# Snag list template for new builds, fit-outs and handovers

> A snag list records every defect found when a building or home is inspected before handover, so each one is put right. This template lists snags by room and trade with who fixes them and by when, and for contractors works out the retention held until the certificate of making good.

Page: https://www.emplotec.com/templates/snag-list-template · Updated: 2026-11-27

Market: UK

- Room, trade, defect, severity, owner
- Cost to put right
- Retention to making good
- A4 landscape, Excel with formulas

## Download

- Excel: https://www.emplotec.com/downloads/snag-list-template.xlsx
- Word: https://www.emplotec.com/downloads/snag-list-template.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/snag-list-template.pdf
- Fill it in online: https://www.emplotec.com/templates/snag-list-template

## What the format contains

- Title: Snag list (Pre-handover inspection, 12 November 2026)
- Issuer block: Name and address, Name and address
- Fields: Development, Plot / unit, Inspection, Inspected by, Buyer, Legal completion, Warranty, List rev.
- Snags, columns: Ref., Room or area, Trade, Defect and what good looks like, Severity, To fix, Target, Cleared, Cost to put right. Totals row: Total
- Progress, and retention for the contractor: Snags raised, Snags cleared and checked, Cleared, Contract sum (build contract), Retention percentage in the contract, Retention held, Share released at practical completion, %, Released at practical completion, Held until the certificate of making good
- Notes: Major snags 7-06, 7-07 and 7-10 must be cleared before legal completion. The buyers' inspector to re-inspect on 25 November. Snags found after completion go to Calder Homes customer care within the two-year builder warranty period.
- Signatures: Site manager, Inspector or buyer, Customer care

## What a snag list is

A snag is a defect or unfinished item in new building work: a door that sticks, a crack in the plaster, paint on a socket, a missing seal. A snag list (or snagging list) records every snag found on an inspection, with where it is, who will put it right and by when, so nothing is lost between handover and the end of the defects period. In the US the same list is called a punch list.

| Who uses it | When |
| --- | --- |
| Contractors and site managers | Before practical completion or handover, and again before the end of the rectification period |
| Employer's agents, architects, clerks of works | On the practical completion inspection, and to agree the schedule of defects |
| New home buyers and their inspectors | On the pre-completion inspection and in the first years after moving in |
| Fit-out and refurbishment contractors | At handover to the tenant or landlord |

## Snagging under JCT and NEC contracts

| Stage | JCT | NEC |
| --- | --- | --- |
| The work is finished | Practical completion certified by the architect or contract administrator | Completion certified by the project manager |
| Defects found after | Made good during the rectification period stated in the contract particulars | Notified up to the defects date in the contract data, and corrected within the defect correction period |
| The list | A schedule of defects at the end of the rectification period | Defects notified by the supervisor or contractor |
| The end | Certificate of making good, which releases the rest of the retention | Defects certificate |

Snags found before practical completion should be cleared before it is certified. The rectification period is whatever the contract states, often 6 or 12 months. Retention is held from interim payments at the percentage in the contract; under JCT contracts part of it is usually released at practical completion and the rest with the certificate of making good. The template takes your contract's percentage and the share released at practical completion, and works out what is still held.

> Note: In the example, retention at 3% of a £2,480,000 contract is £74,400.00. With half released at practical completion (£37,200.00), £37,200.00 is held until the certificate of making good. Separately, the plot 7 snags would cost £675.00 to put right.

## Snagging a new build home

If your builder is registered with the New Homes Quality Board, the New Homes Quality Code applies. It provides for a pre-completion inspection, with standard checklists for houses and apartments that the inspection must use, and you can bring a professional snagging inspector or do it yourself. The inspection doesn't delay completion, so write everything down then.

- Book the inspection as close to legal completion as you can, in daylight, with the services on.
- Go room by room, top to bottom, and test everything: doors, windows, locks, taps, toilets, showers, sockets, switches, heating, extractor fans, the loft hatch.
- Photograph each snag with its reference number and send the list to the builder in writing; keep a copy.
- The New Homes Ombudsman Service is open to buyers of homes from registered builders from reservation until two years after legal completion, once the builder has had the time the Code allows to resolve a complaint.
- Under NHBC's Buildmark, the builder is responsible for putting right defects reported in the first two years (the builder warranty period); report them in writing within that time.

> Warning: Items such as a socket loose in its back box, a window that won't lock, or a door that doesn't close are safety and security snags. Ask for them to be fixed before you move in, not at a later visit.

## How to fill in the snag list template

1. Fill in the development, plot or unit, the type of inspection, who inspected and the list's revision.
2. Walk in a fixed order (outside, then each floor from the front door), so the list follows the building.
3. For each snag write the room or area, the trade, the defect and what good looks like, so the trade knows when it is done.
4. Grade the severity: major for safety, security, water and anything that affects use; minor for finish and appearance.
5. Assign it to the trade or the site team with a target date.
6. Record the date it was cleared only once someone other than the trade has checked it.
7. Contractors: enter the cost to put right, your contract sum, retention percentage and the share released at practical completion.

## What to check: a room-by-room snagging checklist

| Area | Check |
| --- | --- |
| Outside | Brickwork and mortar, render, gutters and downpipes, roof tiles from the ground, paths and drives, fencing, turf, drainage covers |
| Doors and windows | Open, close and lock smoothly; seals complete; glass not scratched; trickle vents work; keys for every lock |
| Walls and ceilings | Cracks, nail pops, uneven plaster, paint runs and missed areas, in daylight |
| Floors and stairs | Level, no squeaks, flooring edges and thresholds finished, handrails and balustrades firm |
| Kitchen | Units aligned and doors level, worktop joints sealed, appliances working and fitted, taps and waste |
| Bathrooms | Sealant at bath, shower and basin, tiling and grout, toilets flush and fill, extractor fans, water pressure |
| Electrics and heating | Sockets and switches firm and working, lights, consumer unit labelled, boiler and radiators heat up, smoke alarms |
| Loft | Insulation laid evenly, hatch insulated and sealed, no daylight through the roof |

## Common snagging mistakes

- Snags described too vaguely ("paint in hall") for anyone to find or sign off.
- No photos, so the builder and buyer disagree later about what was there on the day.
- Signing off snags on the trade's word rather than checking them.
- Missing the end of the rectification period or the two-year builder warranty period, so later defects cost more to get fixed.
- Contractors applying for the retention without the schedule of defects closed out.

## Or close the snags before the retention falls due.

In Emplotec the site team works on mobile, offline, against the project and its subcontractors, so open snags are known before a retention release is asked for.

- Mobile checklists with packs for construction, offline on site.
- Subcontractor work orders and their bills, so each snag stays tied to the trade that owes it.
- Retention held on every contract, and open snags checked at handover before it is asked for.
- A daily progress report on mobile, offline, for every project.

Read more: [Emplotec Projects](https://www.emplotec.com/erp/projects.md)

## Questions and answers

### What is a snag list?

A list of defects and unfinished items found when new building work is inspected, each with its location, who will put it right and by when. It is used at handover and again before the end of the defects or rectification period.

### When should I do a snagging inspection on a new build?

Before legal completion if the builder allows a pre-completion inspection (builders under the New Homes Quality Code do), then again in the first months after moving in and before the two-year builder warranty period ends.

### How long does a builder have to fix snags?

On a build contract, the rectification or defects period in the contract sets it. For a new home with NHBC Buildmark, the builder is responsible for putting right defects reported in the first two years; the developer should give target dates for each snag.

### What is the rectification period in a JCT contract?

The period after practical completion during which the contractor must make good defects that appear. Its length is stated in the contract particulars, often 6 or 12 months; at the end, a schedule of defects is issued and, once they are made good, a certificate of making good.

### What is the difference between a snag list and a punch list?

Only the name: snag list in the UK, Ireland and much of the Commonwealth, punch list in the US and Canada.

### Do I need a professional snagging inspector?

No, buyers can do their own inspection with a good checklist. A professional inspector knows where defects hide (lofts, sealant, drainage) and their report carries more weight in a dispute.

## Sources

- [JCT: Joint Contracts Tribunal, standard building contracts](https://www.jctltd.co.uk/)
- [Designing Buildings: Rectification period](https://www.designingbuildings.co.uk/wiki/Rectification_period)
- [New Homes Quality Board: the New Homes Quality Code and pre-completion inspection checklists](https://www.nhqb.org.uk/the-code/)
- [NHBC: Buildmark, the first two years (builder warranty period)](https://www.nhbc.co.uk/homeowners/buildmark-cover/first-two-years)

## Related

- [/erp/projects](https://www.emplotec.com/erp/projects.md)
- [/templates/method-statement-template](https://www.emplotec.com/templates/method-statement-template.md)
- [/templates/risk-assessment-template](https://www.emplotec.com/templates/risk-assessment-template.md)
- [/industries/construction-and-epc](https://www.emplotec.com/industries/construction-and-epc.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/projects: https://www.emplotec.com/erp/projects.md
- /templates/method-statement-template: https://www.emplotec.com/templates/method-statement-template.md
- /templates/risk-assessment-template: https://www.emplotec.com/templates/risk-assessment-template.md