# Kaizen format: before and after sheet with savings worked out

> A kaizen sheet records one small improvement on one page: what the problem was, what was changed, what the numbers were before and after, and what it saves. Fill this one in on the page, or download it.

Page: https://www.emplotec.com/templates/kaizen-format · Updated: 2026-11-27

Market: India

- Before and after with % change
- Annual savings and payback
- PQCDSM category
- A4 landscape, Excel with formulas

## Download

- Excel: https://www.emplotec.com/downloads/kaizen-format.xlsx
- Word: https://www.emplotec.com/downloads/kaizen-format.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/kaizen-format.pdf
- Fill it in online: https://www.emplotec.com/templates/kaizen-format

## What the format contains

- Title: Kaizen sheet (One improvement, one page)
- Issuer block: Name and address, Name and address
- Fields: Kaizen no., Theme, Category (PQCDSM), Area and machine, Team, Started, Completed, Pillar or circle
- Before: the problem: What, Where the time went, Effect, Photo or sketch
- Root cause: Why 1, Why 2, Why 3, Internal work
- After: the countermeasure: What, Tools, External work, Photo or sketch
- Results: before and after, columns: Measure, Unit, Before, After, Change, Change, %, Measured over
- Savings: Changeover time before, minutes, Changeover time after, minutes, Changeovers per day, Working days a year, Machine hours freed a year, Machine hour rate, ₹, Saving a year, ₹, Cost of the kaizen, ₹, Payback, months
- Standardise and spread, columns: What was changed, Document and revision, Also applied to, Date
- Signatures: Team leader, Section in-charge, Plant head

## What a kaizen sheet is

Kaizen is Japanese for change for the better. In a plant it means many small improvements made by the people who do the work, rather than one large project. The kaizen sheet is the record of one such improvement, on one page: the problem, why it happened, what was changed, the numbers before and after, and how the change was made the standard.

Indian plants running TPM, lean or a suggestion scheme usually ask every team to submit kaizen sheets, display them on the shop-floor board, and review them each month. The sheet is what lets a good idea from one machine reach the others.

## What a kaizen format contains

| Part | What to write |
| --- | --- |
| Header | Kaizen number, theme in a few words, PQCDSM category, area and machine, team, start and completion dates. |
| Before | The problem as a measured fact, where the time, cost or defects come from, and a photo or sketch. |
| Root cause | A short why-why to the cause the change removes. |
| After | What was changed, with a photo or sketch from the same angle as the before photo. |
| Results | Each measure before and after, over a stated period, with the change and % change. |
| Savings | Hours, material or money saved in a year, the cost of the change and the payback. |
| Standardise and spread | The setup sheet, work instruction or checklist changed, and the other machines or lines it was applied to. |
| Sign-off | Team leader, section in-charge and plant head. |

## Kaizen categories: PQCDSM

**Many plants add E for environment. Pick the category of the main result; a kaizen can count under two.**

| Category | Typical measures | Example kaizen |
| --- | --- | --- |
| P, productivity | Output per hour, cycle time, OEE, changeover time | Quick-clamp fixture cuts changeover from 45 to 18 minutes |
| Q, quality | Rejection PPM, rework, customer complaints | Poka-yoke pin stops a part being loaded the wrong way |
| C, cost | Material, energy, consumables, tooling cost | Coolant filter extends coolant life from 3 to 8 weeks |
| D, delivery | Lead time, on-time dispatch, WIP | Kanban for a sub-assembly removes a day's waiting |
| S, safety | Near misses, unsafe acts, first-aid cases | Guard interlock on a press loading area |
| M, morale | Suggestions per person, attendance, 5S score | Tool shadow board ends tool hunting at the start of shift |

## How to fill in the kaizen sheet

1. Pick one problem small enough for the team to fix in a few weeks. Write it as a number: minutes, pieces, rupees, near misses.
2. Measure the before state over a fair period, and take the before photo.
3. Ask why until you reach the cause your change will remove. For changeovers, split the steps into internal (machine stopped) and external (machine running) first.
4. Make the change and take the after photo from the same place.
5. Measure the after state over the same length of period. The sheet works out the change and % change; a fall is shown as a negative number.
6. Work out the saving: machine hours freed times the machine hour rate, material saved times its cost, or rejections avoided times their cost. Put the cost of the change beside it.
7. Update the standard (setup sheet, work instruction, checklist), apply the change to similar machines, and get the sheet signed.

## How to work out kaizen savings honestly

In the example, changeover fell from 45 to 18 minutes, three times a day for 300 days: 27 minutes times 900 changeovers is 24,300 minutes, or 405 machine hours a year. At a machine hour rate of ₹900 that is ₹3,64,500 a year, against a cost of ₹28,000, so the change pays back in under a month.

- Count hours freed as savings only if they are used: more output on a bottleneck machine, or less overtime. Freed hours on a machine that waits for work save nothing.
- Use the costing team's machine hour rate, not a guess, and write which rate you used.
- Count material, energy and rejection savings at cost, not at selling price.
- Show soft results (safety, morale, 5S) as numbers too, but don't convert them to rupees.

## Common mistakes with kaizen sheets

- A before photo with no before number, so the result cannot be proved.
- Results measured for one day after the change and called permanent.
- No change to the standard, so the improvement fades when the team moves on.
- Savings counted from hours freed on a machine that was not the constraint.
- Kaizens that are really maintenance jobs: replacing a worn part restores the standard; it does not improve it.

## Or take the before and after from the machine's own records.

In Emplotec the setup and run minutes booked on job cards, the downtime and the OEE of each machine are already recorded, so a kaizen's before and after come from the same data, not from a stopwatch study that ends when the sheet is signed.

- OEE and downtime come from shop-floor bookings, by machine and by shift.
- Setup and run time are booked separately on each job card, so changeover time is visible per part and per machine.
- Setup sheets, tool lists and digital work instructions are versioned documents, so the new standard reaches every operator.
- Improvement actions are tracked as work items on boards in Emplotec Work, linked to the machine they change.

Read more: [Emplotec Manufacturing](https://www.emplotec.com/erp/manufacturing.md)

## Questions and answers

### What is a kaizen sheet?

A one-page record of one improvement: the problem, its cause, the change made, the results before and after, the saving and how the change became the standard. Plants display them on the shop-floor board and review them monthly.

### What is PQCDSM in kaizen?

The categories a kaizen improves: productivity, quality, cost, delivery, safety and morale. Many plants add environment. The category is chosen by the main result.

### How do I calculate kaizen savings?

Multiply what was saved by its cost: machine hours freed times the machine hour rate, material saved times its cost, rejections avoided times their cost, over a year. Count freed hours only if they are used for output or reduce overtime.

### What is the difference between kaizen and kaizen blitz?

A kaizen is any small improvement, often by one person or team over a few weeks. A kaizen blitz, or kaizen event, is a focused workshop of a few days in which a team redesigns one area or process.

### What is a good kaizen example in manufacturing?

Cutting changeover time on a machine by moving work outside the stoppage: preparing the next part's tools while the machine runs, and using quick clamps and locating pins instead of bolts. The example on this page cuts 45 minutes to 18.

### Does every kaizen need savings in rupees?

No. Safety, morale and 5S kaizens are measured by their own numbers, such as near misses or audit scores. Put a rupee figure only where the saving is real and costed.

## Sources

- [Toyota: Toyota Production System](https://global.toyota/en/company/vision-and-philosophy/production-system/)
- [Kaizen Institute: What is kaizen](https://kaizen.com/what-is-kaizen/)
- [ICMAI: Cost accounting standards (CAS-3 production and operation overheads, machine hour rate)](https://icmai.in/)

## Related

- [/erp/manufacturing](https://www.emplotec.com/erp/manufacturing.md)
- [/tools/oee-calculator](https://www.emplotec.com/tools/oee-calculator.md)
- [/templates/job-card-format](https://www.emplotec.com/templates/job-card-format.md)
- [/templates/why-why-analysis-format](https://www.emplotec.com/templates/why-why-analysis-format.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/manufacturing: https://www.emplotec.com/erp/manufacturing.md
- /tools/oee-calculator: https://www.emplotec.com/tools/oee-calculator.md
- /templates/job-card-format: https://www.emplotec.com/templates/job-card-format.md