Emplotec Planning

Plan on the records you run on.

FP&A software for groups: budgets, forecasts and scenarios built from your people, contracts, projects and ledger, so the plan ties to the books without a single export.

Group P&LFY 2026-27Nordwerk group · 4 entities · actuals to 31 Oct · ₹ CrRF3 draft · for approval
VersionsBudget28 MarRF214 AugRF3Kolkata · settlementExcel
Line₹ CrApr–OctActualNovRFDecRFJanRFFebRFMarRFFY 27RF3BudgetFY 27VarRF − Bud
Machined parts, Chennai186.227.428.128.627.930.8329.0335.0(6.0)
Castings, Hosur74.210.911.211.411.012.1130.8132.0(1.2)
Trading, Dubai44.86.56.87.06.67.479.180.0(0.9)
Precision, Kolkata––5.86.16.06.624.5–24.5
Intercompany(30.1)(4.4)(4.5)(4.6)(4.4)(4.9)(52.9)(53.5)0.6
Revenue275.140.447.448.547.152.0510.5493.517.0
Material cost142.121.225.325.825.127.7267.2252.015.2
Contribution133.019.222.122.722.024.3243.3241.51.8
Salaries and wages41.26.06.97.37.37.476.172.04.1
PF, ESI, bonus, gratuity6.10.91.01.11.11.111.310.60.7
People cost47.36.97.98.48.48.587.482.64.8
Power and fuel21.43.13.63.73.63.939.337.51.8
Other operating cost26.83.94.34.34.24.648.147.01.1
EBITDA37.55.36.36.35.87.368.574.4(5.9)
EBITDA margin13.6%13.1%13.3%13.0%12.3%14.0%13.4%15.1%−1.7
Revenue, FY510.5EBITDA, FY68.5Budget EBITDA74.4CompareSubmit RF3

The Nordwerk group's P&L for the year, laid out like its own budget workbook: actuals to October, the forecast by month, and the year beside the budget. The CFO asks Emplotec to add the Kolkata acquisition and the shop-floor wage settlement. It builds both as a plan; once she approves, the engine recomputes every line, and the new reforecast goes for approval. Example companies, people and figures.

FP&A software that plans on the same records as the books.

Emplotec Planning is FP&A software inside the Emplotec ERP: budgets, forecasts and scenarios built from the same people, contracts and ledger the business runs on. The agent proposes drivers and explains variances, the engine computes every figure, and people approve.

Budgets, reforecasts and rolling forecasts

Every version is kept, and a new one starts from any other.

  • Annual budget and quarterly or monthly reforecasts
  • Rolling forecasts 12 to 24 months ahead
  • Long-range plans for 3 to 5 years
  • Any number of scenarios
  • Top-down targets against bottom-up builds

Drivers, laid out like your own workbook

Driver-based where the business has drivers, direct entry where it doesn't, and trend from actuals where neither fits.

  • Units × price, heads × cost, sites × contract rate, area × rent
  • Seasonality from last year or a chosen profile
  • Your blocks, subtotals and order
  • The working of any figure one click away
  • Excel download and upload

People cost from the payroll engine

Headcount and employer cost come from HRMS and its payroll and statutory engines, not a percentage on last year.

  • Today's people from HRMS, by grade and site
  • Joiners, leavers and open positions by month
  • Increments, promotions and arrears
  • PF, ESI, bonus and gratuity on the Labour Codes
  • Every default overridable, with the law's figure shown

P&L, balance sheet and cash flow

Three statements from one model, so the balance sheet and cash follow the P&L.

  • Working capital from days or open items
  • Capex with depreciation from Books
  • Loans with repayments and interest
  • Revenue from pipeline, contracts and milestones
  • Plan rates and currency scenarios

Group planning across entities

Entities, cost centres and products roll up the way the group reports, in every currency.

  • Alternate roll-ups by country, segment or business
  • Intercompany plans entered once and mirrored
  • Eliminated through Books' consolidation engine
  • Allocations by headcount, area, revenue or a key
  • Acquisitions inside a version

Submissions, approvals and locks

A planning cycle with tasks and forms for each entity and cost centre, and a full history of who changed what.

  • Tasks, submissions and returns with comments
  • Approvals by level
  • Comments and files on any cell
  • A lock on the approved version
  • The approved version becomes the control budget

Variance, the board and the bank

Actual against budget, forecast and last year down to the documents, with the board's and the bank's formats ready.

  • Budget, forecast and last year
  • Drill to the documents
  • Commentary drafted, accepted by a person
  • Plan columns in the MIS and board pack
  • Schedule III layouts and CMA data
  • KPIs with their formulas shown

Budgeting and forecasting software laid out like your own workbook.

Each entity and cost centre budgets in a sheet with your blocks, your subtotals and your order. Drivers such as tonnes and price fill the lines, the working of every figure is one click away, and the agent proposes drivers and seasonality from your actuals, with the method shown, for the owner to apply.

  • Driver-based, direct entry or trend from actuals
  • Spread evenly, by days, by a driver or by season
  • Rolling forecasts with closed months replaced by actuals
  • Excel download and upload, in the same layout
Hosur foundryBUD-28 v2Nordwerk Castings Pvt Ltd · Budget FY 2027-28 · ₹ lakhDraft · due 28 Nov
LayoutYour FY 27 workbookSpreadBy seasonExcelUpload
Line₹ lakhQ1BudgetQ2BudgetQ3BudgetQ4BudgetFY 28BudgetFY 27RF3vs 27%
Tonnes poured t3,7203,8403,9604,08015,60014,8804.8%
Realisation ₹/kg118118121121119.61163.1%
Revenue4,3904,5314,7924,93718,65017,2618.0%
Metal and alloys2,1582,2272,2972,3669,0488,3338.6%
Power1942002062128127626.6%
Moulding, consumables697173752882687.5%
Wages and employer cost3213323433541,3501,2488.2%
Repairs and other9698981043963726.5%
Plant contribution1,5521,6031,7751,8266,7566,2787.6%
Revenue · Q3Driver-based3,960t×₹121a kg=4,792FromFurnace planPL-28 from 1 OctWages fromPeople plan · 358 heads
Seasonality from 3 years of actualsQ123.8%Q224.6%Q325.4%Q426.2%Applied by Arun Pillai

Scenario planning: every what-if, side by side.

A scenario changes only what it lists, such as a currency rate or a plant's start date, and the engine recomputes the P&L, cash and ratios. Scenarios sit side by side against the budget, and the agent says which covenant or target a scenario breaks, citing the loan it read.

  • Any number of scenarios on any version
  • Currency scenarios that move only the rates
  • Cash, net debt and covenant ratios for each
  • Every assumption listed, nothing hidden in a cell
ScenariosFY 2027-28Nordwerk group · against Budget FY 28 v3 · ₹ Cr4 versions
ScenarioChanges only what it listsBudget FY 28 v3BaseINR −5% vs USDUSD/INR 88.0 → 92.4 from AprPlant 2 in JanuaryStart Oct 2027 → Jan 2028BothBuilt by Emplotec
Revenue612.0618.4+6.4581.7−30.3587.8−24.2
EBITDA86.484.9−1.579.0−7.477.6−8.8
EBITDA margin14.1%13.7%13.6%13.2%
Cash at 31 Mar25.022.720.217.6
Net debt140.0145.6151.7158.3
Net debt / EBITDA covenant 2.001.621.711.922.04
Current ratio1.411.391.361.34
Both together breach the term loan covenantDrafted by Emplotec

A weaker rupee raises the dollar loan and imported alloy costs; a late plant loses three months of Hosur’s new line. Together they take net debt to 2.04 times EBITDA, over the 2.00 in TL-2291 with HDFC.

TL-2291ECB-0042CAPEX-28-01Try a later dividendSaved by Meera Iyer

Workforce planning with the real payroll engine.

The headcount plan starts from today's people in HRMS: grades, pay structures and sites, then joiners, leavers and open positions month by month. Employer cost is worked out by the same engines that run payroll, so PF, ESI, bonus and gratuity in the budget are what you will actually pay.

  • Headcount by grade, site and month
  • Increments with an effective month, and arrears
  • PF, ESI, bonus and gratuity on the Labour Codes
  • Approved open positions raise requisitions in HRMS
People planHosurNordwerk Castings · FY 2027-28 · from HRMS, 24 NovPayroll engine · Labour Codes
Grade1 AprJoinLeave31 MarCost/monthFY, ₹ lakh
OperatorsW1184+12−6190₹23,440526.0
Skilled tradesW296+6−498₹31,850370.7
SupervisorsS122+2024₹52,600145.2
EngineersE118+3−120₹78,900179.9
Office staffM126+1−126₹41,200128.5
Hosur foundry346+24−123581,350.3
Operators, W1 · a month per headComputed by the payroll engineGross payBasic and DA ₹10,400, over half of pay₹19,800PF, employer 12%₹1,248ESI, employer 3.25%₹644
Bonus at 12%, company policyLaw’s figure: ₹866 at 8.33%₹1,248
Gratuity, 15 days a year₹500Employer cost₹23,440
Operators by month12 joiners, 6 leavers, 2 open positions
2 open positions approved in the planREQ-0481, REQ-0482 in HRMS

P&L, balance sheet and cash flow that tie, from one model.

The plan is not just a P&L. Working capital, capex and its depreciation from Books, loans, tax and dividends flow through the same model, so the projected balance sheet balances and the closing cash is the cash on it, year after year.

  • Capex by project, with depreciation from Books
  • Approved capex becomes purchase requests when due
  • Revenue from pipeline, contracts and project milestones
  • Acquisitions from a month, inside the version
StatementsRF3 · Budget FY 28Nordwerk group · one model · ₹ CrAll three tie
Profit and lossRF3 · Budget
FY 27FY 28
Revenue510.5612.0
EBITDA68.586.4
Depreciation · Books(18.4)(24.8)
Interest(9.6)(12.4)
Tax(10.0)(12.4)
Profit after tax30.536.8
Balance sheet31 Mar
FY 27FY 28
Fixed assets · net223.6256.8
Working capital112.4127.0
Cash and bank16.525.0
Capital employed352.5408.8
Equity214.5243.8
Borrowings138.0165.0
Funds employed352.5408.8
Cash flowRF3 · Budget
FY 27FY 28
EBITDA68.586.4
Tax paid(10.0)(12.4)
Working capital · days(8.4)(14.6)
Interest(9.6)(12.4)
Capex(46.0)(58.0)
Kolkata acquisition(22.0)–
Loans drawn40.045.0
Loans repaid(14.0)(18.0)
Dividend(6.0)(7.5)
Net change(7.5)8.5
Opening cash24.016.5
Closing cash16.525.0
Balance sheet balances, both yearsClosing cash = cash and bank

Variance analysis with commentary drafted from the documents.

Actuals come from Books as they post, against budget, the last forecast and last year, by any dimension. Emplotec drills each variance to the documents behind it and drafts the commentary; the cost centre's owner accepts or edits it before it goes into the MIS and the board pack.

  • Drill from any variance to the documents
  • Commentary assigned to the owner
  • Accepted by a person, never sent on its own
  • Plan and forecast columns in Analytics' MIS
VarianceApr–OctGroup cost centres · actual against Budget FY 27 · ₹ lakhBudgetRF2Last year
Cost centreBudgetActualVar%Commentary
Warehouse and logisticsDubai · Rahul Bose412.0461.4+49.412.0Accepted
Second warehouse lease from 1 AugLSE-0412+28.6End-of-service for 2 leaversFS-0193 · FS-0201+12.4Forwarder's new rate, up 9%RC-118+8.4
Machining shopChennai · Ravi Menon1,846.01,902.6+56.63.1With Ravi
Power and fuelHosur · Arun Pillai1,264.01,231.8−32.22.5Accepted
Freight outwardGroup · Priya618.0671.5+53.58.7With Priya
Sales and marketingChennai · Priya388.0352.4−35.69.2Accepted
5 cost centres4,528.04,619.7+91.72.0
Commentary · Dubai warehouse and logisticsDrafted by Emplotec from the documents

49.4 (12.0%) over budget to October. The second warehouse lease from 1 August adds 28.6, end-of-service for two leavers 12.4, and the forwarder’s new rate 8.4. The lease runs to 2029, so RF3 carries it.

LSE-0412FS-0193FS-0201RC-118RBAccepted by Rahul Bose

CMA data for bank loans, in your bank's own template.

Two years' actuals from Books and three years' projections from the approved plan, in the forms banks ask for: the operating statement, balance sheet analysis, current assets, MPBF, fund flow and ratios. Banks vary the layout, so the pack follows each bank's template, and a CA certifies it where the bank asks.

  • Forms II to VI and the ratios, from one model
  • MPBF by the bank's method of lending
  • Each bank's own template
  • Schedule III statements for the board
CMA dataCMA-28-01Nordwerk Castings Pvt Ltd · HDFC Bank template · ₹ lakhSent to the CA
Form V · second method31 MarchFY 25AuditedFY 26AuditedFY 27EstimatedFY 28ProjectedFY 29Projected
1Total current assets4,820.005,360.006,140.006,980.007,620.00
2Other current liabilities1,960.002,180.002,450.002,790.003,040.00
3Working capital gap2,860.003,180.003,690.004,190.004,580.00
4Margin, 25% of current assets1,205.001,340.001,535.001,745.001,905.00
5Actual net working capital1,420.001,610.001,880.002,150.002,410.00
6Item 3 less item 41,655.001,840.002,155.002,445.002,675.00
7Item 3 less item 51,440.001,570.001,810.002,040.002,170.00
8MPBF, lower of 6 and 71,440.001,570.001,810.002,040.002,170.00
9Bank finance sought1,400.001,550.001,800.002,000.002,150.00
Current ratio, FY 281.46Bank asks 1.33TOL / TNW, FY 281.84Average DSCR2.12Sought within MPBF5 of 5
Projections from Budget FY 28 v3Built by Emplotec

FY 28 and FY 29 come from the approved budget for Nordwerk Castings, the estimate for FY 27 from RF3 and Books. The forms follow HDFC Bank’s own template; a CA certifies them before they go to the bank.

Bank’s ExcelSent by Meera Iyer

Planned on the rules where you employ and borrow.

Employer cost in the plan follows the country's payroll rules, and the board's and the bank's formats follow the country's practice.

PF, ESI and gratuity in the plan, CMA data for the bank.

People cost carries PF, ESI, bonus and gratuity on the Labour Codes from the HRMS payroll engine. Statements come in Schedule III layouts, and CMA data follows each bank's template.

  • PF, ESI, bonus and gratuity on the Labour Codes
  • Schedule III layouts
  • CMA data in each bank's template
  • Lakh and crore, as your MIS shows them
ERP in India
  1. 1

    Wage revision recomputed with PF, ESI and gratuity

    RF3 · FY 27
    Drafted
  2. 2

    Budget approved and published as the control budget

    BUD-28
    Approved
  3. 3

    Schedule III statements for the board

    Board pack · FY 28
    Ready
  4. 4

    CMA data in the bank's template, for the CA

    CMA-28-01
    Sent

Ask it to reforecast. Check every number.

Ask in plain words. Emplotec reads the actuals, the people, the contracts and the pipeline, proposes the drivers and explains what moved. The engine computes every figure, and a person approves and publishes each version.

  • “Reforecast the year with the Kolkata acquisition from December and the April wage revision.”

    It builds the new version as a plan, recomputes wages, PF, ESI, gratuity and arrears through the payroll engine, and explains what moved EBITDA. A person approves the version.

  • “Why is Dubai 12% over its opex budget this year?”

    It drills to the documents behind the variance, finds the causes and drafts the commentary for the cost centre's owner to accept.

  • “What happens to cash and our CMA ratios if the rupee falls 5% and the new plant starts in January?”

    It builds the scenario from the stated changes, lists each assumption and shows the difference against the budget, line by line.

  • “Suggest drivers and seasonality for the foundry's budget.”

    It proposes drivers and a seasonal spread from the years of actuals, with the method shown, for the owner to apply or change.

Only on Emplotec

EmplotecAsk anything about the business
Meera Iyer, Group CFO

If the shop floor at Hosur gets a 9% revision from January, which customers' castings lose margin, and which contracts let us pass it on?

ReadPay structuresPayroll engineContractsRate contractsJob costs
  • Employer cost up ₹6,43,000 a month, statutory cost included
  • Pump housings for 2 customers fall below 18% margin
  • 3 contracts carry a labour escalation clause from April

The revision adds ₹6,43,000 a month to Hosur's cost, statutory cost included. Three customer contracts let us pass it on from April; two don't, and their pump housings fall below the 18% margin floor. I've added both to the reforecast as a scenario for you to review.

Open scenarioWaiting for your OK

A planning tool sees the budget. Emplotec also holds the payroll engine and the customer contracts with their clauses, so it can answer both halves.

From a wage settlement to the board pack.

The shop-floor wage settlement is recorded in HRMS. The reforecast picks up the new pay, the payroll engine works out the employer cost, the CFO approves the version, and it becomes the control budget that the board pack shows beside the actuals.

  1. HRMS

    Shop-floor wage settlement recorded, 9% from January

    WS-2027-01Recorded
  2. Planning

    Reforecast recomputes wages, PF, ESI and gratuity

    RF3 · FY 27Drafted
  3. Planning

    The CFO approves and publishes the version

    RF3 · FY 27Approved
  4. Books

    RF3 becomes the control budget for spend

    BUD-RF3Published
  5. Analytics

    The board pack shows budget, RF3 and actual

    MIS · NovUpdated

Works with the rest of Emplotec

Deep enough for the group's whole plan.

The parts a budget workbook leaves to one person's memory are built in, from the driver behind a cell to the bank's forms.

  • Versions side by side

    Budget, every reforecast and any scenario are kept, compared column by column, and a new one starts from any other.

  • Entities and roll-ups

    Entity, cost-centre and product hierarchies with alternate roll-ups, intercompany plans mirrored, and eliminations through Books' consolidation engine.

  • Employer cost from payroll

    Headcount and pay come from HRMS, and employer cost from its payroll and statutory engines, with every default overridable.

  • Statements that tie

    The P&L, balance sheet and cash flow come from one model, with depreciation from Books, so the balance sheet balances in every year.

  • CMA data in the bank's template

    Forms II to VI and the ratios from the approved plan, laid out in each bank's own template, certified by a CA where the bank asks.

  • Approvals and locks

    Submissions, returns and approvals by level, a lock on the approved version, and a reason recorded for any change after it.

Shaped around your own budget sheets.

Our team sets Planning up with your finance team when you start, from your current workbook, and Emplotec changes it on request once an admin approves.

  • The plan's chart and dimensions
  • Version names and the planning calendar
  • Sheet layouts and subtotals
  • Drivers and their formulas
  • Approval levels
  • Allocation keys
  • KPIs and their formulas
  • The bank's projection template
  • The board pack's order

Move from linked Excel workbooks.

Your current budget workbook is the starting point: its layout, its drivers and its subtotals become the sheets in Planning, and last year's actuals are already in Books. Entity and cost-centre owners keep working in a familiar grid, with Excel download and upload in the same layout.

  1. We map your workbook's blocks, drivers and subtotals with your finance team.
  2. Last year's actuals and this year's budget brought in, after a dry run you check.
  3. Entities, cost centres and roll-ups set up the way the group reports.
  4. Approval levels and the planning calendar agreed before the first cycle.

Planning: questions buyers ask

What is FP&A software?

Software for budgets, forecasts, scenarios and variance analysis. In Emplotec it is Planning, built on the same records as the books, payroll and contracts, so the plan ties to the books without exports.

What is the difference between budgeting and forecasting?

The budget is the approved annual plan. Forecasts, quarterly, monthly or rolling 12 to 24 months ahead, replace closed months with actuals and re-plan the rest. Planning keeps every version, so each can be compared with the others.

What is a rolling forecast?

A forecast that always looks 12 to 24 months ahead; each month that closes is replaced by its actuals from Books, and a new month is added at the end.

What is driver-based planning?

Plans built from drivers such as units × price, heads × cost, sites × contract rate or area × rent. Where there is no driver, a line is entered directly or trended from actuals. The working of every figure is one click away.

What is CMA data for a bank loan?

Two years' actuals and three years' projections in the forms banks ask for: the operating statement, balance sheet analysis, current assets, MPBF, fund flow and ratios. Each bank sets its own template; Planning follows it, and a CA certifies the data where the bank asks.

Can it plan salary cost with PF, ESI and gratuity?

Yes. Employer cost comes from the HRMS payroll and statutory engines: PF, ESI, bonus and gratuity in India, and end-of-service gratuity in the Gulf. Every default can be overridden per grade, contract or person, with the law's figure shown beside the planned one.

Does the plan produce a balance sheet and cash flow, not just a P&L?

Yes. The P&L, balance sheet and cash flow come from one model, with working capital, capex and depreciation from Books, loans, tax and dividends.

Can a group plan across companies and currencies?

Yes. Entity hierarchies with alternate roll-ups, intercompany plans mirrored and eliminated through Books' consolidation engine, plan rates for each version and currency scenarios.

Does the AI set the budget?

No. The agent proposes versions and drivers and drafts variance commentary; the engine computes every figure; a person approves and publishes each version.

Can we keep working in Excel?

Yes, through download and upload. Each sheet downloads to Excel in the same layout and uploads back into the version, with every change recorded.

How is Emplotec Planning priced?

Planning is licensed with Books. Planners and finance use full seats; cost-centre owners who submit, and approvers, use team seats; board members and lenders who only read are free. We quote once we've seen your entities and your planning cycle. Talk to us.

See Planning on your own numbers.

Tell us how your business runs, and we’ll show you Emplotec Planning working the way you do.

  • A call within one working dayFrom the people who build it, not a sales team.
  • Your data moved in 48 hoursLive in 30 days. Your proposal says what “live” covers.
  • Cloud or your own serversThe same build either way, with your own database.