Interior project management software and ERP for interiors and custom furnitureOne record from the first site visit to the handover. Every sheet, every snag and every payment on the job.

For design-and-build interiors firms and made-to-order kitchen, wardrobe and furniture makers: enquiries and consultations, room-wise BOQs, design approval and freeze, cut lists and sheet yield, the factory's stations, dispatch, site installation, snag lists, handover and service, with each project's real margin and an agent that works across all of it.

  • Runs onProjects · CRM & Sales · Manufacturing · Quality · Inventory · Procurement · Billing · Books · Field Service · Expense · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Studio and factory today58 live projects · Wednesday 25 Nov · 09:40
Rao kitchen at riskEB-2 is down until Thursday and 96 shutter panels wait for edge banding. The before-dispatch payment of ₹16.17 L is not in yet.
Order book₹38.4 Cr58 India, 8 Singapore
Milestones due, November₹2.86 Cr₹1.12 Cr received
Edge banding load131%Next 3 days, EB-2 down
Sheet yield, 30 days81.4%Target 82%
Needs a decision
ProjectWhatWaiting onValue
Since yesterday
  • Asha Rao opened VO-2714-02 in the portal
  • Karthik filed DPR-2668-1124 with 9 photos
  • Imran failed 6 walnut panels on shade
  • Priya confirmed ₹23.10 L from the Fernandes family

Emplotec The Rao kitchen can still leave on Saturday: move its 96 shutter panels to EB-1's second shift on Thursday and remind the Raos about the 35% due before dispatch.

WO-26-1207EB-1 planDN-2714-03

In this example, Larchwood Interiors designs, makes and installs homes and offices from its Hoskote factory, with experience centres in Bengaluru and Kochi and a studio in Singapore. An edge bander is down, a kitchen dispatch waits for a payment, and a hotel job's margin has slipped. Click through enquiries, the BOQ, designs, cut lists, the station board, QC, dispatch, the site, the client portal and project margin. Example companies, people and figures.

From the experience centre to the handover certificate.

Emplotec follows the Rao villa from the first consultation through the studio, the factory and the site, and people approve every plan it drafts.

  1. The experience centre

    Meera's consultation becomes a room-wise BOQ, priced from the rate library with the cost behind every line.

    Q-2714-R2, ₹46.20 L at 23.4%

  2. The design studio

    Every room's design is approved by the Raos in the portal, and the freeze checks it against the accepted BOQ.

    11 rooms frozen on 30 Oct

  3. The board store

    The released cut lists reserve free board first, and the shortfall becomes a requisition for Arun.

    46 sheets short for Lakeview

  4. The factory

    EB-2 is down, so Emplotec re-plans the kitchen shutters onto EB-1's second shift for Ravi to approve.

    Edge banding at 131% load

  5. Packing and dispatch

    Cartons are packed by room, and the dispatch waits for the before-dispatch payment unless the director overrides.

    ₹16.17 L due before the truck leaves

  6. The site

    Karthik scans cartons in, files the daily report with photos, and closes snags for the client to verify.

    3 snags hold the Kapoor handover

  7. The accounts

    Board, factory minutes, crews and subcontract bills land on each project, so margin is known before handover.

    Harbour Suites, 22.8% to 14.6%

Does your week look like this?

Most interiors firms run on a design tool, a quote in Excel, a factory sheet and a WhatsApp group per site. These are the moments that send them looking for interior project management software that runs the whole job.

  • The quote is revised four times in Excel, and the factory builds from R1 while the client signed R2.

    Excel

    One room-wise BOQ per project, priced from your rate library, with every revision compared line by line. Only the accepted revision becomes the contract.

  • The client changes the TV unit on WhatsApp after the freeze, and nobody bills it.

    WhatsApp

    After the freeze, every change is a variation priced from the rate library and approved by the client in the portal, then billed.

  • Production starts before the design-freeze payment comes in, and the money follows months later.

    A payment sheet

    A payment schedule per project, and gates that hold production and dispatch until the milestone is received, unless the director overrides with a reason.

