ERP for MEP and specialty contractorsKnow every job's margin before the last bill. Get every bill passed the first time.
Forty jobs at once, each with its own quotation, order, store, challans, bills and cash. Emplotec keeps each one as a single record from the first quotation to the last receipt, with job costing on every line, and an agent that finds the stuck bill and the job losing money.
- Runs onProjects · Billing · CRM & Sales · Procurement · Inventory · Books · HRMS · Expense · Field Service · Planning
- Fitted to youYour fields, rules, documents and screens
- Going liveData moved in 48 hours, live in 30 days
This is the app. Click any page on the left, and ask Emplotec on each one.
- Rahul Bose raised a query on invoice 0231: signed DC-3112-019 missing
- Karthik filed the Meridian site diary: 26 workers, 140 m of duct
- Arun Pillai received 4 drums from Sundar Cables against PO 0612
- Emplotec held Annai Labour Contractors' bill: October ESI challan missing
In this example, Veloran MEP Services runs 38 jobs from Coimbatore on Emplotec. One job is losing margin on cable, a hospital invoice is stuck in bill passing for a missing challan, and a labour contractor's bill is held for ESI. Click through the jobs, quotations, challans, stores, bills, bill passing and cash. Example companies, people and figures.
From the quotation to the last receipt.
One job at Aster Textiles, followed through Veloran's office, stores, site and accounts.
The estimation desk
Meera prices the quotation line by line from last month's cable and switchgear rates.
Rev 3 at ₹1.86 Cr, 15% margin
The project office
Aster's order opens job J-3108 with a budget by material, labour, subcontract and expenses.
₹1.58 Cr budget on 46 lines
The main store
Cable drums are received against the PO and sent to the site store on a challan with the e-way bill.
4 drums, 2,000 m of 3.5C × 300
The site
Karthik files the day's progress offline and Murugan Erectors' cable laying is measured against the work order.
2,140 m laid, 2,380 m claimed
Aster's project office
RA-04 is certified on the portal, and the cut line stays visible against what was claimed.
₹34.9 L certified of ₹38.2 L
Aster's accounts
The invoice goes through bill passing with every document their checklist asks for.
Passed in 6 days
Veloran's accounts
Aster pays net of TDS and retention, and the job's margin updates the same day.
₹1,74,500 retention tracked
Does your month look like this?
These are the moments a trade contractor starts looking for an ERP. Each one is a gap between the quotation, the site, the bill and the accounts.
You find a job's margin at the final bill, when it's too late to do anything.
Tally and job sheetsJob costing on every line: budget from the quotation's costing, then POs, store issues, subcontractor bills, payroll and site cash as they happen, with a forecast to finish.
The order came on a phone call, the challan never reached accounts, and the invoice went late.
Excel and WhatsAppQuotation, order, challan, proforma and invoice are one chain on the job. Every challan carries the order's line numbers, and an accepted challan is ready to bill.
A bill sits in the client's bill passing for a month over one missing document.
Phone follow-upsEach invoice shows where it is at the client: submitted, query, resubmitted, passed or short-passed, with the documents their checklist asks for and who has to act.
Cable drums and fittings go to site on a slip and never come back.
Store registersMain and site stores on one ledger, transfers on a challan with the e-way bill, returns and scrap booked, drums tracked by number and length against the job's budget.
Subcontractors are paid on what they claim, and the labour contractor's ESI is never checked.
Measurement notesOur engineer's measurement sets the subcontractor's bill, with retention, recoveries and TDS. Check the challan before you pay: the labour contractor's bill waits for PF and ESI.
Retention and advances live in a notebook, and nobody chases the release.
A notebookRetention, advance recovery and guarantees are held per job from the order's terms, with the defects period's end and the release letter drafted on time.
Engineers spend from their own pocket on site and claim months later.
Paper vouchersSite imprest per engineer, claims filed offline on the phone against the job, and the next top-up released once the last one is settled.
One ERP for contractors, from the quotation to the last receipt.
Quotations, jobs, purchase, stores, billing, bill passing, payroll and accounts run on one system, set up for MEP and specialty contractors and fitted to your own documents. Every product works on the same job, so a challan signed at site reaches the invoice and the ledger without anyone typing it twice.
- Job costing against the quoted margin
- Site diary on mobile, offline
- Subcontractor work orders and measurement
- RA bills certified on the client portal
- Bill passing with the client's checklist
- Credit and debit notes, never edits
- Costing from last purchase rates
- Discount approvals and revisions
- Challans with e-way bills and signed acceptance
- Budget check on every indent
- Landed-cost comparison, L1 marked
- Three-way match before a bill is passed
- Cable drums by number and length
- Returns from site booked back
- Negative stock blocked
- Receivables and margin by job
- Retention and guarantees tracked
- Tally sync if your accounts stay there
- Site attendance on the phone
- Contract labour registers
- Labour cost booked to each job
- Receipts read from a photo
- Charged to the job and cost code
- Top-up only after settlement
- AMC on installed chillers, pumps and panels
- Defects complaints on the job's record
- Signed report becomes the invoice
- Project portfolio rolled into the plan
- Budget against actual by month
- CMA data for the bank
One job, from the quotation to cash.
Norvale's panel and cabling job followed through every product it touches. Each step is a record you can open, and each carries the order's line numbers.
- 01 · CRM & Sales
The quotation is costed and won
Meera prices each line from Sundar Cables' last rate, labour gangs and overheads. Rev 2 is accepted at ₹64.0 L with a 16.1% margin.
Q-26-0362 Rev 2 - 02 · Projects
The order opens the job
Norvale's PO is read from the PDF into SO-3115-01 with supply and service lines and a payment plan. Job J-3115 opens with a ₹53.7 L budget taken from the quotation's costing.
SO-3115-01 · J-3115 - 03 · Procurement
Material is bought against the budget
Arun's indent for 1,200 m of cable is checked against the job's budget, three dealers are compared, and the PO goes to Sundar Cables. The receipt lands in the main store.
PO VMS/PO/26-27/0598 - 04 · CRM & Sales
Supply goes out on a challan
DC-3115-03 carries two panels and 400 m of cable against the order's lines, with the e-way bill and LR. Norvale's stores sign it at site and Senthil uploads the copy.
DC-3115-03 - 05 · Billing
The invoice follows the challan
The supply invoice is made from the accepted challan, with the 20% advance from proforma PI-26-044 adjusted. Installation will be billed by RA bill from measured work.
VMS/26-27/0262 - 06 · Billing
Bill passing is tracked
Norvale's accounts check the invoice against the challan and the PO. Its status sits on the invoice, and Lakshmi sees it in her follow-up list until it is passed.
Passed 24 Nov - 07 · Books
The receipt closes the loop
Norvale pays net of TDS. The receipt is matched to the invoice, receivables and the job's cash update, and J-3115's margin is recalculated the same day.
RCPT-26-0871
Ask across every job.
Emplotec reads the quotations, jobs, stores, bills and accounts at once. It answers with the records it used, and anything it would change or send waits for your approval.
₹6.7 L can be claimed this quarter. Ridgeway's ₹1.8 L waits until the leak is closed.
Every line but earth pits makes money. The pit rate was quoted before chemical compound prices rose 9%; a variation would cover the last 10 pits.
The report is drafted: duct 620 m, sprinkler piping on level 3 complete, 2 hours lost to a shaft not handed over, and invoice 0231's challan noted.
Which retention amounts can we claim back this quarter, and draft the letters.
OrdersHandover datesDefects complaintsRetention ledger- Finding defects periods ending by March
- Checking open complaints on each job
- Drafting release letters
- Kestrel: ₹4.1 L, period ends 14 Dec, no open complaint after Friday's visit
- Kovai Mills: ₹2.6 L, ends February
- Ridgeway Foods: ₹1.8 L, one leak complaint still open
₹6.7 L can be claimed this quarter. Ridgeway's ₹1.8 L waits until the leak is closed.
- Letter to Kestrel Warehousing
None₹4.1 L, sent 15 Dec - Letter to Kovai Mills
None₹2.6 L, sent in February
Nothing changes until you approve.
Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works
Your documents, the way your clients want them.
Emplotec fits the way your company quotes, supplies and bills at four levels. The core is never forked, so everything we change for you carries through every upgrade.
DC-3112-019J-3112 · Meridian Hospitals Block B- Order
- SO-3112-01
- Lines
- AHU units, 3 nos
- Vehicle
- TN 37 DX 2290
- E-way bill
- 3418 2207 5104
- Signed copy
- Waiting
- Client indent no.MH/ENG/IND/2291
- Store sign-offRequired
- No supply invoice until the signed challan is uploaded
- Tell Priya when a bill sits in bill passing past 20 days
- Challan, proforma and invoice carry the order's line numbers
- Cable drums by number and length
- Meridian's bill-passing checklist, in their order
- Print in Meridian's challan layout
The core stays the same for every customer, so all of this carries through every upgrade.
Need software Emplotec doesn't have? We build it.
Emplotec is built by a software company. If your jobs need something outside the ERP, such as a link to your design tools or a client's own vendor portal, our team builds it and connects it to Emplotec, under the same support.
- Your client's vendor portal, connected for bill submission
- Quantities from your MEP drawings brought into the quotation
- A tool crib app with QR tags for test kits and tools
- Your old billing package's history, moved and kept searchable
Built for the rules where you work.
Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.
India
- GST e-invoices on every supply invoice and RA bill
- E-way bills on challans and on transfers between stores and sites
- TDS on subcontractor bills and on receipts, labour cess where it applies
- Reverse charge where it applies
- PF, ESI, Professional Tax and LWF on the Labour Codes
- Contract labour under the OSH Code, with contractors' challans checked
- MSME payment dates on every supplier bill
- Tally sync, if your accounts stay in Tally for now
UAE
- VAT on every interim bill, supply invoice and supplier bill
- E-invoicing
- Corporate tax
- WPS payroll for site staff
- Free-zone entities alongside the mainland
- Retention and advance recovery on every interim bill
Saudi Arabia
- VAT on every interim bill and supplier bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Retention and advance recovery on every interim bill
United Kingdom
- VAT with Making Tax Digital
- PAYE payroll with RTI
- Interim applications with retention, certified by the client
- Retention tracked to the end of the defects period
United States
- Sales tax, state by state
- Payroll
- 1099 forms for subcontractors
- Progress billing with retainage, tracked per job
Live in 30 days, without stopping a job.
We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which jobs, products and companies. The system is set up for trade contractors, then fitted to your own quotation, challan, invoice and RA bill formats.
- We map your jobs first: open orders, challans not yet billed, bills at clients and retention held.
- Open POs, stock in the main and site stores, subcontractor balances and accounts come across from Tally and Excel.
- We set your costing sheet, document formats, approvals and cost types to the way you work.
- Engineers and storekeepers train on their own job's data, then go live job by job.
Questions MEP and specialty contractors ask
What is the best ERP for contractors?
For a contractor running many jobs at once, one that keeps each job as a single record from the quotation to the last receipt: costing, order, purchase, site stores, challans, bills, bill passing and accounts, with job costing on every line. Emplotec does that in one system with an AI agent across it, fitted to your own documents.
Is it contractor accounting software or a full ERP?
Both. Books is the accounting: receipts net of TDS and retention, receivables and margin by job, payables with MSME dates, guarantees and bank limits. It shares one ledger with the jobs, stores, purchase, billing and payroll, so the accounts and the jobs never disagree.
How does job costing work for an MEP contractor?
The quotation's costing becomes the job's budget by cost type: material, subcontract, own labour, equipment and site expenses. POs commit cost, store issues, subcontractor bills, payroll and site cash book actual cost, and the forecast to finish is compared with the margin you quoted, line by line.
Can one order have supply against challans and installation against RA bills?
Yes. Each order line is marked supply or service. Supply is invoiced from accepted delivery challans with previous, this and balance quantities; installation is billed by RA bill from measured work. The payment plan's advance, supply, installation and retention stages sit on the same order.
Can it track bills stuck in the client's bill passing?
Yes. Every invoice shows its status at the client: submitted, query raised, resubmitted, passed or short-passed with the reason. The documents each client asks for are kept as a checklist, a short-pass becomes a credit note draft, and a list oldest first shows who has to act.
Does it handle subcontractors and labour contractors?
Yes. Subcontracts are work orders with BOQ lines. Your engineer's measurement sets the bill, with retention, advance and material recovery and TDS. A labour contractor's bill waits until their PF and ESI challans match the people deployed, and a person releases it.
How are site stores and cable drums kept?
The main store and every site store are on one stock ledger. Material moves to site on a transfer challan with the e-way bill, is issued to the job or a subcontractor, and returns and scrap are booked back. Cable drums are tracked by number and remaining length.
Does it handle retention, advances and guarantees?
Yes. Retention and advance recovery are read from each order's terms and applied to every bill. Retention is tracked to the end of the defects period with the release letter drafted, and advance and performance guarantees show with their expiry as contingent liabilities.
Can we keep Tally for our accounts?
Yes. Jobs, stores, purchase and billing run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.
Does it work for MEP contractors in the UAE, Saudi Arabia, the UK and the US?
Yes. The UAE version handles VAT, e-invoicing, corporate tax, WPS payroll and free-zone entities; the Saudi version VAT, ZATCA e-invoicing and GOSI payroll. In the UK bills are interim applications with retention, and in the US progress billing with retainage and 1099s for subcontractors.
Does it cover site cash, AMC after handover and the company plan?
Yes. Engineers claim site imprest and travel allowance on the phone, offline, against the job (Expense). After handover, defects complaints and the AMC run as service contracts on what you installed (Field Service). The company plan rolls up every job's revenue and cost to complete, with CMA data for the bank (Planning). Daily-wage gangs come through labour contractors, so they stay in HRMS as contract labour.
What doesn't Emplotec cover for contractors?
MEP design, load calculations, duct and pipe sizing, BIM and clash detection, which stay in your design tools; bidding on public tender portals; and joint-venture accounting across partners. For main contractors on large civil sites, see construction and EPC, and for HT and LT specialists, electrical contractors.
See Emplotec run your contractors and project jobs business.
Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.
- A call within one working day, from the people who build it, not a sales team.
- Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
- Cloud or your own servers, the same build either way, with your own database.