# Work order format for contractors, with GST, TDS and retention

> A work order tells a contractor what work to do, at what rates, by when, and on what payment, retention and safety terms. Fill in this format on the page, or download it.

Page: https://www.emplotec.com/templates/work-order-format · Updated: 2026-11-06

Market: India

- BOQ rates and amounts
- GST, TDS and retention worked out
- Excel with formulas
- Free, no sign-up

## Download

- Excel: https://www.emplotec.com/downloads/work-order-format.xlsx
- Word: https://www.emplotec.com/downloads/work-order-format.docx
- PDF (blank, A4): https://www.emplotec.com/downloads/work-order-format.pdf
- Fill it in online: https://www.emplotec.com/templates/work-order-format

## What the format contains

- Title: Work order (Subcontract for the work described below). Copy line: Original for contractor
- Issuer block: Name and address, Name and address, GSTIN, PAN
- Fields: Work order no., Date, Project, Site, Start date, Completion date, Defect liability period, Rate basis
- Contractor: Name, Address, GSTIN and PAN, Electrical licence
- Contacts and compliance: Our site in charge, Contractor's supervisor, PF and ESI codes, Workers on site (planned)
- Schedule of quantities and rates, columns: Sr., BOQ ref., Description of work, Unit, Qty, Rate, Amount. Totals row: Work order value (excl. GST)
- Value, tax and deductions: Work order value, from the schedule above, GST rate, %, GST, Total including GST, Retention, % of each bill, Retention held over the contract, TDS rate, % (Section 393(1); 2% for a firm), TDS over the contract, on value excluding GST, Paid to the contractor over the contract, before advances
- Terms: 1. Billing: monthly RA bills on joint measurement, certified by our site engineer within 10 days; paid within 30 days of certification. 2. Retention of 5% of each bill, half released on handover and half after the defect liability period. 3. Delay: liquidated damages of 0.5% of the work order value per week of delay, capped at 5%. 4. The contractor pays its workers' wages, PF and ESI on time and submits the challans with each bill; bills are held until they are in. 5. Safety: PPE, permit to work for live electrical work, and attendance at the site induction. 6. Extra items only on a written change order with an agreed rate. 7. Disputes: arbitration at Hyderabad.
- Signatures: Accepted by the contractor (sign and stamp), For Nallamala Infra Projects Pvt Ltd, authorised signatory

## What a work order is

A work order is a written instruction to a contractor to carry out defined work at agreed rates. In construction it is how a main contractor engages subcontractors (electrical, plumbing, waterproofing), and how a factory engages contractors for civil work, painting, fabrication or maintenance.

Where a purchase order buys goods, a work order buys work. That is why it carries things a PO doesn't: a scope, a schedule of quantities, measurement and RA billing, retention, a defect liability period, safety rules and the contractor's labour obligations. No law prescribes its format; once the contractor accepts it, it is the contract.

## What a work order format should contain

**Common practice for contractor work orders in India.**

| Section | What to write |
| --- | --- |
| Parties and numbers | Your name, GSTIN and PAN; the contractor's name, GSTIN, PAN, and licences; the work order number and date. |
| Project and site | Where the work is, and who is in charge on each side. |
| Scope | What is included and what isn't (who supplies material, water, power, scaffolding). |
| Schedule of quantities and rates | BOQ items with unit, quantity, rate and amount. Quantities are estimates; payment is on measured work. |
| Dates | Start, completion and milestones, and liquidated damages for delay. |
| Billing and payment | RA bills, measurement, certification, and the days to pay. |
| Retention and defect liability | The percentage held from each bill, when it is released, and the defect liability period. |
| Taxes and deductions | GST rate, TDS, and any cess or other deduction. |
| Labour, safety and compliance | Wages, PF, ESI and licences under the Labour Codes; PPE, permits and site rules. |
| Changes and disputes | How extra work is ordered and priced, and where disputes go. |

## GST on a work order

- Work that involves transferring property in goods and is for building, fitting out, repairing or commissioning immovable property is a 'works contract' under Section 2(119) of the CGST Act, and is taxed as a service.
- Most works contracts for private clients are at 18% GST. Some works for the government and other specified works carry different rates; check the current entry under heading 9954 before you fix the rate.
- Pure labour contracts and service contracts (housekeeping, security, maintenance) take the rate for that service.
- You can't take input tax credit on a works contract for building your own immovable property, other than plant and machinery (Section 17(5)(c)). A main contractor who supplies the works contract onward can.

## TDS on contractor payments under the Income-tax Act, 2025

From 1 April 2026, TDS on payments to contractors is under Section 393(1) of the Income-tax Act, 2025, which replaced Section 194C. The rates and limits carried over.

**Section 393(1), Table, serial 6(i), Income-tax Act, 2025 (formerly Section 194C).**

|  | Rule |
| --- | --- |
| Rate | 1% if the contractor is an individual or HUF; 2% for others (firms, companies, LLPs). |
| When it applies | A single payment above ₹30,000, or payments in the year above ₹1,00,000 in total. |
| Base | The amount excluding GST, where GST is shown separately on the bill. |
| No PAN | A higher rate applies, generally 20%. |

> Note: Government departments and some public bodies also deduct 2% TDS under GST (Section 51 of the CGST Act) from contractor payments above ₹2.5 lakh under one contract. Private companies don't.

## Retention, advances and the defect liability period

- Retention is a percentage, commonly 5% to 10%, held from each RA bill as security for completion and defects. Write the rate, any cap, and when it is released.
- A common pattern releases half on handover and half at the end of the defect liability period, or earlier against a bank guarantee.
- Mobilisation advances are recovered from the RA bills, usually in equal parts or as a percentage of each bill. Write how.
- In building work, the construction workers' welfare cess of 1% of the cost of construction is now levied under the Code on Social Security, 2020, which replaced the 1996 Cess Act from 21 November 2025. Who bears it should be stated in the work order.

## The contractor's workers: what the work order should require

Under the four Labour Codes, in force since 21 November 2025, the principal employer carries risk if a contractor doesn't pay its workers' wages, PF or ESI. A work order protects you by requiring:

- The contractor's PF and ESI registration numbers, and monthly challans and wage registers with each RA bill.
- A contractor's licence under the Occupational Safety, Health and Working Conditions Code where the work is in its scope.
- Wages paid by bank transfer, on time, and at least the minimum wage.
- Workers' attendance on your site register, so wages and headcount can be checked.

## How to fill in this format

1. Fill in your company, the contractor, the project, the site and the dates.
2. List the BOQ items with units, estimated quantities and agreed rates. The Excel version works out each amount and the work order value.
3. Enter the GST rate, retention percentage and TDS rate in the calculation block. It picks up the value from the schedule and shows the contract total, the retention held and the TDS over the contract.
4. Write the billing, retention, delay, labour and safety terms. Delete what doesn't apply, and add your own.
5. Sign it, and have the contractor sign and stamp the acceptance. Keep the signed copy with the contract file.

## Common mistakes in work orders

- A scope that says 'electrical works complete' with no BOQ, so every extra becomes a dispute.
- No rate for extra items, so the contractor prices them after doing them.
- Retention with no release terms, which leads to arguments at handover.
- TDS deducted on the amount including GST, when GST is shown separately.
- No requirement for PF and ESI challans, until an inspector asks the principal employer for them.

## Or issue the work order from the project's budget.

In Emplotec a subcontractor work order is raised against the project's cost codes, counts as a commitment the moment it is approved, and is billed through RA bills against its own rates.

- Commitments from orders and subcontracts sit beside the budget, so you see what is left before you award.
- Subcontractor work orders carry their RA bills, measured against the BOQ, with retention and advances tracked.
- Change orders are approved before they count, so extra items never slip into a bill unpriced.
- With Compliance, contractors upload PF and ESI challans on the vendor portal, and their bill is held until they're in.

Read more: [Emplotec Projects](https://www.emplotec.com/erp/projects.md)

## Questions and answers

### What is the difference between a work order and a purchase order?

A purchase order buys goods; a work order engages a contractor to do work. A work order carries scope, measurement, RA billing, retention, defect liability and labour terms that a PO doesn't.

### What is the TDS rate on a work order payment?

1% if the contractor is an individual or HUF and 2% otherwise, under Section 393(1) of the Income-tax Act, 2025 (formerly Section 194C), once a single payment exceeds ₹30,000 or the year's payments exceed ₹1,00,000.

### What is the GST rate on a works contract?

Most works contracts for private clients are taxed at 18%. Some government and specified works have different rates, so check the current entry for your work under heading 9954.

### How much retention is held under a work order?

There is no legal rate. Five to 10% of each bill is common, often capped at 5% of the contract value, and released partly at handover and the rest after the defect liability period.

### Is TDS deducted on the GST part of a contractor's bill?

No, where GST is shown separately on the bill, TDS is deducted on the amount excluding GST.

### Is a work order a legal contract?

Yes, once the contractor accepts it, usually by signing it. Stamp duty on contracts varies by state, so check your state's stamp law for large work orders.

## Sources

- [CGST Act, 2017: Sections 2(119), 17(5)(c) and 51, CBIC tax information portal](https://taxinformation.cbic.gov.in/)
- [Income-tax Act, 2025: Section 393 (TDS), Income Tax Department](https://www.incometaxindia.gov.in/)
- [The Code on Social Security, 2020: Chapter VIII (building workers' welfare cess), Ministry of Labour and Employment](https://labour.gov.in/)
- [GST rates for services from 22 September 2025, CBIC](https://cbic-gst.gov.in/gst-goods-services-rates.html)

## Related

- [/erp/projects](https://www.emplotec.com/erp/projects.md)
- [/templates/boq-format](https://www.emplotec.com/templates/boq-format.md)
- [/templates/ra-bill-format](https://www.emplotec.com/templates/ra-bill-format.md)
- [/guides/retention-money](https://www.emplotec.com/guides/retention-money.md)

---

- Talk to us: https://www.emplotec.com/contact (we call back within one working day)
- Email: preethan@emplotec.com · Phone and WhatsApp: +91 93420 95081
- Evaluating an ERP? Read the brief: https://www.emplotec.com/erp/brief.md
- Every page as Markdown: https://www.emplotec.com/llms.txt
- All templates: https://www.emplotec.com/templates.md
- /erp/projects: https://www.emplotec.com/erp/projects.md
- /templates/boq-format: https://www.emplotec.com/templates/boq-format.md
- /templates/ra-bill-format: https://www.emplotec.com/templates/ra-bill-format.md