  • Cut lists are typed from the drawings, and a wrong boring ruins a gloss shutter.

    Excel

    Cut lists come from the frozen design's units: every panel's size, board, finish, grain, edge band and boring, with a barcode label.

  • Board is cut, offcuts pile up, and nobody knows the yield or what it cost each job.

    Guesswork

    Sheets issued against each cut list, yield by board and project, offcuts above 300 mm back on the remnant rack and used first.

  • The truck reaches site and one carton is missing, so the crew waits a day.

    A phone call

    Cartons packed by room with labels, scanned onto the truck and scanned in at site. A missing or damaged carton raises a site issue and a recut the same day.

  • The snag list is in photos, and the client holds the last 5% for months.

    WhatsApp photos

    A snag list per room, closed with a photo and verified by the client in the portal. Handover is signed there, and the last milestone falls due.

  • The hotel job looked like 23% at award, and turned out 14% at handover.

    Tally

    Board, factory minutes, crew days, subcontract bills and freight booked to the project as they happen, with a forecast margin you see every week.

Interior project management software that runs your factory and sites too.

Sales, design approval, the factory, stores, purchase, sites, billing and accounts on one system, set up for interiors and custom furniture, then fitted to your own way of working.

Start here
  • Rooms and floors as the work breakdown
  • Daily progress report with photos, offline
  • Snag list and handover per room
Emplotec Projects
  • Room-wise BOQ with a costing sheet behind every line
  • Discount approvals by value
  • Architect commission on receipts
Emplotec CRM & Sales
Add next
  • Cut lists from the frozen design
  • Station board with load and bottlenecks
  • Recuts booked to the project
Emplotec Manufacturing
  • Reservations when a cut list is released
  • Remnants used before new sheets
  • Cartons scanned out and in at site
Emplotec Inventory
  • Requisitions from the shortfall
  • Rate contracts for board and hardware
  • Three-way match on every bill
Emplotec Procurement
  • Milestones that release on the event
  • RA bills certified by the client
  • Retention held and released
Emplotec Billing
  • Project P&L from postings
  • India and Singapore books, group view
  • Tally sync if you keep Tally
Emplotec Books
When you need it
  • Fail reasons by station
  • Veneer and board lots held
  • Recut cost claimed from vendors
Emplotec Quality
  • Warranty checked on the request
  • Spares issued from stores
  • Chargeable visits invoiced
Emplotec Field Service
  • Imprest per site supervisor
  • Claims on the phone, offline
  • Charged to the project and room
Emplotec Expense
  • Budget by studio and factory
  • Cash from payment schedules
  • CMA data for working capital
Emplotec Planning
LW-2702 · subcontractsNorvale Technologies · Bellandur
Work orderSubcontractorMeasuredBillStatus
SWO-2702-01Crestline Ceilings6,200 sq ft₹9.8 LPassed, 5% retained
SWO-2702-02Brightwire Electricals412 points₹6.1 LMeasurement to verify
SWO-2702-03Colourcraft PaintersNot startedIssued

One modular kitchen, from the consultation to the handover.

The Rao villa, followed through every product it touches. Nobody re-enters anything, and every step is a record you can open.

  1. 01 · CRM & Sales

    Consulted, quoted, accepted

    Meera measures the villa and quotes eleven rooms from the rate library. The Raos compare R1 and R2 and accept R2 in the portal.

    ENQ-26-0981 · Q-2714-R2
  2. 02 · Billing

    Booked, with a payment schedule

    The project opens from the accepted quote with its budget by room and cost type. The booking of ₹4.62 L is received and the schedule is set: 10, 50, 35 and 5.

    LW-2714 · 4 milestones
  3. 03 · Manufacturing

    Design frozen, cut lists released

    Every room is approved, the design reconciles to the BOQ, and the freeze payment is in. The kitchen's 22 units become 412 panels on CL-2714-KIT.

    D-2714 · CL-2714-KIT
  4. 04 · Procurement

    Board reserved, the gap bought

    The release reserves free board and hardware. The tall pull-out isn't in stock, so a requisition becomes a PO at the rate contract.

    PR-26-0652 · LW/PO/26-27/0781
  5. 05 · Quality

    Through the stations and QC

    Panels are scanned at cutting, edge banding, CNC and QC, and never skip a step. One wrong boring is recut, and its cost lands on the project.

    WO-26-1207 · P-K04-12-R1
  6. 06 · Inventory

    Packed by room, dispatched at the gate

    Fourteen cartons with labels by room. The truck leaves once the 35% before-dispatch payment is in, and Karthik scans each carton at site.

    DC-26-1431 · 14 cartons
  7. 07 · Projects

    Installed, snagged, handed over

    Daily reports with photos, subcontract bills on measurement, a snag list per room closed with photos, and the handover signed by the Raos in the portal.

    DPR-2714 · HO-2714
  8. 08 · Books

    The real margin, room by room

    Board at cost, factory minutes scanned, crew days, subcontract bills and freight make the project's actual cost. The kitchen finished at 24.6%.

    LW-2714 · P&L

Ask your studio and factory anything.

Emplotec reads across enquiries, designs, cut lists, the station plan, sites and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Yes, with the freeze by 18 December and Joseph Mathew's crew from 12 January. Handover lands on 12 February with three days for snags. I've drafted the timeline for Meera's consultation on Saturday.

  • Two of three. Crestline's ₹3.42 L passes with 5% retention and TDS. Brightwire billed 412 points and the site verified 388, so I've drafted a bill for 388 and a note to Brightwire.

  • ₹3.14 Cr falls due in December, mostly before-dispatch milestones. Four clients still owe November's, ₹41.2 L, and two of them have trucks planned. I've drafted reminders for Priya and flagged both dispatches at the gate.

  • CMA data drafted in the bank's template: two years of actuals, this year's estimate from the ₹38.4 Cr order book, and next year's projection. Holding levels for board and work in progress come from the stock ledger. It is ready for Priya to review.

EmplotecAcross the business

Can we hand over the Reddy villa by 15 February if they book this week?

ReadStation planDesign lead timesCrew bookingsPayment schedule template
  1. Working back from 15 Feb
  2. Checking design and freeze time
  3. Checking factory weeks and crews
  • Design to freeze fits by 18 Dec at Meera's current load
  • Factory weeks 52 to 3 have room after the Harbour recuts
  • Karthik's crew is on Norvale until 9 January

Yes, with the freeze by 18 December and Joseph Mathew's crew from 12 January. Handover lands on 12 February with three days for snags. I've drafted the timeline for Meera's consultation on Saturday.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your studio's way of working, not ours.

Emplotec is set up for interiors and custom furniture, then fitted to your own process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

ProjectLW-2714Rao villa · Sarjapur Road
Accepted quote
Q-2714-R2, ₹46.20 L
Rooms
11
Payment schedule
10, 50, 35, 5
Design frozen
30 Oct
Referred by
Fernhill Architects
Supervisor
Karthik
Configure it
  • Finish gradePremium
  • Possession dateJan 2027
  • Architect's approvals
Set your rules
  • Hold production until the design-freeze payment is received
  • Discount above 8% to the sales head, above 12% to the MD
Your industry's extension
  • Room-wise BOQ with make, buy or subcontract on each line
  • Cut list from the frozen design, with grain and edge banding
  • Snags closed only with a photo and the client's check
Yours alone
  • A hotel client's room-by-room handover checklist
  • HDB renovation permit dates checked before every install day

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your studio needs something outside the ERP, such as a link to your design tool or panel optimiser, our team builds it and connects it to Emplotec, under the same support.

  • Units and panels read from your design tool's export, every time a design is shared
  • Cut lists sent to your panel optimiser and its sheet plan read back
  • A catalogue of finishes and shades for the experience centre's screen
  • Your old quotes and projects moved and kept searchable

Built for the rules where you build.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST on every milestone and RA invoice, billed from the GSTIN of the project's state
  • E-invoices, and e-way bills for every dispatch to site
  • TDS on subcontractor bills and on clients' payments, under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF on the Labour Codes, for factory and site crews
  • MSME payment dates tracked on every vendor bill
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without stopping a site.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which studios, factories and companies. The system is set up for interiors and custom furniture, then fitted to your workflow, so quotes, designs, cut lists and sites read the way your team already works.

  1. We map your studio first: your rate library, quote layout, payment schedules, factory stations and how sites report.
  2. Your rates, open quotes, live projects, stock, subcontractors and balances come across from Excel and Tally.
  3. We fit the BOQ, cut list, carton label, snag list and handover documents to your own formats.
  4. Designers, planners, supervisors and accounts train on your own live projects, then go live.
What is the best interior design project management software for a design-and-build firm?

One that runs the whole job, not just the studio: enquiries and consultations, room-wise BOQs from your rate library, design approval and freeze, payment milestones, cut lists, the factory, dispatch, site installation, snags, handover and service, with each project's margin. Emplotec does all of that on one system, with an AI agent across it.

Is Emplotec interior design software?

No. Emplotec doesn't draw or render. Your designers keep their design tool, and Emplotec reads its export into units and panels, then runs everything after the design: the BOQ, approvals, the factory, purchase, sites and accounts.

Can production wait until the design-freeze payment is in?

Yes. Each project has a payment schedule, and a gate holds production until the design-freeze milestone is received and holds the truck until the before-dispatch milestone is in. The director can override with a reason, which is recorded.

How are changes after the design freeze handled?

As variations. Each is priced from the rate library against the accepted quote, including any panels already cut, approved by the client in the portal, and billed in full or with the next milestone. Only the changed units go back to the factory.

Does it make cut lists and track sheet yield?

Yes. Cut lists come from the frozen design's units, with each panel's size, board, finish, grain, edge band, boring and barcode. Sheets issued against them give the yield by board and project, and offcuts above 300 mm go back to stock to be used first. Emplotec isn't a nesting optimiser; if you use one, we connect it.

Does it work for modular kitchen and wardrobe makers, and cabinet and millwork shops?

Yes. Kitchens, wardrobes, vanities, TV units and office workstations are unit types in your rate library, priced per square foot, running foot, unit or seat, and each released unit becomes panels, hardware and a work order through your stations.

How are commercial fit-outs billed?

With a mobilisation advance and monthly RA bills on measured progress per BOQ line, certified by the client, with retention held and released after the defects period and the advance recovered from each bill.

Can clients, architects and subcontractors use it?

Yes, free on the portals. Clients approve designs, quotes and variations, pay milestones, see site photos and verify snags on their phone. Architects see their referrals and commission. Subcontractors receive work orders, submit measurements and see their bills and payments.

Does it handle site installation and snag lists?

Yes, on the mobile app, offline. Supervisors scan cartons in, file a daily progress report with photos and crew attendance, raise and close snags with photos, and run the handover checklist the client signs in the portal.

We have studios in India and Singapore. Does it handle both?

Yes. Each country is its own company with its own currency, tax and books, and the group view consolidates them. Projects made in one country's factory and installed in another carry the export shipment, and renovation permits are checked before each install day.

Does it cover warranty and service after handover?

Yes. The installed units go on a warranty register at handover. A service request checks cover, books a technician with the right spare, and closes with a signed report; out-of-warranty visits are quoted and invoiced.

Can we keep Tally?

Yes. Quotes, designs, the factory and sites run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for the way our studio works?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules such as payment gates; extensions for interiors firms; and extensions for your own workflow, such as one hotel client's handover checklist. The core is never forked, so your changes survive upgrades.

What doesn't Emplotec cover for interiors firms?

3D design, rendering and CAD, an online room planner for homeowners, nesting optimisation, BIM, and e-commerce. Your design tool's export and your panel optimiser can be connected.

See Emplotec run your interiors and fit-out business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp