ERP software in BengaluruERP for Bengaluru's machine tool builders and precision shops.

A Peenya shop cuts a bracket to a drawing the customer changed on Thursday, checks it with a gauge two days past calibration, and prices the next special purpose machine from memory of the last one. Emplotec puts the drawing register, the gauges, the first-off checks and each machine's cost in one system, so the shop finds out before the lot is made.

  • Built forMachine tool builders and precision shops
  • EstatesPeenya, Bommasandra and Abbigere
  • Going liveLive in 30 days, data moved in 48 hours

Arkavati Precision machines parts for aerospace suppliers and machine tool builders in Peenya, and builds special purpose machines at a second unit in Bommasandra. Divya in quality sees every first-off check and gauge across both units on one page, with a drawing revision Emplotec caught before the next shift. Example companies, people and figures.

Where Bengaluru builds machines, and the parts inside them.

Invest Karnataka's sector profile traces the city's machine tool industry back to Hindustan Machine Tools, set up here in 1953, and finds most of it today in three industrial estates.

  • Peenya

    In the north-west of the city, and home to the largest share of Bengaluru's machine tool units in that profile. CNC and special purpose machine builders work beside the heat treaters, accessory makers and component shops that supply them, so a part can pass through more than one unit before it is finished.

  • Bommasandra

    Off Hosur Road on the city's south-eastern edge, second to Peenya in the profile's count. Its units build machines and machine parts for the automobile and aerospace industries and for other machine builders.

  • Abbigere

    A smaller estate in the north, near Peenya, and the third the profile names for machine tools: a short drive for the tool rooms and accessory makers that serve the bigger builders.

  • Aerospace and defence sub-contractors

    Invest Karnataka counts more than 2,000 small and medium firms in the state able to take niche sub-contracting work for aerospace and defence. For a precision shop, that work comes with drawings under revision, material certificates and inspection records the customer will ask to see.

Who we talk to in Bengaluru.

Engineering companies where the work is made to a drawing, and the knowledge of what a job really cost sits with two or three people.

  • Machine tool and SPM builders

    Companies building CNC and special purpose machines to a customer's order, where each machine runs for months with its own BOM, bought-out controls and an advance to recover.

  • Precision job shops in Peenya

    Owner-run shops machining to customers' drawings for aerospace suppliers, machine builders and others, where a missed revision or a gauge past its date can scrap a whole lot.

  • Panel and assembly makers

    Electrical and electronics firms wiring control panels and building assemblies for the machine builders, who need serials, BOM revisions and component lots traced.

  • Groups with a second unit across the city

    A Peenya company that has opened a unit in Bommasandra or Abbigere, and now keeps two stores, two shop floors and two sets of gauges with one accounts team.

The work Emplotec runs for a Bengaluru machine shop.

Each of these depends on a drawing, a measurement or a cost that usually lives in one person's file, which is where a growing shop starts to lose money.

  1. A special purpose machine, quoted from the last three

    When an enquiry comes in for a machine like ones you have built, Emplotec finds the similar past drawings and shows what those jobs actually cost in material, labour and machine time. The costing sheet starts from there, the proforma takes the advance, and the promise date is checked against capacity before anyone commits to it.

  2. One machine, four months, one cost

    Each machine gets a multi-level BOM with versions, a project for its milestones and work orders for each assembly. Bought-out controls, ball screws and motors are reserved against it, the job cost compares planned and actual as the build goes, and work in progress is valued at month end. Milestones release the bills, and the advance is recovered from them.

  3. Revision D reaches the machine, not just the inbox

    The drawing register holds every revision, and an engineering change note moves the floor to the new one. Setup sheets, tool lists and CNC programs are versioned documents tied to the operation, and an operator's certification is checked before the job card starts.

  4. Bar stock by heat, parts by first-off

    Incoming bar and plate are held in QC until the test certificate is checked against the heat number, and the heat follows the part forward to the customer and back to the supplier. First-off and final inspections run on mobile against the inspection plan, and a gauge past its calibration date can't be used for any of them.

  5. A rejected lot, traced and closed

    A rejection opens an NCR with the lot, the machine and the operator on it. CAPA records the root cause and an effectiveness check, the cost of poor quality is counted, and a supplier's fault goes back to them as a corrective-action request on the vendor portal.

  6. Two units, one Karnataka payroll

    Shifts and biometric attendance from Peenya and Bommasandra feed one payroll that computes PF, ESI, Professional Tax and LWF by state, with contract workers' attendance and wages alongside. Each unit keeps its own stores and shop floor, and both post to the same ledger.

Karnataka's payroll rules, and the state's own picture of the cluster.

Two state levies reach every Bengaluru payroll, and the state's investment agency has written down what the city's machine tool and aerospace suppliers make.

  • Professional tax in Karnataka

    Professional tax is deducted from an employee's gross salary by the employer, who pays it to the state and is responsible for obtaining the professional tax registration certificate. The Commercial Taxes Department runs the portal. Emplotec payroll computes Professional Tax by state for each unit.

    Source: Professional Tax portal, Commercial Taxes Department, Karnataka, checked 7 November 2026.

  • A second unit counts on its own

    The schedule on the portal makes salary and wage earners paid ₹25,000 or more a month liable, and charges companies ₹2,500 a year. Each additional place of business is treated as a separate person for the tax unless it is used only as a godown, so a Peenya company opening a Bommasandra unit should check that unit's own liability.

    Source: Professional tax schedule, Commercial Taxes Department, Karnataka, checked 7 November 2026.

  • The Karnataka Labour Welfare Fund

    From the 2025 calendar year the contribution is ₹50 from each worker and ₹100 from the employer, ₹150 in all, after an amendment to the Karnataka Labour Welfare Fund Act, 1965 notified on 10 January 2025. Factories under the Factories Act are among the establishments that pay it online between 1 and 15 January each year, and the Board set 15 January 2026 as the last date for 2025. Emplotec payroll computes LWF with the other state deductions.

    Source: Karnataka Labour Welfare Board, press note of 5 December 2025, checked 7 November 2026.

  • Bengaluru's machine tool cluster

    Invest Karnataka's machine tools sector profile puts Karnataka's share of India's machine tool production at 52% in 2018-19, on IMTMA figures, and credits Bengaluru alone with 60% by value. It places most of the city's machine tool industry in the Peenya industrial estate, followed by Bommasandra and Abbigere.

    Source: Invest Karnataka, machine tools sector profile, checked 7 November 2026.

  • The state's aerospace supplier base

    Invest Karnataka states that a quarter of India's aircraft and spacecraft industry is in Karnataka, along with 70% of the supplier base for India's aerospace and defence, and more than 2,000 small and medium firms able to take niche sub-contracting work.

    Source: Invest Karnataka, aerospace and defence, checked 7 November 2026.

The full list of what’s built in for India, from tax to payroll, is on ERP in India.

Working with us from Bengaluru.

We are a Chennai company and have no office in Bengaluru. This is how a project with a Bengaluru shop runs.

  • A free audit of one job, end to end

    In one remote working session we follow a recent job with your team, from the enquiry and the drawing to the gauges, the stores and the bill. A written summary of a few pages follows within five working days. It is free, and yours to keep whether or not you work with us.

  • Remote, on the same clock

    Bengaluru and Chennai share India Standard Time, so calls fit around your shifts. Implementation is remote unless the proposal says otherwise.

  • Your drawings and gauges first

    The drawing register, gauge register and open jobs are usually what a machine shop moves first, so the floor works from Emplotec before the accounts do. The proposal names what goes first.

  • Live in 30 days, quoted by phase

    Data moved in 48 hours and live in 30 days, with the proposal saying what live covers, for example the Peenya unit's jobs and stores before the Bommasandra build shop. After the audit, each phase is quoted as a fixed fee and paid phase by phase.

How digital transformation works

Software development in Bengaluru

Questions buyers in Bengaluru ask

Do you have an office in Bengaluru?

No. Emplotec is based in Madipakkam, Chennai, and works with Bengaluru companies remotely. The free audit is a video session, and any visit to your unit is agreed in the proposal first.

Can it run our Peenya unit and our Bommasandra unit together?

Yes. Each unit has its own stores, shop floor and schedule, stock moves between them on a transfer, and both post to one set of books. If the units are separate companies, each keeps its own books and the group consolidates.

Can we quote a new machine from the ones we have already built?

Yes. Manufacturing finds similar past drawings and shows what those jobs actually cost, and the costing sheet builds the quote from there. A person sets the price and sends the quote.

What happens when a gauge is overdue for calibration?

Quality blocks it from inspections until it is recalibrated, so no first-off check can be passed with it. The gauge register shows what falls due in the coming weeks, so recalibration can be planned.

Does payroll handle Karnataka professional tax and the Labour Welfare Fund?

Yes. HRMS computes Professional Tax and LWF by state, with PF and ESI, and keeps the registers. A person pays each one and files each return; the agent never does either on its own.

Tell us about one job, from drawing to dispatch.

We'll call within one working day and walk through a recent job with you, its revisions, gauges and costs, before we show you Emplotec on it.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what live covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp