Fire extinguisher, fire alarm and sprinkler inspection softwareEvery inspection on time. Every deficiency quoted.

For fire protection contractors who install and maintain fire alarms, sprinklers, hydrants, extinguishers, suppression and emergency lighting: every device at every site, inspections due by system, the technician's checklist with photos, repair quotes approved on site, AMC billing and the client's report pack, on one ERP with an agent that works across all of it.

  • Runs onField Service · Assets & Maintenance · Billing · Inventory · Compliance · HRMS · Books · Projects
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
AMC desk today412 sites · Wednesday 25 Nov · 09:40
9 quotes waitingDeficiencies found on November's visits are quoted but not approved by the clients: ₹4.8 L of repair work.
Inspections due, November186142 done, 44 left
Done on time, October97%+4 pts on September
Open deficiencies637 critical
Quoted, not approved₹4.8 L9 quotes
Inspections due by systemNovember, done of due
  • Extinguishersmonthly checks, 61 sites54 of 61
  • Fire alarmquarterly and half-yearly35 of 47
  • Sprinklersquarterly22 of 32
  • Hydrants and risersquarterly18 of 25
  • Kitchen suppressionhalf-yearly7 of 11
  • Emergency lightingmonthly6 of 10
Needs you today
ItemSiteOwnerStatus

Emplotec Six of the nine waiting quotes are for deficiencies the clients' own staff saw on the visit. A reminder with the photos usually gets them approved inside a week.

DeficienciesRepair quotesSigned reports

In this example, Suraksha Fire & Safety Systems maintains fire systems at 412 sites from Andheri East on Emplotec. November's inspections are due, a sprinkler visit found two deficiencies, extinguishers are due their hydro test, and Emplotec has a plan waiting for Anand. Click through the inspection due board, a sprinkler inspection, the technician's phone, deficiency quotes, the client report pack, the extinguisher register, AMC billing, the refill bay and technicians. Example companies, people and figures.

From the AMC desk to each site's report pack.

Emplotec reads every device, inspection and deficiency across Suraksha's 412 sites, and drafts the plans people approve.

  1. The AMC desk

    Emplotec lists every inspection due this month by site and system, with who is certified to do it.

    186 inspections due in November

  2. The van

    Senthil's van carries the sprinkler heads and refill agent tomorrow's jobs need, issued from the Andheri store.

    14 heads, 25 kg of ABC powder

  3. The client's building

    At Sunrise Mall, Senthil scans each riser, works the quarterly checklist and photographs two deficiencies.

    SVC-2611-0418, 2 deficiencies

  4. The pump room

    Pressures and the pump run go into the report, and the client approves the repair quote on his phone.

    QT-2611-0093 approved by OTP

  5. The refill bay

    Cylinders due their hydro test come in by serial, with a loaner left on site, and go back with new dates.

    312 hydro tests due by March

  6. The accounts

    The AMC quarter and the approved repairs bill from the signed reports, and each contract shows its margin.

    ₹3.65 L AMC quarter, Sunrise Mall

Does your month look like this?

These are the moments fire protection companies start looking for fire inspection software. Each one is the device, the visit and the bill kept in different places.

  • An inspection falls due on a building nobody scheduled, and the client hears about it from the fire officer first.

    A wall calendar

    Every system at every site carries its inspection plan, monthly to five-yearly, and the due board shows what falls due by site and system before it does.

  • The extinguisher list for a site never matches what is on the walls.

    Excel per site

    Each extinguisher has a QR tag, a serial, its type, location, last refill and hydro test date. The monthly check scans it, so a missing one shows up that day.

  • A technician finds corroded sprinkler heads, the quote is typed in the office three days later, and the client forgets.

    Word and email

    The deficiency becomes a quote on the technician's phone, priced from your rate card, and the client approves it before the technician leaves.

  • Photos of the closed valve are on a technician's WhatsApp, not on the report.

    WhatsApp

    Every photo is taken in the app against the device, so the signed report carries the evidence.

  • Before a fire NOC renewal or an audit, someone spends a week finding a year of reports.

    The client portal holds every signed report, register and certificate by site, and the year's pack downloads in one click.

  • A cylinder goes back on a wall past its hydro test date.

    A register book

    Hydro test dates sit on each cylinder's record. Due ones go to the refill bay by serial, with a loaner left on site, and come back with the new date.

  • An AMC is busy with call-outs and refills and nobody knows it loses money.

    Tally

    Labour, parts, refills and travel land on each contract, so margin by AMC is known before the renewal.

  • A technician's licence lapses and he still goes to a sprinkler job.

    Licences and approvals sit in HRMS with expiry dates, and dispatch only offers a job to someone valid on the day.

Fire inspection software built on every device's record.

Start with Field Service and Assets & Maintenance, then add Billing, Inventory, Compliance, HRMS and Books. Installations run in Projects. Every inspection, deficiency, refill and invoice reads the same device and contract records.

Start here
  • Inspection plans from monthly to five-yearly
  • A fire extinguisher inspection app that works offline
  • Report packs for each client on the portal
Emplotec Field Service
  • A QR tag on every extinguisher and riser
  • Hydro test and refill dates per cylinder
  • Deficiencies kept on the device until closed
Emplotec Assets & Maintenance
Add next
  • Fire AMC billing from the contract
  • Approved quotes billed when the work is signed
  • Renewals priced from the year's cost
Emplotec Billing
  • Van stock replenished from tomorrow's jobs
  • Loaners tracked to the site
  • Parts used issued to the job
Emplotec Inventory
  • Contractor approvals and licences with reminders
  • Insurance renewals
  • A calendar of every client's half-yearly forms
Emplotec Compliance
  • Licences checked before dispatch
  • Overtime from after-hours visits
  • Payroll on the same records
Emplotec HRMS
  • Margin by AMC and by site
  • Receivables chased from the portal
  • Keep Tally until you move
Emplotec Books
When you need it
  • Budget against cost for every installation
  • Stage bills from progress
  • Handover devices go on the AMC register
Emplotec Projects
Inspections dueThis week · by site and system
SiteSystemDueTechnician
Harbourview HospitalFire alarm, loops 3 and 427 NovMurugan
Seabreeze HotelKitchen suppression28 NovSenthil
Westbay Towers CHSWet riser, Tower C30 NovProposed: Murugan
Krishna PharmaExtinguishers, 18630 NovKarthik

One quarterly sprinkler inspection, from the plan to cash.

Sunrise Mall's Q3 sprinkler visit, followed through every product it touches. The device is recorded once, and it becomes the checklist, the quote, the bill and the client's report.

  1. 01 · Field Service

    The AMC becomes inspection plans

    Sunrise Mall's two-year AMC covers the fire alarm, sprinklers, hydrant and 312 extinguishers. Each system gets its plan: quarterly sprinkler and alarm visits, monthly extinguisher checks.

    AMC-0611
  2. 02 · Field Service

    The plan falls due and is dispatched

    Q3's sprinkler inspection falls due on 30 November. Meera confirms Senthil, whose licence is valid and whose van has spare heads.

    SVC-2611-0418
  3. 03 · Field Service

    The checklist finds two deficiencies

    Senthil scans the pump room, works the quarterly checklist and photographs a closed control valve and 14 corroded heads. He opens the valve on the spot.

    DEF-2611-0207 · 0208
  4. 04 · Field Service

    The client approves the quote on site

    The 14 heads become a quote priced from the rate card. Rahul Bose approves it on Senthil's phone and signs the report by OTP.

    QT-2611-0093
  5. 05 · Inventory

    The heads are fitted the next day

    Fourteen heads are issued from van V-07 to the job, fitted on Wednesday morning, and the van is topped up from the Andheri store.

    ISS-2611-0331
  6. 06 · Billing

    The quarter and the repair are billed

    The AMC's quarterly instalment and the approved repair go on one invoice, with the quarter's six signed reports as the annexure.

    INV-2611-0512
  7. 07 · Books

    Paid, and the contract's margin is known

    Sunrise Mall pays against the invoice. Labour, heads and travel are already on AMC-0611, so its margin for the year is 43%.

    RCT-2612-0044

Ask your sites anything.

Emplotec reads the devices, plans, reports, deficiencies, stock, technicians, invoices and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Four sites are behind on seven inspections. Three wait on the clients for access, so I've drafted requests with two dates each; the fourth was missed on leave and Murugan can do it on Friday.

  • The report is drafted: nine visits on time, five deficiencies fixed and the emergency lighting quote still open, with the photos of each failed fitting. It's ready for Meera to send to the hospital's facility head.

  • You'll need 400 kg of ABC powder and CO2 for 84 more cylinders by February. I've drafted both purchase orders with your usual suppliers for Priya to approve.

  • Three licences lapse by February and touch eleven jobs. I've drafted course bookings before each date for Deepa.

EmplotecAcross the business

Which sites are behind on their inspections, and why?

ReadMaintenance plansSigned reportsDispatch boardCertifications
  1. Comparing every site's visits with what its AMC promises
  2. Finding the inspections overdue or unbooked
  3. Checking why: access, people or parts
  • 4 sites behind: 7 inspections overdue
  • 3 wait for the client's access window
  • None are short of a certified technician

Four sites are behind on seven inspections. Three wait on the clients for access, so I've drafted requests with two dates each; the fourth was missed on leave and Murugan can do it on Friday.

Overdue inspectionsWaiting for you
  • Access requestsNone3 drafts, 2 dates each
  • Westbay Tower CUnassignedMurugan, Friday
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your systems, your clients, your way of working.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Quarterly sprinkler inspectionSVC-2611-0418Sunrise Mall, Thane · 24 Nov
Installations
4
Checks
36 of 38 passed
Deficiencies
2
Technician
Senthil
Signed by
Rahul Bose, OTP
Reviewed by
Arun Pillai
Configure it
  • Riser and zone namesL2 riser, zone 4
  • Gauge unitsbar
  • Client security supervisor's sign-off
Set your rules
  • A closed control valve tells the client and the technical head at once
  • A report with an open critical deficiency can't be marked satisfactory
Your industry's extension
  • Build the client's report pack for the year from the signed reports
  • Hydro test due on each cylinderDec 2026
Built for you alone
  • Hospital's permit-to-work numberPTW-HV-2207
  • Mall jobs: a hot-work permit before any head is changed

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your fire business needs something outside the ERP, such as a link to your alarm panels' event logs or your clients' own portals, our team builds it and connects it to Emplotec, under the same support.

  • A reader for your alarm panels' event logs, so device tests land on the report
  • Reports uploaded to your clients' own vendor or facility portals
  • A tag printer set up for your extinguisher QR labels
  • Your old inspection app's sites, devices and reports, moved and kept searchable

Built for the rules where you service.

The inspection records each market asks for, and your country's tax and payroll, are part of the system. Your engineers inspect and sign; Emplotec keeps the record. It doesn't certify and doesn't file with any authority.

India

  • Inspection records for systems designed to NBC 2016 Part 4
  • Extinguisher records kept as IS 2190 asks, with refill and hydro test dates
  • Maharashtra's twice-yearly Form-B from your licensed agency, with the inspections behind it
  • Fire NOC renewal dates per building
  • GST e-invoices with the visit annexure
  • TDS on receipts under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF for technicians
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without missing an inspection.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which branches, companies and products.

  1. We map your business first: sites, systems, AMCs, visit frequencies and how each client is billed today.
  2. Sites, devices, extinguisher registers, contracts, open quotes and balances come across from Excel, your inspection app and Tally.
  3. We set up your checklists per system and your report formats, and tag each extinguisher with a QR label.
  4. Your AMC desk, technicians and accounts train on your own data, then go live branch by branch.
What is the best fire extinguisher inspection software for a fire protection company?

One that keeps each extinguisher's own record: serial, type, location, last refill and hydro test date, scanned by QR on every monthly check, with the AMC, the refill stock and the bill in the same system. Emplotec does that alongside your alarm, sprinkler and hydrant inspections, with an AI agent across it.

Is there a fire extinguisher inspection app for technicians?

Yes. The technician's app works offline in basements and pump rooms. It scans each extinguisher's QR tag, runs the checklist, takes photos against the device, prices a repair quote the client approves on the phone, and gets the report signed by OTP before the technician leaves.

How does it track hydro test dates and refills?

Every cylinder has its serial, manufacture date, last refill and next hydro test date. Due cylinders are listed by month, go to the refill bay by serial with a loaner left on site, and come back with new dates. Refill agents are kept as stock by batch.

Does it work as fire alarm inspection software?

Yes. Each panel, loop and device is on the site's register, the plan sets which devices are tested on each visit, and failed detectors or call points become deficiencies with photos and a quote.

Can it run quarterly sprinkler inspections and the five-year tasks?

Yes. Each sprinkler installation carries its plan, from quarterly checks to annual and five-year tasks, each with its checklist and readings such as main drain pressures. A closed valve or a corroded head becomes a deficiency on the report.

How do deficiencies found on an inspection become paid work?

The technician logs the deficiency with photos, the quote is priced from your rate card on the phone, and the client approves it there. Approved work becomes the next job and goes on the invoice once it is signed. Quotes waiting for approval are listed with their value.

Can our clients see their reports and certificates?

Yes. Each client's portal shows its sites, visits done against the contract, signed reports, open deficiencies and the service certificates your engineers sign. The year's pack downloads in one click for an audit or a fire NOC renewal.

Is it fire AMC software, for billing maintenance contracts?

Yes. Each AMC lists its systems, visits a year, response times and what it covers. Fees bill monthly, quarterly or yearly with the signed visits as the annexure, and each contract shows its margin before the renewal is quoted.

Does it follow NFPA 10, NFPA 25 and NFPA 72 in the US?

It keeps the records those standards ask for: extinguisher monthly inspections, annual and six-year maintenance and hydrostatic tests, sprinkler quarterly, annual and five-year tasks, and fire alarm inspection and testing. Your technicians inspect and sign; Emplotec keeps the dates and reports.

Is it fire alarm maintenance software for UK service companies?

Yes. UK companies run fire alarm servicing under BS 5839-1, extinguisher services under BS 5306-3 and emergency lighting tests under BS 5266-1, with the maintenance records the Fire Safety Order 2005 asks the responsible person to keep. It keeps a fire risk assessment's action list too, but it doesn't make the assessment.

Does Emplotec certify our inspections or file with the Civil Defence?

No. Your engineers inspect and sign, and your company issues its certificates and forms. Emplotec keeps every record, date and signed report an authority or insurer asks for, and builds the pack. It doesn't certify and doesn't file with the Civil Defence, a fire service or any authority.

Can we run installations in the same system?

Yes. Each installation is a project with its budget, materials, site progress and stage bills. At handover the devices go on the site's register, so the AMC starts with every device already recorded.

Can we keep Tally for our accounts?

Yes. Sites, inspections and AMC billing run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

What doesn't Emplotec cover for fire protection companies?

Monitoring alarm panels as a receiving centre, sprinkler design and hydraulic calculations, making fire risk assessments, route optimisation across a day's jobs and GPS tracking hardware. A reader for your panels' event logs can be built for you.

See Emplotec run your fire and life safety services business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp