ERP for electronics manufacturingEvery serial traced to the reel. Every shortage planned around.

For assemblers of LED drivers, controllers, panels, switchgear, motors and meters, and for EMS houses: BOM revisions and ECNs, approved alternates in MRP, imported parts at landed cost, and every serial with its component lots, test and burn-in record. One system, with an agent that works across all of it.

  • Runs onManufacturing · Inventory · Procurement · Quality · CRM & Sales · Books · Field Service · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Plant overviewNoida · week 46 · today 10:52
1 order at riskDriver IC LD-7731 is 7,400 short for SO-2291, Lumexa's 12,000 LED drivers due 20 Nov. Novacomp quotes six weeks.
On-time delivery93.6%+0.8 pts on last month
First-pass yield at test97.8%−0.9 pts, BC-28
Component shortages₹6.8 L11 parts, 3 orders
Burn-in failures0.42%Within the 0.5% limit
Load by lineThis week, finite capacity
  • SMT-1Placement, double lane91%
  • SMT-2Placement, single lane78%
  • WaveThrough-hole64%
  • Assembly ADrivers and controllers88%
  • Burn-in1,920 positions94%
Orders due5 of 14
OrderCustomerProductDueStatus

Emplotec Lumexa approved XC-7731A as an alternate under ECN-118 on 4 November, and 5,200 are in stores. Novacomp holds 2,500 LD-7731 in Bengaluru for 16 Nov. Together they keep 20 November.

ECN-118StockNovacomp quote

In this example, Vetrion Electronics runs its Noida plant on Emplotec. A driver IC is 7,400 short for Lumexa's 12,000 LED drivers, an approved alternate is sitting in stores, and Emplotec has a plan waiting for Anand. Click through shortages, BOMs and ECNs, the line board, test and burn-in, warranty claims and board cost. Example companies, people and figures.

Every serial, from the reel to the margin.

Emplotec follows Lumexa's drivers from the component stores through the line and the burn-in racks, and people approve every plan it drafts.

  1. The component stores

    LD-7731 is 7,400 short, so Emplotec plans the approved alternate and a distributor buy.

    PO-3517, for Anand to approve

  2. Goods in

    Each reel is scanned in with its lot and date code, held until checked.

    Reel R-90117, GRN 8906

  3. The SMT line

    Every serial records the reels loaded on the line, alternate IC included.

    Serials 04601 to 09800: XC-7731A

  4. Test and burn-in

    BC-28's no-start failures all carry capacitor lot C-2207, so containment is drafted.

    96.1% first-pass yield, limit 97%

  5. Dispatch

    The serial list Lumexa asks for leaves with the e-invoice and e-way bill.

    12,000 drivers, due 20 Nov

  6. The returns bench

    Aerodyne's returns trace to lot C-2207, so Emplotec drafts the 8D and claim response.

    ₹1.16 L on 31 claims

  7. Board cost

    Landed component cost per driver, at today's rupee, against the quote.

    ₹10 more a driver

Does your week look like this?

These are the moments the BOM spreadsheet and the test station PC stop keeping up.

  • A ₹40 IC is short and a 12,000-unit order stops. The alternate was approved months ago, in an email nobody can find.

    Email and Excel

    Approved alternates sit on the BOM with the ECN that approved them. MRP uses them before it reports a shortage, and every serial records which part it carries.

  • The ECN moved the BOM to rev E, and the line built 600 boards on rev D.

    BOM_final_v3.xlsx

    BOMs have revisions and ECNs with approvals and an effective work order. The line can only issue the revision in force, and old stock and WIP are decided before release.

  • A brand calls with a failed unit's serial, and it takes a day to find when it was built, what went into it and how it tested.

    Registers and test logs

    Every serial carries its work order, BOM revision, component lots from the reels, and its test and burn-in record. One search, forward or back.

  • Test and burn-in results sit on the station PC as CSV files nobody links to the serial.

    Test station PCs

    Results are recorded against the serial on the test plan, failures open NCRs, and first-pass yield is shown by product, station and component lot.

  • Imported parts are costed at the quote's exchange rate. Duty and freight never reach the item cost.

    Tally

    Every bill of entry posts duty, freight and clearing into landed cost, so each board's cost is real and you see what the rupee does to every product.

  • A brand's warranty debit arrives as a total, and it gets accepted because checking 38 serials takes too long.

    Email and Excel

    Each claim is matched to its serial, build date, test record and component lots. You accept what is yours, dispute the rest with records, and recover from the vendor.

  • A tray of MSL 3 ICs sat open over the weekend, and nobody knows whether it went on the line on Monday.

    A label and a pen

    Floor life is counted per reel from the moment the dry pack opens. A reel past its limit can't be issued until it is baked, and the baking is logged.

  • Returned units pile up on the bench, and the customer asks every week which ones were replaced.

    A returns register

    Every return has its authorisation, its serial's full build and test record, a fault found and a decision, with replacements and credit notes raised from the same record.

One ERP for electronics manufacturing, from the BOM to the warranty claim.

Planning, the line, stores, serials, tests, warranty claims, purchase and accounts run on one system, set up for electronics assembly. BOMs, components, serials, tests and money share the same data from day one.

Start here
  • Alternates used before a shortage is reported
  • ECNs with an effective work order
  • BOM import from CAD exports
Emplotec Manufacturing
  • Serial genealogy down to the reel
  • Lots held in QC until released
  • Customers' own components kept apart
Emplotec Inventory
Add next
  • Quotes from distributors in one comparison
  • Bill of entry, duty, IGST credit and landed cost
  • Approved vendor lists per part
Emplotec Procurement
  • POs read from PDF into draft orders
  • Warranty claims checked serial by serial
  • Promise dates from stock and capacity
Emplotec CRM & Sales
When you need it
  • Test records against every serial
  • Failures traced to the component lot
  • 8D for brands, corrective action for vendors
Emplotec Quality
  • Every installed unit by serial
  • Engineers matched by skill and certification
  • Signed report becomes the invoice
Emplotec Field Service
  • Budget against actuals every month
  • CMA data in your bank's template
  • Raw material price as a scenario
Emplotec Planning
Work order WO-4410LD-40W rev E × 12,000 · Lumexa SO-2291
Release
SMT12,000SMT-1
Wave12,000Through-hole
Assembly12,000Potting
Test12,000TS-3
Burn-in8 h45 °C
Serial ranges
SerialsDriver ICSourceQtyStatus
LMX-40W-2611-00001 to 04600LD-7731Stock4,600Reserved
LMX-40W-2611-04601 to 09800XC-7731AStock, ECN-1185,200Reserved
LMX-40W-2611-09801 to 12000LD-7731Novacomp, PO-35172,200Due 16 Nov

One order, from Lumexa's PO to cash.

Lumexa's 12,000 LED drivers, followed through every product they touch, shortage included. Nobody re-enters anything, and every step is a record you can open.

  1. 01 · CRM & Sales

    Lumexa's PO comes in

    Lumexa emails a PO for 12,000 LD-40W drivers. Emplotec reads the PDF into a draft order with Lumexa's SKU mapped to our item and BOM rev E, and Meera confirms it.

    SO-2291 · LMX/PO/7741
  2. 02 · Manufacturing

    MRP uses the approved alternate

    MRP explodes rev E against stock. LD-7731 is 7,400 short, so it takes the 5,200 approved XC-7731A first and leaves 2,200 to buy.

    MRP-0388 · U1
  3. 03 · Procurement

    A spot buy from the distributor

    Ravi raises the PO for a full reel of 2,500 at Novacomp's spot price. Anand approves it on his phone, because it is above the contract rate.

    PO-3517 · Novacomp
  4. 04 · Inventory

    Received by reel and date code

    Arun scans the reel at the gate. The GRN carries the reel number, lot and date code, and the reel waits for its incoming check before the line can use it.

    GRN 8906 · reel R-90117
  5. 05 · Manufacturing

    Built, serialised, every lot recorded

    SMT-1 builds the boards and each one gets its serial. The reels loaded on the line are recorded against every serial, so serials 04601 to 09800 show XC-7731A.

    WO-4410 · 12,000 serials
  6. 06 · Quality

    Tested and burned in, per serial

    Each driver is tested at TS-3 and runs 8 hours of burn-in at 45 °C. Karthik's results land on the serial, and a failure opens an NCR instead of a note in a log.

    Serial LMX-40W-2611-04617
  7. 07 · Books

    Shipped with the serial list, paid

    Arun raises the e-invoice and e-way bill at dispatch and attaches the serial list Lumexa asks for. When Lumexa pays, the receipt matches by itself and the order's margin is final.

    INV-2026-2207

Ask your plant anything.

Emplotec reads across BOMs, components, serials, tests and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Yes, by 18 December, if Gridline sends 1,200 more MCUs by 4 December. I've drafted the reply for Meera at last order's conversion charge.

  • Three parts could stop a product line on their own. I've drafted ECN requests for alternates on two of them and an RFQ to a second transformer maker.

  • A draft at ₹462 a driver for 10,000, with today's exchange rate in the landed cost and the new parts at budget prices until quotes come in. Lead time is six weeks from PO.

  • ITC-04 is ready with 9 challans. Kalinga used 14 kg more copper than the norm, and I've drafted a debit note. Your accountant files the return.

EmplotecAcross the business

Can we take Gridline's 5,000 meter boards for December?

ReadLine boardBurn-in racksGridline's free-issue stockBOM GM-1Last conversion charges
  1. Running a what-if on SMT-2 for December
  2. Checking burn-in positions at 8 hours and 55 °C
  3. Checking Gridline's MCUs held with us
  4. Checking our own components
  • SMT-2 has 46 hours free in week 50
  • Burn-in fits on racks BI-1 and BI-2 over two shifts
  • We hold 3,800 of Gridline's MCUs; 1,200 more are needed
  • Our own components are in stock or within lead time

Yes, by 18 December, if Gridline sends 1,200 more MCUs by 4 December. I've drafted the reply for Meera at last order's conversion charge.

Reply to GridlineWaiting for you
  • GM-1 boardsAsked 5,0005,000 by 18 Dec
  • Gridline's MCUs3,800 held1,200 more by 4 Dec
  • Conversion chargeNone₹96 a board
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your line's way of working, not ours.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Serial recordLMX-40W-2611-04617WO-4410 · LD-40W for Lumexa
BOM
Rev E
Line
SMT-1
Test station
TS-3
Burn-in
8 h at 45 °C
Result
Passed
Packed
Carton C-0461
Configure it
  • Firmware version2.4.1
  • Hi-pot voltage3 kV
  • Line leader sign-off
Set your rules
  • Block packing if burn-in is under 8 hours
  • Tell quality when a product's first-pass yield falls below 97%
Your industry's extension
  • Component lots from the reelsR-88214, C-2241
  • Alternate used, with its ECN, shown on the serial
Yours alone
  • Print Lumexa's QR label with its SKU and date code
  • Gridline boards: 100% burn-in at 55 °C

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your plant needs something outside the ERP, such as a link from your test stations or a portal for your brands, our team builds it and connects it to Emplotec, under the same support.

  • A link from your test stations that writes each result to the serial
  • A portal where your brands look up any serial's build and test record
  • Your distributors' stock and price feeds, connected to MRP
  • Your old BOM files and serial history, moved and kept searchable

Built for the rules where you assemble.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices and e-way bills raised at dispatch
  • Imports with the bill of entry, duty, IGST credit and landed cost
  • Job work and ITC-04, for coil winding and PCB assembly
  • GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
  • TDS and TCS under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF on the Labour Codes
  • MSME payment dates tracked on every vendor bill
  • BIS registrations per model in the compliance calendar, with renewal reminders
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without stopping a line.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, products and companies. The system is set up for electronics assembly, then fitted to your own workflow, so BOM revisions, serials and test records read the way your lines already work.

  1. We map your plant first: lines, BOMs and their revisions, approved alternates, and how serials and tests are recorded today.
  2. Your item master, BOMs from Excel or CAD exports, open orders, stock by lot and balances come across from Tally and Excel.
  3. We fit the work order, the serial record, test plans and your labels to the way your lines work.
  4. Your planners, stores, line leads and test engineers train on your own data, then go live line by line.
What is the best ERP for electronics manufacturing?

One that keeps BOM revisions and ECNs under control, uses approved alternates before it reports a shortage, traces every serial to its component lots, holds test and burn-in records against the serial and costs imported parts at landed cost, on the same ledger as your accounts. Emplotec does all of that in one system, with an agent across it.

Does Emplotec track serial numbers to the component lot?

Yes. Every serial carries its work order, BOM revision, the reels and lots used on it, and its test and burn-in record. You can trace forward from a lot to every serial and customer, or back from a serial to its vendors.

How does it handle alternate components?

Approved alternates sit on the BOM line with the ECN that approved them. MRP uses an alternate in stock before it reports a shortage, and the serial records which part it carries.

Does it work for an EMS company building on customers' parts?

Yes. Job work received covers customer job orders, customer-owned components kept apart from your stock, return challans and conversion charges, alongside your own products on the same lines.

Can it handle warranty claims from our customers?

Yes. Each claim is matched to the serial's build date, test record and component lots, and to the customer's debit note. You accept or dispute each one with records, and the 8D and the vendor's corrective action are drafted from the same data.

Does it track the floor life of moisture-sensitive parts?

Yes. Each reel carries its MSL. Exposure is counted from the moment the dry pack is opened, time in the dry cabinet is set aside, and a reel past its floor life can't be issued to the line until it is baked and logged.

How are returns of our own products handled?

Each return gets a return authorisation and is received against the serial it was shipped as. On the returns bench, the build, BOM revision, component lots and test record come up with it; the decision to replace, repair, credit or return it as is goes to a person, and a component fault is recovered from the vendor.

Can we keep Tally for our accounts?

Yes. Production, stores, serials and job work run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for our process?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for electronics assemblers; and extensions for your own workflow. The core is never forked, so your changes survive upgrades.

Does it run on our own servers?

Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.

Does it handle service calls for the panels and UPS we install?

Yes. Every installed unit carries its serial, warranty and AMC. A call is checked against the cover, an engineer is matched by skill and certification with the part in the van, the report is signed on the phone, and chargeable work is billed the same day (Field Service). The year's budget and the bank's CMA data come from the same records (Planning).

What doesn't Emplotec cover for electronics manufacturers?

Live data from placement, AOI or test equipment, which stays on the machines: results are recorded against the test plan. PLM and ECAD integration, beyond BOM import from CAD exports. Field service at your customers' sites is covered by Field Service, and floor life of moisture-sensitive parts and returns of your own products are covered.

See Emplotec run your electrical and electronics business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp