per unit, Cost of sales per unit, Selling price per unit
- Signatures: Prepared by, Checked by (accounts), Approved by

### Part cost (quote) (portrait)

- Title: Part cost sheet (Piece-price breakup for a quotation)
- Issuer block: Name and address, Name and address
- Fields: Part name and no., Drawing no. and revision, Customer and enquiry ref., Material and grade, Main machine, Date
- Cost per piece: Input (casting) weight per piece, kg, Raw material rate, ₹ per kg, Raw material cost, Finished weight per piece, kg, Scrap weight per piece, kg, Scrap rate, ₹ per kg, Less: scrap recovery, Net material cost, Bought-out parts (bushes, plugs, fasteners), Machine hour rate, ₹ per hour, Cycle time per piece, minutes, Machining cost, Other operations (washing, painting, testing), Conversion cost, Rejection allowance (%), Rejection cost, Packing and freight per piece, Factory cost per piece, Overheads and inventory carrying cost (%), Overheads, Profit (%), Profit, Price per piece, before GST, Quantity quoted, Order value, before GST
- Basis: Material at today's rate, valid for 30 days. Price excludes GST, tooling and fixtures, which are quoted separately. Raw material rate variation is passed on as agreed in the order.
- Signatures: Costed by, Checked by, Approved by

## What a cost sheet is

A cost sheet, or costing sheet, is a statement that adds up the cost of a product in stages: what went into it directly, what the factory spent to make it, what it cost to run the office around it, and what it took to sell and deliver it. Each stage has a name, and the last line is the selling price.

Manufacturers use it for three jobs. It sets prices and quotes. It shows which cost moved when the margin falls. And it values closing stock and work in progress at cost, which the books need every period end.

> Note: This page has two formats. The first is the period cost sheet (statement of cost) that ICAI and every costing textbook teach. The second is a part cost sheet: the piece-price breakup a supplier sends with a quote.

## Cost sheet format: the stages and what goes in each

The order below is the one in ICAI's Cost and Management Accounting study material, which follows the Cost Accounting Standard on cost of production (CAS-4). Each subtotal is the one before it plus the costs listed under it.

**The stages of a cost sheet, as ICAI's study material sets them out.**

| Stage | What goes in | Formula |
| --- | --- | --- |
| Direct material consumed | Raw material and components that become part of the product, with freight inward and duties you can't recover | Opening stock + purchases + freight inward − closing stock |
| Prime cost | Direct material, direct labour (wages of operators on the job) and direct expenses (job work charges, royalty on production, hire of special tools) | Material + labour + direct expenses |
| Works cost (factory cost) | Factory overheads: indirect wages, power, consumables, maintenance, depreciation of plant, factory rent. Then adjust for work in progress | Prime cost + factory overheads + opening WIP − closing WIP |
| Cost of production | Quality control, process R&D, administration that serves production and primary packing, less scrap and by-product recoveries | Works cost + QC + R&D + production admin + primary packing − scrap |
| Cost of goods sold | The change in finished goods stock | Cost of production + opening finished goods − closing finished goods |
| Cost of sales | General administration, selling (salesmen, advertising, commission) and distribution (secondary packing, freight outward, warehousing) | Cost of goods sold + admin + selling + distribution |
| Sales | Profit added to cost of sales | Cost of sales + profit |

## How to prepare a cost sheet, step by step

1. Fix the period and the cost unit: per piece, per kg, per tonne or per batch. Everything after this is per that unit.
2. Work out material consumed from the stores ledger: opening stock, plus purchases and freight inward, less closing stock. Count only material that goes into the product.
3. Add direct labour from the wage register for operators who worked on this product, and direct expenses booked to it, such as job work charges.
4. Add factory overheads. If the plant makes several products, share overheads out on a fair base: machine hours for a machine shop, labour hours for assembly.
5. Adjust for work in progress at the start and end of the period, valued at works cost.
6. Add quality control, process R&D, production admin and primary packing, and take off what scrap and by-products fetched. That gives cost of production.
7. Adjust for finished goods stock to get cost of goods sold, then add general admin, selling and distribution to get cost of sales.
8. Add your profit margin to reach the selling price, and divide by units produced or sold for the per-unit figures.

In the example above, Nordwerk made 4,000 gearbox housings in October at a cost of production of ₹33,28,000, or ₹832 a piece. It sold 3,800, and the cost of sales came to ₹929 a piece. A 12% margin on cost puts the price at about ₹1,040.

## Part cost sheet: pricing one component for a quote

A buyer at an OEM doesn't want your monthly cost sheet. They want the cost of one piece, broken up so they can check each line. The second format does that, the way auto and engineering suppliers usually present it.

- Material: input weight times the material rate, less the scrap (input weight minus finished weight) at the scrap rate. Buyers check the weights against the drawing, so use real ones.
- Conversion: machine hour rate times cycle time, plus outside operations such as heat treatment, plating or painting.
- Machine hour rate: what a machine costs to run for an hour, including depreciation, power, tooling, maintenance, the operator and its share of space. Work it out per machine; a VMC and a manual lathe are very different.
- Rejection allowance, packing and freight, then overheads and profit as percentages, as most customers ask to see them.

Keep the material rate separate from conversion. When steel or casting prices move, most customers revise only the material line, on the index or rate the order names.

## What goes where, and common mistakes

| Cost | Where it goes |
| --- | --- |
| Freight on purchases (inward) | Direct material |
| Freight to customers (outward) | Distribution overheads, not factory cost |
| Primary packing (the box the product can't be sold without) | Cost of production |
| Secondary packing (cartons and crates for transport) | Distribution overheads |
| Normal scrap and rejection | Credit what scrap fetches against cost of production |
| Abnormal loss (a fire, a strike, a batch destroyed) | Out of the cost sheet, straight to profit and loss |
| Interest, income tax, donations, loss on sale of assets | Out of the cost sheet |

- Loading all overheads on labour cost when the plant is mostly machines. Use machine hours for machine-heavy work.
- Valuing closing finished goods at selling price instead of cost of production.
- Using last year's material rate in a quote. Price material at today's rate and say how long the quote holds.
- Leaving out rejection and rework. If one piece in fifty is scrapped, the other forty-nine carry its cost.

## Is a cost sheet compulsory?

For most businesses it is a management tool, not a statutory form. Companies in the industries listed in the Companies (Cost Records and Audit) Rules, 2014, and above the turnover limits those rules set, must keep cost records in Form CRA-1, and some of them need a cost audit. Check the rules for your products before you rely on a spreadsheet alone.

## How to use this format

1. Type into the white cells. Grey cells calculate themselves on the page and in the Excel file.
2. Fill the statement of cost from your stores ledger, wage register and expense ledgers for the period.
3. Enter units produced and units sold at the foot. The per-unit cost and price work themselves out.
4. For a quote, use the part cost sheet tab: weights from the drawing, your machine hour rate and the cycle time from a trial or a similar part.
5. Print or save as PDF, sign it, and keep it with the period's costing file or the quote.

## Or let every job cost itself.

In Emplotec the cost sheet isn't put together at month end. Each work order collects its material, labour, machine time and overheads as the work happens, so planned and actual cost sit side by side while the job is still on the floor.

- Job costing covers material, labour, machine and overhead, planned against actual, with WIP valued from the same records.
- Scrap, rejection and rework are booked on the job card, so their cost lands on the job that caused it.
- A new quote starts from similar past drawings and what those jobs actually cost, not from a blank sheet.
- Ask Emplotec why a job's margin fell, and it shows which cost element moved and the documents behind it.

Read more: [Emplotec Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

## Questions and answers

### What is the format of a cost sheet?

Direct material, direct labour and direct expenses add up to prime cost. Factory overheads and the WIP adjustment give works cost; quality control, production admin and primary packing less scrap give cost of production; the finished goods adjustment, admin, selling and distribution give cost of sales; profit added gives sales.

### What is the difference between prime cost and works cost?

Prime cost is only the direct costs: material, labour and direct expenses. Works cost, also called factory cost, adds factory overheads and adjusts for opening and closing work in progress.

### How do I calculate cost per unit from a cost sheet?

Divide cost of production by the units produced for the production cost per unit, and cost of sales by the units sold for the total cost per unit. The lines at the foot of the format do both.

### Where does freight outward go in a cost sheet?

Under distribution overheads, as part of cost of sales. Freight inward, on raw material, goes into direct material cost.

### Which items are not included in a cost sheet?

Purely financial and abnormal items: interest and finance costs, income tax, donations, losses on the sale of assets and abnormal losses such as a fire. They go straight to the profit and loss account.

### Is a cost sheet the same as a costing sheet for a quote?

Not quite. A cost sheet covers a product over a period. A part costing sheet prices one component for a customer, line by line: material less scrap, conversion, rejection, packing, overheads and profit. This page has both.

## Sources

- [ICAI Board of Studies: CA Intermediate study material, Cost and Management Accounting](https://boslive.icai.org/)
- [ICMAI Cost Accounting Standards Board: CAS-4, cost of production](https://icmai.in/Home/CASB_Downloads)
- [Companies (Cost Records and Audit) Rules, 2014, Ministry of Corporate Affairs](https://www.mca.gov.in/)

## Related

- [/erp/manufacturing](https://www.emplotec.com/erp/manufacturing.md)
- [/guides/production-planning-and-control](https://www.emplotec.com/guides/production-planning-and-control.md)
- [/templates/comparative-statement-format](https://www.emplotec.com/templates/comparative-statement-format.md)
- [/templates/mis-report-format](https://www.emplotec.com/templates/mis-report-format.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/manufacturing: https://www.emplotec.com/erp/manufacturing.md
- /guides/production-planning-and-control: https://www.emplotec.com/guides/production-planning-and-control.md
- /templates/comparative-statement-format: https://www.emplotec.com/templates/comparative-statement-format.md