AMC format: annual maintenance contract with equipment schedule
A ready annual maintenance contract between a service provider and a customer: the clauses, the equipment covered, the visits and the fee. Edit it here, or download the Excel or a blank PDF.
- Comprehensive or non-comprehensive
- Equipment and visit schedules
- Fee with GST worked out
- Free, no sign-up
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Agreement for preventive maintenance and breakdown service
Service provider
Customer
Schedule A: equipment covered
| Sr. | Equipment | Make and model | Serial no. | Location | Qty | Visits | Fee per unit | Annual fee |
|---|---|---|---|---|---|---|---|---|
| Annual fee before GST | ||||||||
Contract value
| Annual fee before GST (total of Schedule A) | |
|---|---|
| GST at 18% | |
| Contract value | |
| Payable each quarter in advance |
Schedule B: preventive maintenance visits
| Sr. | Visit and scope | Planned month | Done on | Service report no. | Engineer | Hours on site | Signed by | Remarks |
|---|---|---|---|---|---|---|---|---|
1. Scope
The service provider will keep the equipment in Schedule A in good working order by preventive maintenance visits as in Schedule B, monthly checks on the DG set, and attending breakdowns. After each visit the engineer leaves a service report signed by the customer's representative.
2. Type of contract and spares
This is a non-comprehensive contract: labour, consumables for routine service (cleaning agents, grease) and travel are included; spare parts, oils and filters are charged extra at the provider's current price list, quoted and approved in writing before fitting. In a comprehensive contract, spares other than those excluded in clause 5 are included in the fee.
3. Breakdown calls and response time
Breakdowns may be reported by phone, email or the provider's portal at any hour. An engineer will reach the site within 4 hours for a breakdown that stops production and within 24 hours for any other fault. Breakdown visits are unlimited during the term.
4. Customer's obligations
The customer will give access to the equipment during working hours, run it as the manufacturer instructs, keep a log of hours and faults, provide power, water and a safe work area, and not allow anyone else to repair it during the term without the provider's consent.
5. Exclusions
Not covered: damage from misuse, accident, fire, flood, power fluctuation or repairs by others; electrical wiring and civil work outside the equipment; overhauls and major parts (engine block, crankshaft, compressor element, chiller compressor); and relocation of the equipment.
6. Fee, GST and payment
The fee is as in Schedule A, with GST at the rate in force on the date of each invoice. It is invoiced quarterly in advance and payable within 30 days of the invoice. Spares and services outside the scope are invoiced separately.
7. Term, renewal and termination
The contract runs for the period above. It may be renewed for a further year on terms agreed in writing at least 30 days before expiry; any increase in the fee will be given with the renewal offer. Either party may end it on 60 days' written notice; fees paid for the unexpired period, less the cost of visits already made, will be refunded.
8. Liability and disputes
The provider's liability under this contract is limited to the annual fee. Neither party is liable for loss of production or profit. Disputes will first be discussed by the two contacts above, and then go to the courts at Chennai.
Agreement for preventive maintenance and breakdown service
Service provider
Customer
Schedule A: equipment covered
| Sr. | Equipment | Make and model | Serial no. | Location | Qty | Visits | Fee per unit | Annual fee |
|---|---|---|---|---|---|---|---|---|
| 1,44,000.00 | ||||||||
| 96,000.00 | ||||||||
| 85,000.00 | ||||||||
| Annual fee before GST | 3,25,000.00 | |||||||
Contract value
| Annual fee before GST (total of Schedule A) | |
|---|---|
| GST at 18% | 58,500.00 |
| Contract value | 3,83,500.00 |
| Payable each quarter in advance | 95,875.00 |
Schedule B: preventive maintenance visits
| Sr. | Visit and scope | Planned month | Done on | Service report no. | Engineer | Hours on site | Signed by | Remarks |
|---|---|---|---|---|---|---|---|---|
1. Scope
The service provider will keep the equipment in Schedule A in good working order by preventive maintenance visits as in Schedule B, monthly checks on the DG set, and attending breakdowns. After each visit the engineer leaves a service report signed by the customer's representative.
2. Type of contract and spares
This is a non-comprehensive contract: labour, consumables for routine service (cleaning agents, grease) and travel are included; spare parts, oils and filters are charged extra at the provider's current price list, quoted and approved in writing before fitting. In a comprehensive contract, spares other than those excluded in clause 5 are included in the fee.
3. Breakdown calls and response time
Breakdowns may be reported by phone, email or the provider's portal at any hour. An engineer will reach the site within 4 hours for a breakdown that stops production and within 24 hours for any other fault. Breakdown visits are unlimited during the term.
4. Customer's obligations
The customer will give access to the equipment during working hours, run it as the manufacturer instructs, keep a log of hours and faults, provide power, water and a safe work area, and not allow anyone else to repair it during the term without the provider's consent.
5. Exclusions
Not covered: damage from misuse, accident, fire, flood, power fluctuation or repairs by others; electrical wiring and civil work outside the equipment; overhauls and major parts (engine block, crankshaft, compressor element, chiller compressor); and relocation of the equipment.
6. Fee, GST and payment
The fee is as in Schedule A, with GST at the rate in force on the date of each invoice. It is invoiced quarterly in advance and payable within 30 days of the invoice. Spares and services outside the scope are invoiced separately.
7. Term, renewal and termination
The contract runs for the period above. It may be renewed for a further year on terms agreed in writing at least 30 days before expiry; any increase in the fee will be given with the renewal offer. Either party may end it on 60 days' written notice; fees paid for the unexpired period, less the cost of visits already made, will be refunded.
8. Liability and disputes
The provider's liability under this contract is limited to the annual fee. Neither party is liable for loss of production or profit. Disputes will first be discussed by the two contacts above, and then go to the courts at Chennai.
Example entries. Go back to blank to fill in your own.
What an AMC is
An annual maintenance contract (AMC) is an agreement under which a service provider maintains a customer's equipment for a year for a fixed fee: regular preventive visits, breakdown calls within a set time, and sometimes spares. It is common for DG sets, compressors, chillers, lifts, fire systems, CNC machines, computers and office equipment.
For the customer it fixes the maintenance cost and gets a committed response time. For the provider it gives steady revenue and planned visits.
Comprehensive and non-comprehensive AMC
| Comprehensive AMC | Non-comprehensive AMC | |
|---|---|---|
| Labour and visits | Included | Included |
| Spare parts | Included, except listed exclusions | Charged extra, quoted before fitting |
| Fee | Higher | Lower |
| Suits | Older equipment, or where the budget must be fixed | Newer equipment with few failures |
| Watch for | The exclusions list, which decides what "comprehensive" really covers | Spare prices: ask for the price list with the contract |
What an AMC format must contain
| Part | Why it matters |
|---|---|
| Parties, contract number and period | Who is bound, and from when to when. |
| Equipment schedule | Make, model, serial number and location of each unit. Anything not listed is not covered. |
| Scope and visit schedule | What is done at each preventive visit, how many visits, and in which months. |
| Response time | How fast an engineer reaches the site for a breakdown, by severity. |
| Spares and exclusions | Whether spares are in the fee, and what is never covered. |
| Customer's obligations | Access, proper use, and no outside repairs during the term. |
| Fee, GST and payment terms | The fee per unit, the total, GST, and when it is paid. |
| Renewal and termination | Notice to renew or end it, and what happens to fees paid in advance. |
| Liability and disputes | A cap on liability, and where disputes are settled. |
GST, TDS and stamp duty on an AMC
- GST: maintenance and repair services fall under SAC 9987, and most are taxed at 18%. A comprehensive AMC that includes spares is generally treated as a supply of service, with the spares part of it. Confirm the SAC and rate for your equipment, and check that the September 2025 rate changes did not touch it.
- TDS: a business paying for an AMC usually deducts TDS under section 393 of the Income-tax Act, 2025 (which replaced sections 194C and 194J). Which entry applies depends on whether the work is a contract for work or technical services, so agree it with your CA.
- Stamp duty: an AMC is an agreement and attracts stamp duty under the stamp act of the state where it is signed. Most states allow e-stamping. An unstamped agreement can't be relied on as evidence until duty and penalty are paid.
How to fill in this format
- Fill in the contract number, the dates and the type: comprehensive or non-comprehensive.
- Enter both parties with their GSTINs and a named contact for each.
- List every unit in Schedule A with its serial number and location, the number of PPM visits a year and the fee per unit. The total works itself out.
- Set the visit months in Schedule B. Leave Done on, report and engineer blank for each visit to fill in as it happens.
- Read clauses 1 to 8 and change them to fit: response times, spares, exclusions, payment terms and notice.
- Print two copies on stamp paper or with an e-stamp certificate, and have both parties sign with two witnesses.
Common mistakes in AMC contracts
- No serial numbers in the schedule, so a dispute over which compressor is covered has no answer.
- "Prompt service" instead of a response time in hours.
- No record of visits: if the service reports are not signed and kept, nobody can prove the PPM was done.
- Letting the AMC lapse because nobody noticed the end date. Diary the renewal two months ahead.
- Calling it comprehensive and then excluding every expensive part.
Emplotec Contracts
Or keep every AMC on one register, with its renewal in the calendar.
In Emplotec an AMC is a contract on the register, with its parties, dates, value and key terms cited to their clauses. The obligations in it are tracked, and its renewal comes up before the notice date.
- Templates per contract type, with fields filled from the record, and a clause library with approved and fallback positions.
- Obligations found in the text with citations, and SLA measures fed from the other products.
- A renewal case before the notice date, with what was billed and spent to date, performance and open issues.
- Signing with Aadhaar eSign or DocuSign, and Indian e-stamping.
- Period
- Apr 2026 to Mar 2027
- Type
- Non-comprehensive
- Value
- ₹3,83,500 with GST
- Billing
- Quarterly, in advance
- Response
- 4 h, clause 3
- Notice
- 30 days, clause 7
- PPM 1, JuneSR-0412
- PPM 2, SeptemberSR-0588
- PPM 3, DecemberDue
- Breakdown response 4 hMissed 1
Emplotec Sakthi met 6 of 7 breakdown responses and both PPM visits so far. Spares billed outside the fee: ₹1.12 lakh. Start the renewal brief?
AMC/26-27/018BD-131SR-0588The AMC for the plant's utilities, with its obligations and a renewal case opening before the notice date. Example companies, people and figures.
Questions people ask about the AMC format
What is the full form of AMC?
Annual maintenance contract: an agreement under which a service provider maintains equipment for a year for a fixed fee.
What is the difference between comprehensive and non-comprehensive AMC?
A comprehensive AMC includes spare parts in the fee, except listed exclusions. A non-comprehensive AMC covers labour and visits, and spares are charged extra.
What is the GST rate on an AMC?
Most maintenance and repair services under SAC 9987 are taxed at 18%. Confirm the classification and rate for your equipment before invoicing.
Does an AMC need to be on stamp paper?
An AMC is an agreement and attracts stamp duty under the stamp act of the state where it is signed. Most states allow e-stamping instead of physical stamp paper.
How many preventive maintenance visits should an AMC include?
It depends on the equipment and the manufacturer's service schedule: four a year is common for compressors and chillers, and monthly for DG sets. Write the months into the contract.
Can an AMC be cancelled before the year ends?
Only as the contract allows. Put a notice period in it, and say what happens to fees paid in advance.
Sources
- GST rates for services, CBIC tax information portalhttps://taxinformation.cbic.gov.in/
- Indian Contract Act, 1872, India Codehttps://www.indiacode.nic.in/
- Indian Stamp Act, 1899, India Codehttps://www.indiacode.nic.in/
- Income-tax Act, 2025: section 393 (TDS), Income Tax Departmenthttps://www.incometaxindia.gov.in/
Related
Stop typing AMCs by hand.
Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.