# Service report format for breakdown, PPM and AMC visits

> The report a technician leaves after a breakdown, PPM or installation visit: the asset, the contract cover, the times against the SLA, what was found and done, readings, parts used and the customer's sign-off. Fill it in here, or download Excel, Word or a blank PDF.

Page: https://www.emplotec.com/templates/service-report-format · Updated: 2026-11-25

Market: India

- Breakdown and PPM sheets
- SLA times, readings and checklist
- Covered and chargeable parts split, with GST
- Free, no sign-up

## Download

- Excel: https://www.emplotec.com/downloads/service-report-format.xlsx
- Word: https://www.emplotec.com/downloads/service-report-format.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/service-report-format.pdf
- Fill it in online: https://www.emplotec.com/templates/service-report-format

## What the format contains

### Service report (portrait)

- Title: Service report (Breakdown visit under comprehensive maintenance contract). Copy line: Customer copy
- Issuer block: Name and address, Name and address, GSTIN, Service desk
- Fields: Report no., Job / call no., Visit type, Date
- Customer and site: Customer, Site, Contact, Phone
- Contract cover: Contract no., Cover, Valid to, Customer PO
- Fields: Equipment, Make and model, Serial no., Asset tag and location, Run hours, Warranty
- Fields: Call logged, Response due (SLA), Arrived on site, Work completed, Time on site, Response SLA
- Complaint as reported: Chiller 2 tripped on high discharge pressure at 07:30. Floors 6 to 9 of Tower B warm.
- Fields: Fault found, Failure code, Root cause
- Work done: Cleaned the condenser water strainer. Replaced the main contactor of condenser pump CWP-2. Leak-tested the circuit and found a leak at the oil cooler flare joint; remade the joint and topped up 6 kg of R-134a. Reset the high-pressure trip and ran the chiller on load for 2 hours. Readings normal at handover.
- Readings, columns: Parameter, Unit, Before, After, Normal range
- Checklist, columns: Sr., Check, OK / not OK, Remarks
- Parts and consumables used, columns: Sr., Part no. and description, New serial / old part, Qty used, Chargeable qty, Rate, Chargeable amount. Totals row: Chargeable parts
- Charges: Chargeable parts (total above), Chargeable labour and call-out, Taxable value, GST at 18%, Amount to be invoiced
- Photos: 4 photos attached: strainer before cleaning, old contactor, the remade flare joint, panel readings after the repair.
- Fields: Equipment status at handover, Follow-up needed, Next visit
- Customer remarks: Cooling back on floors 6 to 9. Rating: 4 of 5.
- Signatures: Technician: SM, ID T-114, Customer representative: AR (signature, or OTP approval with time), Service supervisor

### PPM visit report (landscape)

- Title: Preventive maintenance (PPM) visit report (Quarterly PPM 2 of 4, FCUs and AHUs, Tower B)
- Fields: Report no., Contract no., Site, Date, Planned month, Technicians, Time in / out, Units planned / done
- Units serviced, columns: Sr., Asset tag, Equipment and location, Filters, Coil and tray, Belt and bearings, Supply air °C, Motor A, Status, Remarks
- Observations and recommendations: AHU-08 supply fan bearing is noisy; replacement recommended before the next PPM (quote QT/26-27/288, chargeable as wear part under clause 5). Cafeteria FCU drains choke often; suggest a monthly drain flush.
- Signatures: Technician, Customer representative (signature or OTP), Service supervisor

## What a service report is

A service report (also called a field service report, job sheet or technician visit report) is the record a technician leaves with the customer after every visit: what was wrong, what was done, what parts went in, how long it took, and the customer's sign-off. It is the provider's proof that the visit happened and the customer's proof of what they are being billed for.

Under an AMC or CMC the signed reports are also the evidence that the preventive visits in the contract were done and that breakdown calls were met within the response time. If a dispute comes up at renewal, the reports are what both sides go back to.

## What a service report format must contain

| Field | Why it matters |
| --- | --- |
| Report no. and job or call no. | Links the report to the call log and the invoice; one call can need two visits. |
| Customer, site and contact | Large customers have many sites; the report must say which. |
| Asset make, model, serial and tag | Proves which unit was serviced. Without the serial, nobody can build the unit's history or check its cover. |
| Contract cover | AMC, CMC, warranty or chargeable decides who pays for labour and parts. |
| Call logged, response due, arrival, completion | The SLA is measured on these times. Write them down, not "morning". |
| Complaint as reported | The customer's words, before diagnosis. Helps when the fault found turns out to be different. |
| Fault found, failure code and root cause | Codes let you count repeat failures by model; the root cause stops the same call next month. |
| Work done | Plain sentences, in the order done. |
| Readings before and after | Shows the equipment is back in range, and gives the next technician a baseline. |
| Checklist | The standard checks for that equipment type, so nothing is skipped. |
| Parts used, with serials | Serials for warranty claims and traceability; old parts returned or left on site. |
| Covered and chargeable split | The customer agrees to the chargeable part on site, not when the invoice arrives. |
| Photos | Before and after, the nameplate, the failed part. Settle most disputes on their own. |
| Technician and customer sign-off | A signature or an OTP approval, with name and time. An unsigned report is weak proof. |
| Follow-up and next visit | Open items, quotes sent and the next PPM date. |

## Breakdown, PPM and installation reports compared

|  | Breakdown report | PPM report | Installation and commissioning report |
| --- | --- | --- | --- |
| Starts from | A customer call | The contract's visit plan | A sales order or project |
| Times that matter | Call, response due, arrival and fix | Planned month and date done | Handover date |
| Main content | Fault, failure code, work done, parts | Checklist and readings for every unit | Site checks, settings, test readings, training given |
| Usually one report per | Call | Visit, covering many units | Installation |
| What it proves | The SLA was met and the fault fixed | The contract's PPM was done | The equipment was handed over working; warranty starts |

The download has two sheets: the full report for a breakdown or single-unit visit, and a PPM sheet for a visit that covers many units. For an installation, use the first sheet with visit type "Installation" and record the commissioning readings and the warranty start date.

## How to fill in this service report format

1. Before leaving for the site, fill in the report and job numbers, the customer, the asset and the contract cover from the call log.
2. Note the arrival time when you reach the equipment, not the gate.
3. Write the complaint in the customer's words, then take the before readings and photos.
4. Record the fault found, pick a failure code from your company's list, and write the root cause if you know it.
5. List every part with its serial, and mark how many are chargeable. Show the chargeable amount to the customer before you fit a chargeable part.
6. Take the after readings, run the checklist, and note the equipment's status at handover.
7. Get the customer's signature or OTP approval with name and time, and leave a copy before you go.

## The filled example: a chiller breakdown under CMC

The format above is filled for a 300 TR chiller that tripped at 07:30. The call was logged at 07:40; the contract gives 4 hours, so response was due by 11:40 and the technician arrived at 10:05. The contactor is covered by the CMC, but refrigerant is excluded, so the 6 kg of R-134a is chargeable: ₹5,700 plus 18% GST, ₹6,726 in all. The customer approved it on site.

> Note: GST on parts and on repair services depends on the HSN or SAC of each item. Check the rate for your items, and invoice through your normal GST invoice, with the service report as the annexure.

## Tips for service reports that hold up

- Fill it in on site, not from memory in the evening.
- Use failure codes, not free text alone. After a year you can see which model, part and site fail most.
- Always take the asset's serial number, even on a PPM visit that covers twenty units.
- Record readings with units and the normal range, so the next technician can compare.
- Never leave a chargeable item for the invoice to explain. Agree it on the report.
- Number the reports in one series per year, and keep them with the contract. At renewal, count PPM visits done against the contract and breakdowns met against the SLA.
- If the customer refuses to sign, write "customer declined to sign" with the name and time, and send the report by email the same day.

## Or let the signed report on the phone become the invoice.

In Emplotec the technician fills the service report on the phone, even offline in a plant room or a lift pit. The customer signs it or approves it by OTP before the technician leaves, and its time, parts and call-out charges are ready to bill through Billing.

- The asset's history, cover and SLA on the phone before the visit; check-in by geofence, QR or the customer's OTP.
- Checklists, readings, photos and parts used with serials, in regional languages.
- Covered parts to the contract's cost and billable parts to the invoice, with the report and photos as the annexure.
- PPM compliance and every signed report on the customer's portal.

Read more: [Emplotec Field Service](https://www.emplotec.com/erp/field-service.md)

## Questions and answers

### What is a service report?

The record a technician leaves after a service visit: the asset, the complaint, what was found and done, readings, parts used, times against the SLA, charges and the customer's sign-off.

### What should a field service report include?

Report and job numbers, customer and site, asset make, model and serial, contract cover, call, arrival and completion times, fault and failure code, work done, readings, checklist, parts with serials, chargeable and covered split, photos, signatures and the next visit.

### What is the difference between a breakdown report and a PPM report?

A breakdown report covers one call: the fault, the fix and the response time. A PPM report covers a planned preventive visit, usually many units, with a checklist and readings for each.

### Is the customer's signature necessary on a service report?

No law requires it, but most AMC and CMC contracts ask for it, and an unsigned report is weak proof of the visit. A one-time password approval with the person's name and time works the same way and is easier on site.

### Can the service report be used as the invoice?

It should be the invoice's annexure. Raise a proper GST invoice for the chargeable parts and labour, and attach the signed service report so the customer can see what the bill is for.

### What is a failure code in a service report?

A short code for the type of fault (electrical, refrigerant, mechanical, control) and the part. Using the same list every time lets you count repeat failures by model, site and part.

## Sources

- [GST rates for goods and services, CBIC tax information portal](https://taxinformation.cbic.gov.in/)
- [Indian Contract Act, 1872, India Code](https://www.indiacode.nic.in/)

## Related

- [/erp/field-service](https://www.emplotec.com/erp/field-service.md)
- [/templates/amc-format](https://www.emplotec.com/templates/amc-format.md)
- [/templates/complaint-register-format](https://www.emplotec.com/templates/complaint-register-format.md)
- [/templates/escalation-matrix-format](https://www.emplotec.com/templates/escalation-matrix-format.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/field-service: https://www.emplotec.com/erp/field-service.md
- /templates/amc-format: https://www.emplotec.com/templates/amc-format.md
- /templates/complaint-register-format: https://www.emplotec.com/templates/complaint-register-format.md