# Inspection report template for site, equipment and quality inspections

> An inspection report records what was checked, what was found, how serious it is and who will fix it by when. This one has two forms: a findings report for sites, equipment and buildings, and a lot inspection for incoming and final quality checks.

Page: https://www.emplotec.com/templates/inspection-report-template · Updated: 2026-11-27

Market: US

- Findings with a 5 x 5 risk score
- Lot inspection to ANSI/ASQ Z1.4
- OSHA inspection intervals listed
- Excel with formulas, Word, PDF

## Download

- Excel: https://www.emplotec.com/downloads/inspection-report-template.xlsx
- Word: https://www.emplotec.com/downloads/inspection-report-template.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/inspection-report-template.pdf
- Fill it in online: https://www.emplotec.com/templates/inspection-report-template

## What the format contains

### Site inspection (landscape)

- Title: Inspection report (Routine site and equipment inspection, warehouse and yard)
- Issuer block: Name and address, Name and address
- Fields: Report no., Date and time, Type, Area, Inspector, Accompanied by, Checklist used, Previous report
- Findings (likelihood and severity 1 to 5; risk = likelihood x severity), columns: No., Item or location, What was found, Likelihood, Severity, Risk, Action, Owner, Due
- Summary: Items checked (checklist rev. 4), Findings raised, Items with no finding, Inspection score (% of items with no finding), High risk findings (risk 10 or more)
- Overall result and immediate actions taken: Satisfactory with actions. Dock 7 stays locked and tagged out until the vendor repair on 11/21. The high risk finding (dock 7 leveler) and the yard pothole, which forklifts cross every shift, are escalated to the site manager. Items 2 and 3 are fixed on the day. Risk bands used here: 1 to 4 low, 5 to 9 medium, 10 to 25 high.
- Signatures: Inspector, Area supervisor, Site manager

### Quality inspection (portrait)

- Title: Quality inspection report (Receiving inspection, sampling to ANSI/ASQ Z1.4, general level II, normal single sampling)
- Issuer block: Name and address, Name and address
- Fields: Report no., Date, Stage, Supplier, Part no. and rev., Description, PO and lot no., Lot size, Code letter, sample, Major AQL, Ac / Re, Minor AQL, Ac / Re, Cert. of conformance
- Dimensional checks (margin = distance of the worst reading from the nearest limit; negative is out of tolerance), columns: Characteristic, Lower limit, Upper limit, Gauge, Lowest reading, Highest reading, Margin
- Defects found in the sample, columns: No., Defect, Class, Found, Ac, Re, Result. Totals row: Total defects
- Sample result: Sample inspected, Defects found, Defects per hundred units in the sample
- Lot decision and disposition: Accept. Major 1 against Ac 2, minor 3 against Ac 5, no critical defect; every dimension within tolerance and every port thread passed the plug gauge. Lot released to stock, tag RS-1118-06. Bore burr reported to the supplier for their next process review.
- Signatures: Inspector, Quality engineer, Released by

## What an inspection report is

An inspection report is the written record of one inspection: what was looked at, against which checklist, specification or standard, what was found, how serious each finding is, and what will be done about it, by whom and by when. Without the report, an inspection is a walk around. With it, you have evidence for auditors, insurers and OSHA, and a list of actions you can close.

People search for inspection report templates for two different jobs, so this template has two forms. The site inspection form is for workplaces, warehouses, construction sites, equipment and buildings: findings, a risk score and actions. The quality inspection form is for manufactured parts: dimensions against tolerance, a sample sized to ANSI/ASQ Z1.4 and an accept or reject decision for the lot.

| Inspection | Use the form | What decides the result |
| --- | --- | --- |
| Workplace or warehouse safety walk | Site inspection | Findings, their risk score and whether actions close on time |
| Construction site or jobsite | Site inspection | Hazards found by the competent person and fixed before work continues |
| Equipment (forklift, crane, ladder, slings) | Site inspection, one line per item | Defects that take the item out of service until repaired |
| Building, property or move-out | Site inspection, one line per room or system | Condition recorded with photos, repairs and who pays |
| Receiving, in-process or final quality check | Quality inspection | Defects in the sample against the Ac and Re numbers, and readings against tolerance |

## What to include in an inspection report

| Field | What to write |
| --- | --- |
| Report number | A unique number, so a finding can be traced to the report that raised it and the report that closed it. |
| Date, time and area | Exactly where and when. Conditions change by shift, so the time matters. |
| Type | Routine, pre-use, follow-up, after an incident, or a receiving, in-process or final inspection. |
| Inspector and who went along | The person responsible for the result, and the supervisor or engineer who walked with them. |
| Checklist or standard | The checklist and its revision, the drawing revision, or the OSHA standard or code the inspection is against. |
| Findings | One line per finding: the item, what was found in plain words, the risk score, the action, the owner and the due date. |
| Summary | Items checked, findings, the score and the number of high risk findings, so reports can be compared month to month. |
| Result and immediate actions | Satisfactory, satisfactory with actions, or unsatisfactory; and anything locked out or stopped on the spot. |
| Signatures | The inspector, the supervisor of the area and the manager who accepts the actions. |

> Note: Write the finding, not the judgment. "Pothole about 3 in. deep in the forklift travel path at spot 22" can be fixed and checked. "Yard in poor condition" cannot.

## How the risk score works

Each finding gets a likelihood (how likely it is to cause harm, 1 to 5) and a severity (how bad the harm would be, 1 to 5). Multiplied together they give a risk score from 1 to 25, which the template works out for you. The score sorts the action list, so the dock leveler that could drop a forklift is fixed before the dented upright that only needs watching.

**These bands are a common company convention, not a legal rule. Use your own risk matrix if you have one, and keep it the same on every report.**

| Score | Band | What to do |
| --- | --- | --- |
| 10 to 25 | High | Stop or lock out now if people are exposed; escalate to the site manager; fix within days |
| 5 to 9 | Medium | Fix within the next few weeks; owner and date on the report |
| 1 to 4 | Low | Fix when convenient, or record and monitor at the next inspection |

In the example, 64 items were checked and 5 findings raised, so 59 items had no finding and the inspection score is 59 / 64 x 100 = 92.19%. One finding scored 10 or more (the dock leveler, 3 x 4 = 12). The pothole scores 3 x 3 = 9, medium, but the inspector escalates it too because forklifts drive over it every shift: the score sorts the list, it doesn't replace judgment.

## Inspections OSHA requires, and how often

OSHA does not prescribe an inspection report form, but many standards require inspections at set intervals, and a written record is how you show they happened. A few that come up on most sites:

**States with their own OSHA-approved plans can add requirements. Check your state plan, your insurer and the equipment maker's manual too.**

| Item | How often | Standard |
| --- | --- | --- |
| Portable fire extinguishers | Visual inspection monthly; maintenance check yearly | 29 CFR 1910.157(e)(2) and (e)(3) |
| Forklifts and other powered industrial trucks | Before being placed in service each day (after each shift if used around the clock) | 29 CFR 1910.178(q)(7) |
| Slings used in material handling | Each day before use, by a competent person | 29 CFR 1910.184(d) |
| Construction jobsites, materials and equipment | Frequent and regular inspections by competent persons | 29 CFR 1926.20(b)(2) |
| Scaffolds | Before each work shift and after anything that could affect structural integrity, by a competent person | 29 CFR 1926.451(f)(3) |

OSHA's Recommended Practices for Safety and Health Programs list regular workplace inspections as one of the ways to find hazards, alongside incident investigations and asking workers. Recording the findings, fixing them and checking at the next inspection that they stayed fixed is what turns the walk into a program.

## Quality inspection: picking the sample with ANSI/ASQ Z1.4

For parts and materials, the US sampling standard for inspection by attributes is ANSI/ASQ Z1.4 (it matches ISO 2859-1 used elsewhere). Find the code letter from the lot size and the inspection level (general level II unless the contract says otherwise), read the sample size for that letter, then read the acceptance (Ac) and rejection (Re) numbers for each AQL.

**Normal single sampling. Where the sample size is larger than the lot, inspect every piece.**

| Lot size | Code letter (level II) | Sample size |
| --- | --- | --- |
| 2 to 8 | A | 2 |
| 9 to 15 | B | 3 |
| 16 to 25 | C | 5 |
| 26 to 50 | D | 8 |
| 51 to 90 | E | 13 |
| 91 to 150 | F | 20 |
| 151 to 280 | G | 32 |
| 281 to 500 | H | 50 |
| 501 to 1,200 | J | 80 |
| 1,201 to 3,200 | K | 125 |
| 3,201 to 10,000 | L | 200 |
| 10,001 to 35,000 | M | 315 |
| 35,001 to 150,000 | N | 500 |
| 150,001 to 500,000 | P | 800 |
| 500,001 and over | Q | 1,250 |

In the example, a lot of 1,200 valve bodies gives code J and a sample of 80. At AQL 1.0 for major defects the lot is accepted with 2 or fewer and rejected at 3; at AQL 2.5 for minor defects, accepted at 5 and rejected at 6. One major and three minor defects were found, so the lot is accepted. The 4 defects in 80 pieces are 5 defects per hundred units in the sample. Critical defects are set at zero by company rule, not from the AQL table.

For each dimension the template works out the margin: the distance from the worst reading to the nearest limit. The bore's highest reading is 18.04 mm against an upper limit of 18.05 mm, a margin of 0.01 mm. That is a pass, but a thin one, and worth showing the supplier before it becomes a reject.

> Note: ISO 9001:2015 clause 8.6 says product is released only after the planned checks are done, and the records must show conformity with the acceptance criteria and who authorized the release. The signatures and the release tag on the quality form are that record.

## How to fill in the inspection report

1. Open the last report for the area first, and check whether its open actions were really closed.
2. Walk the checklist in order, and write every finding on the spot with a photo reference. Don't trust memory for the afternoon write-up.
3. Score likelihood and severity for each finding with the person who works there; they know how often the hazard is met.
4. Stop or lock out anything that could hurt someone today, and write that down as an immediate action.
5. Give every finding an owner who agreed to it and a realistic due date.
6. Fill the summary: items checked, findings, the score and the high risk count. Compare it with last month.
7. Sign, share it with the area supervisor the same day, and follow up on the due dates, not at the next inspection.

## Common mistakes on inspection reports

- A checklist of ticks with no findings written out, so nobody can tell what was wrong or check that it was fixed.
- Findings with no owner or due date. The same item reappears on every report.
- Inspecting the same route at the same time every month, so the night shift and the yard are never seen.
- Using a fixed sample ("5 pieces") for quality checks instead of sizing it from the lot and the AQL.
- Accepting a lot with a critical defect because the total count was under the major Ac number.
- Changing the risk matrix between reports, so scores can't be compared.

## Or inspect on a phone and let the findings chase themselves.

In Emplotec Quality the checklist for the area or the part opens on the inspector's phone. Findings become actions with owners and dates, and a quality inspection holds the stock in QC until the result releases it.

- Mobile checklists for safety inspections and floor walks, kept with incidents, near misses and hazard assessments.
- Inspection plans with AQL sampling for incoming, in-process, first-off and final checks, with stock held in QC until released.
- A gauge past its calibration date is blocked from the inspection.
- Corrective actions run as CAPA with a root cause and an effectiveness check, each with an owner and a due date.

Read more: [Emplotec Quality](https://www.emplotec.com/erp/quality.md)

## Questions and answers

### What should an inspection report include?

The report number, date, time and area, the type of inspection, the inspector, the checklist or standard used, one line per finding (what was found, its risk, the action, the owner and the due date), a summary, the overall result with any immediate actions, and signatures.

### How do you write an inspection report?

Walk the checklist and write each finding on the spot in plain, measurable words, with a photo reference. Score each finding for likelihood and severity, stop anything dangerous immediately, agree an owner and due date for every action, then summarize the result and sign it the same day.

### How is the risk score worked out?

Likelihood (1 to 5) times severity (1 to 5), giving 1 to 25. This template treats 10 to 25 as high, 5 to 9 as medium and 1 to 4 as low. Those bands are a company convention, so use your own matrix if you have one and keep it the same every time.

### Does OSHA require written inspection reports?

OSHA has no single inspection report form, but many standards require inspections at set intervals: fire extinguishers monthly (1910.157), forklifts before each day's use (1910.178), scaffolds before each shift (1926.451) and jobsites regularly by a competent person (1926.20). A dated, signed report is how you show they were done.

### What sample size should I use for a quality inspection?

Use ANSI/ASQ Z1.4: find the code letter from the lot size at general inspection level II, read the sample size, then the Ac and Re numbers for your AQL. A lot of 501 to 1,200 pieces gives code J and a sample of 80; at AQL 1.0 you accept with 2 defects and reject at 3.

### Can I use this as a home or building inspection report?

Yes, as a record of condition: one line per room or system, what was found, the photo reference, the repair, who is responsible and when. A licensed home inspection for a sale follows your state's standards of practice and report rules, so check those if you are a licensed inspector.

## Sources

- [29 CFR 1910.157, portable fire extinguishers](https://www.law.cornell.edu/cfr/text/29/1910.157)
- [29 CFR 1910.178, powered industrial trucks](https://www.law.cornell.edu/cfr/text/29/1910.178)
- [29 CFR 1910.184, slings](https://www.law.cornell.edu/cfr/text/29/1910.184)
- [29 CFR 1926.20, general safety and health provisions (construction)](https://www.law.cornell.edu/cfr/text/29/1926.20)
- [29 CFR 1926.451, scaffolds: general requirements](https://www.law.cornell.edu/cfr/text/29/1926.451)
- [OSHA: Recommended Practices, hazard identification and assessment](https://www.osha.gov/safety-management/hazard-Identification)
- [ASQ: ANSI/ASQ Z1.4, sampling procedures and tables for inspection by attributes](https://asq.org/quality-press/display-item?item=T964)
- [ISO 9001:2015, quality management systems: requirements](https://www.iso.org/standard/62085.html)

## Related

- [/erp/quality](https://www.emplotec.com/erp/quality.md)
- [/templates/incident-report-template](https://www.emplotec.com/templates/incident-report-template.md)
- [/templates/job-hazard-analysis-template](https://www.emplotec.com/templates/job-hazard-analysis-template.md)
- [/templates/capa-template](https://www.emplotec.com/templates/capa-template.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/quality: https://www.emplotec.com/erp/quality.md
- /templates/incident-report-template: https://www.emplotec.com/templates/incident-report-template.md
- /templates/job-hazard-analysis-template: https://www.emplotec.com/templates/job-hazard-analysis-template.md
