Software for electrical contractorsBill every metre you lay. Energise with every test on file.

For HT and LT contractors: substations, transformers, cable laying, panels, earthing, lighting, solar BOS and EV chargers. Estimates with cable take-off, drums across site stores, RA bills, test reports against limits, the inspector's approval, licences, retention and AMC, on one ERP with an agent that works across all of it.

  • Runs onProjects · Billing · Procurement · Inventory · Books · HRMS · Compliance · Field Service
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Job board22 live jobs · Wed 25 Nov · 08:40
Inspection in 7 daysVP-2611 Halvorsen Glass is booked for inspection on 2 Dec. Three of 19 pre-commissioning tests are still open.
Balance to execute₹9.84 Cr22 jobs, ₹18.6 Cr ordered
Billed in October₹1.42 CrSupply ₹0.61 Cr, erection ₹0.81 Cr
Forecast margin, all jobs13.1%−0.6 pts, copper on VP-2614
Retention held₹38.4 L₹9.6 L due back in January
Jobs by siteCost from orders, store issues, crews and subcontract bills
JobClientOrderDoneMarginNextStatus

Emplotec VP-2611 can still make its 2 Dec inspection. Retest TR-2's oil after filtration on Friday, add two rods to earth pit EP-07, and book Rahul to witness the differential relay test on Saturday.

Testing and commissioningInspector approvalsCrew allocation

In this example, Vaigai Powertech runs 22 electrical jobs from Chennai on Emplotec. A 33 kV substation is booked for inspection with three tests open, a hospital's bill waits on a signed challan, and a licence is due for renewal. Click through the estimates, stores, tests, approvals, bills, crews and licences. Example companies, people and figures.

From the cable schedule to the retention cheque.

Vaigai Powertech's 33 kV substation for Halvorsen Glass, followed from the estimate to the last receipt.

  1. The estimation desk

    Meera takes off every cable run from the schedule and prices it from last month's purchase rates.

    3.8 km of cable on EST-2641

  2. The main store

    Cable is received by drum number and length, and each cut is booked against the job.

    Drum D-118: 212 m left

  3. The cable trench

    Murugan's crew lays the 33 kV run, and Karthik files the day's metres offline.

    420 m laid on Tuesday

  4. The substation

    Every pre-commissioning test is recorded against its limit, and a failure opens a punch item.

    16 of 19 tests passed

  5. The inspection file

    Drawings, test reports and the inspector's observations sit on one tracker, stage by stage.

    Inspection booked for 2 Dec

  6. The client's engineer

    Rahul certifies RA-05 on the portal, line by line against the measurement.

    ₹44.1 L certified of ₹46.8 L

  7. The accounts

    Receipts land net of TDS, and retention waits for the end of the defects period.

    ₹38.4 L retention tracked

Does your month look like this?

These are the moments electrical contractors start looking for software. Each one is a gap between the estimate, the site, the tests and the accounts.

  • A job's margin is found at the final bill: copper went up and the cable ran longer than the drawing.

    Excel and Tally

    Every job's forecast is built from POs, store issues, crew days and subcontract bills against its estimate, so VP-2614's copper shows in November, not at handover.

  • Estimates are rebuilt from the last job's sheet, and nobody knows how far take-offs run short.

    Excel estimates

    Cable and material taken off by run and route length, priced from your own latest purchase rates, with past jobs' estimated against actual metres beside it.

  • Cable drums go missing between the main store and three sites, and cut lengths are never booked.

    Store registers

    Cable is stocked by drum number and length. Every cut is booked to a job and every offcut returned, so you know which drum covers next week's run.

  • The inspection is booked, then a test report is missing or an earth pit reads high.

    Paper test sheets

    Every test is recorded against its limit with the instrument and the witness. A failure opens a punch item, and readiness shows before the inspector arrives.

  • Bills go round the client's desk twice for a missing signed challan or measurement sheet.

    WhatsApp and email

    Supply is invoiced from signed challans and erection from certified measurement, with the documents attached. A bill stuck in passing shows how long and why.

  • Retention from three years of jobs sits in a notebook, and defects periods end unnoticed.

    A notebook

    Retention is tracked per job to the end of its defects period, and the release letter is drafted with the completion certificate attached.

  • A wireman's permit or the supervisor's certificate lapses, and a site inspection finds it.

    A drawer of certificates

    The firm's licence, supervisors' certificates, wiremen's permits and insurance sit in one register with reminders, checked before anyone is allocated to a crew.

One system for electrical contracting, from estimate to AMC.

Estimates, jobs, purchase, stores, tests, approvals, bills, crews and accounts run on one system, set up for electrical contractors. A metre laid on site reaches the RA bill, the drum's balance and the job's margin without anyone typing it twice.

Start here
  • Estimates with cable take-off and your own rates
  • Test records with punch items before inspection
  • Daily progress on mobile, offline
Emplotec Projects
  • Supply and erection lines on one order
  • Client certification on the portal
  • Bill-passing status for every invoice
Emplotec Billing
Add next
  • Budget check on every indent
  • Landed cost per metre, L1 marked
  • Factory acceptance tests tracked
Emplotec Procurement
  • Cable by drum number and length
  • Site stores per job
  • Negative stock blocked by default
Emplotec Inventory
  • Retention by job and client
  • Receivables ageing by job
  • Tally sync while you move
Emplotec Books
  • Crews by trade and day
  • Permits and certificates with expiry
  • PF, ESI and contract labour
Emplotec HRMS
When you need it
  • Approvals stage by stage
  • Licences with reminders
  • Check the challan before you pay
Emplotec Compliance
  • Installed assets with warranty
  • PPM and breakdown visits
  • Renewals at the revised price
Emplotec Field Service
Job cost reportVP-2614 Marlow Hospitals · by cost type
Export
Cost typeBudgetCommittedActualForecastVariance
Cable and accessories₹62.4 L₹18.2 L₹39.6 L₹66.5 L+₹4.1 L
Panels and RMU₹48.0 L₹6.0 L₹41.8 L₹47.8 L−₹0.2 L
Lighting₹22.6 L₹4.1 L₹16.2 L₹25.2 L+₹2.6 L
Crews and subcontract₹21.8 L₹3.0 L₹9.4 L₹21.9 L+₹0.1 L

One substation, from the estimate to the retention cheque.

Halvorsen Glass's 33 kV substation followed through every product it touches. Every step is a record you can open.

  1. 01 · Projects

    The estimate becomes the job

    Meera's estimate, with 3.6 km of HT and LT cable taken off, is won at ₹3.42 Cr. The order opens VP-2611 with its BOQ, a budget by cost type and a payment plan: 10% advance, 60% on supply, 25% on erection, 5% after energisation.

    Order SO-2611-01
  2. 02 · Procurement

    Cable and transformers are bought against the budget

    33 kV cable is bought on the rate contract with Adyar Cables. Two 2.5 MVA transformers from Southern Transformers are expedited through drawing approval and the factory acceptance test, which Ravi witnesses.

    PO-0418, PO-0422
  3. 03 · Inventory

    Drums move to site and every cut is booked

    Drums move from Ambattur to the Sriperumbudur site store on challan with an e-way bill. Senthil books each cut to its run on the cable schedule, so D-118 shows 212 m left.

    Drum D-118
  4. 04 · Projects

    Tests are recorded against their limits

    The testing team records 19 tests against the plan. Two fail and open punch items; the relay test waits for Rahul to witness it. The job is marked ready only when every critical test has passed.

    TP-2611
  5. 05 · Billing

    Measured work becomes the RA bill

    Work to 31 October is measured against the BOQ. Rahul certifies RA-05 on the portal at ₹44.1 L of ₹46.8 L claimed, and the invoice carries retention, advance recovery and its e-invoice.

    RA-2611-05
  6. 06 · Compliance

    The inspection is tracked to energisation

    Deepa files the test reports for the inspection on 2 December. Observations are closed on the tracker, and the approval to energise goes on file with the service connection.

    Approval file VP-2611
  7. 07 · Books

    Cash in, retention tracked

    Halvorsen pays RA-05 net of TDS. The receipt matches the invoice, ₹2.2 L more retention is held to the end of the defects period, and the job's margin updates.

    Receipt RCT-1182

Ask across every job.

Emplotec reads the estimates, stores, tests, approvals, bills, crews and accounts at once. It answers with the records it used, and anything it would change or send waits for your approval.

  • Not yet. Retest TR-2 on Friday, add two rods to EP-07 on Thursday and witness the relay test with Rahul on Saturday. Then all 19 pass before the inspection.

  • VP-2614 Marlow Hospitals is at 9.8% against 13.5%. Raising VO-02 and claiming price variation on LT cable recovers ₹5.9 L.

  • ₹11.7 L. Both release letters are drafted with the completion certificate attached.

  • Three lapse. Renewal tasks with the forms are drafted for Divya, Murugan's first.

EmplotecAcross the business

Is VP-2611 ready for the inspection on 2 December?

ReadTest recordsPunch listApprovals trackerInstruments
  1. Checking each critical test
  2. Listing punch items
  3. Fitting work into the crews' week
  • TR-2 oil BDV failed, retest needed
  • EP-07 above its limit
  • Relay test not witnessed

Not yet. Retest TR-2 on Friday, add two rods to EP-07 on Thursday and witness the relay test with Rahul on Saturday. Then all 19 pass before the inspection.

VP-2611 · ready by 28 NovWaiting for you
  • Retest and rodsNot bookedThu and Fri
  • Relay witnessNoneSat 10:00
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your way of testing, billing and building.

Emplotec fits the way your firm runs its jobs at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Test recordTST-2611-012Earth pit EP-07 · VP-2611 · 24 Nov
Method
Fall of potential
Measured
1.6 Ω
Limit
1.0 Ω
Instrument
ET-1185
Witness
Rahul Bose
Result
Failed
Configure it
  • Soil conditionDry, red soil
  • Calibration due2 Dec 2026
  • Client witness signature
Set your rules
  • Block 'ready for inspection' while a critical test is failed or unwitnessed
  • Tell the projects head when an earth pit reads above its limit
Your industry's extension
  • Test plans by equipment with limits by voltage class
  • Inspection and service-connection tracker
Yours alone
  • Print Halvorsen's own commissioning format
  • Halvorsen jobs: no energising without their safety officer's sign-off

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your firm needs something outside the ERP, our team builds it and connects it to Emplotec, under the same support.

  • Results imported from your test instruments' export files
  • A cable voltage-drop and sizing calculator linked to the estimate
  • Your client's vendor portal, connected for bill submission
  • Your old estimating sheets moved and kept searchable

Built for the rules where you install.

Your country's tax, statutory and trade records are part of the system. Emplotec keeps the records; the inspector, the scheme or the authority approves, and your firm files.

India

  • Test reports kept for the Electrical Inspector's inspection of installations above 650 V, and self-certification reports for 650 V and below, under the CEA safety regulations of 2023
  • Contractor licences by grade, supervisors' competency certificates and wiremen's permits from the state licensing board, with expiry
  • Wiring and earthing test records kept against IS 732 and IS 3043
  • GST e-invoices on supply and RA bills, e-way bills on material moved to site
  • TDS on receipts and subcontractor bills, under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF on the Labour Codes, and contract labour under the OSH Code
  • MSME payment dates, and Tally sync if your accounts stay there for now

Live in 30 days, without stopping a site.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which jobs, stores and companies. The system is set up for electrical contracting, then fitted to your firm's own estimates, test sheets and bill formats.

  1. We map your jobs first: estimates, orders, stores, tests, approvals and how bills are made today.
  2. Open orders, drum stock by store, retention, advances, licences and accounts come across from Tally and Excel.
  3. We fit the estimate, the test sheets and the RA bill formats to the way you work.
  4. Engineers and storekeepers train on their own job's data, then go live job by job.
What is the best software for electrical contractors?

For a firm that installs and commissions HT and LT work, one that puts the estimate, the job, the stores, the tests, the inspection, the bills and the accounts on one record. Field service apps handle service calls well; Emplotec also covers substations, cable by the drum, RA bills with retention and test records against limits, fitted to your firm's way of working.

Does it do electrical estimating with cable and material take-off?

Yes. Cable is taken off by run and route length with a wastage allowance per size, material and labour by trade are added, and rates come from your own latest purchase prices. Past jobs show estimated against actual metres, and the won estimate becomes the job's budget.

What is the difference between electrical contractor software and an ERP for electrical contractors?

Electrical contractor software usually means quoting, scheduling and invoicing. An ERP for electrical contractors also runs purchase, stores, payroll and the accounts on the same records, so each job's margin, retention and cash flow are known without exports. Emplotec does both in one system.

Does it keep test reports and the inspector's approval?

Yes. Insulation resistance, earth resistance, transformer, cable, relay and breaker tests are recorded against their limits with the instrument and the witness. A failed test opens a punch item, and the approvals tracker holds each stage up to the approval to energise. Emplotec keeps the records; the inspector approves and your firm files.

Can it bill supply on delivery challans and erection through RA bills on one order?

Yes. One order carries supply and erection lines and a payment plan. Supply is invoiced from signed delivery challans, erection from measurement certified by the client on the portal, with retention, advance recovery and e-invoices.

Does it track cable drums across site stores?

Yes. Cable is stocked by drum number and length in the main store and every site store. Each cut is booked to a job and each offcut returned, so you can see which drum covers the next run.

Does it hold our contractor licence and the wiremen's permits?

Yes. The firm's licence by grade, supervisors' certificates, wiremen's permits, insurance and client enlistments sit in one register with owners and reminders, and crews are checked against it before they are allocated.

Does it handle solar BOS and EV charger installation jobs?

Yes. They run as jobs like any other: structures, inverters, DC and AC cable, chargers and feeders on the BOQ, with their own tests, the service-connection tracker and AMC after handover.

Can we run AMC on the substations we install?

Yes. After handover the installed equipment becomes assets under an AMC with PPM visits, breakdown calls and response times, and the signed service report becomes the invoice (Field Service).

Can we keep Tally for our accounts?

Yes. Jobs, stores, tests and billing run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

Does it work for electrical contractors in the UAE, UK and US?

Yes. In the UAE it handles VAT, e-invoicing, corporate tax and WPS payroll, and holds DEWA and TAQA Distribution approvals. In the UK it keeps EICs and EICRs to BS 7671 with VAT under Making Tax Digital and PAYE. In the US it tracks permits, inspections and state licences with sales tax and 1099 forms.

What doesn't Emplotec do for electrical contractors?

It doesn't design installations or calculate loads and cable sizes, and it isn't a certifying body: it doesn't issue certificates, approve installations or file with an inspectorate or authority. It keeps every record those steps need.

See Emplotec run your electrical contractors business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp