Fix it before it stops the work.

Preventive plans, breakdowns, spares and costs for every machine, vehicle and building asset, with a history card that shows what each one costs you.

Work requestsPlant 2 · Hosur · 5 openListBoard
  • BRK-318DownCNC-07 · 5-axis millSpindle grinding, alarm 2041 Murugan · 10:40
  • REQ-1164PM dueCompressor CP-02Run hours 1,968 of 2,000Meter · 09:15
  • REQ-1163OpenDG set 2Oil seepage at the sump Senthil · 08:20
  • REQ-1161AssignedForklift FL-03Horn not working Selvi · Tue
  • REQ-1158AssignedTool room ACNot cooling below 26 °CHelpdesk · Tue
CNC-07 · 5-axis millNW-M-0107 · Plant 2, Line 3 · criticality ABack by Thu 14:00
Reported by scan · Murugan, operator · 10:40Spindle making a grinding noise, alarm 2041 on the controller.Was running WO-5530 · Haldane Pumps, 200 valve bodies 1 photo attached
From the history card
14 AugSpindle alarm 2041 · bearing wear · bearings replaced11.5 h
21 OctPM · 500 h service, within limits3.0 h
WO-M-1182 · breakdown · highAssigned
Failure
Spindle · bearing wear · replace pair
People
Ganesh Kumar, with the Kongu AMC engineer
Parts
Bearing 7014 × 2: 1 from stores, 1 on MR-2207
Permit
Electrical isolation, before work starts

Murugan scans CNC-07's tag when its spindle starts grinding. Emplotec checks the history card, the spares and the AMC, drafts the work order and a spares request, and once Vijay, the maintenance head, approves, the repair is on. Example companies, people and figures.

Maintenance management software for everything you own.

Machines, vehicles, building plant, tools and laptops on one register, each with its plans, breakdowns, spares, documents and cost.

One register

Every asset is recorded once, for the maintenance team and for accounts.

  • Machines, vehicles, building plant, tools and IT devices
  • A QR tag on every asset, with location and custodian
  • Warranty, AMC and insurance from the contract register
  • Depreciation in Books, with movements and disposal
  • Devices issued at joining and returned at exit
  • Physical verification by scan, for CARO 2020

Planned maintenance

Preventive work is planned before anything breaks, around the production schedule.

  • PM by calendar, run hours or odometer
  • Condition-based PM on thresholds you set
  • Readings from people, job cards, IoT gateways and GPS providers
  • A planned-work calendar with idle shifts
  • Statutory inspections on the compliance calendar

Breakdowns, fixed fast

Anyone reports a fault by scanning the tag, and the technician starts with the history and the spares.

  • Fault reports by QR scan, with a photo
  • Failure codes: problem, cause and remedy
  • Spares issued from stores to the work order
  • Downtime into capacity and OEE
  • MTBF, MTTR and cost per asset, for repair or replace

Work orders on the phone

Technicians work their orders on the mobile app, offline where the signal drops.

  • Checklists with readings and photos
  • Permits to work: hot work, confined space, electrical isolation
  • Parts and time on every order
  • Signed off by the maintenance head

Fleet

Every vehicle's documents, fuel and trips, with what it costs per km.

  • RC, PUC, fitness, permits, road tax and FASTag, with reminders
  • Fuel log and fuel efficiency
  • Trip log, and the vehicle on the e-way bill
  • Cost per vehicle and per km
  • Odometer readings from your GPS provider

Clients' sites and equipment on hire

Service the assets you maintain for others, and bill the equipment you hire out.

  • Clients' assets at their sites, under AMC
  • PPM schedules, visits and service reports the client signs
  • Service requests from the customer portal
  • Equipment hire billed by hours, days and km
  • AMC invoices through Billing

CMMS software with a history card for every machine.

Every breakdown, PM, spare and hour of downtime lands on the asset's history card, with MTBF, MTTR and what it has cost you to date. When the same alarm comes back, the technician sees what fixed it last time, and you see whether to repair or replace.

  • Problem, cause and remedy on every breakdown
  • MTBF and MTTR from the records
  • Cost to date: spares, labour and AMC
  • The next PM, by date or run hours
  • Repair or replace, from the history card
CNC-07 · 5-axis millHistory card · NW-M-0107 · Plant 2, Line 3Running
History cardPlansMetersDocumentsContracts
MTBF540 hlast 12 monthsMTTR9.0 h7 breakdownsDown63 hlast 12 monthsCost to date₹9,42,000since Mar 2019
Maintenance cost by monthBreakdownPM
020K40K60KDecJanFebMarAprMayJunJulAugSepOctNovSpindle: 4 of 7 breakdowns
DateWhat happenedDownCost
12 NovBreakdownSpindle grinding, alarm 2041 · bearing wear · bearings 7014 replacedWO-M-118227.3 h₹48,600
21 OctPM500 h service · all checks within limitsWO-M-11213.0 h₹9,200
6 OctBreakdownSpindle overheating · coolant line blocked · flushedWO-M-11036.5 h₹38,400
14 AugBreakdownSpindle alarm 2041 · bearing wear · bearings replacedWO-M-091711.5 h₹44,900
Next PM500 h service at 4,500 h · around Sun 22 Nov4,414 h
Repair or replace
Last 12 months₹3,14,000and 63 h downSpindle rebuild₹4,60,000Kongu quoteNew machine₹74,00,000book value ₹38,20,000

Four of seven breakdowns were the spindle. A rebuild costs less than another year like this one; a new machine isn’t worth it yet.

Drafted for Anand’s approval

Preventive maintenance software that plans around production.

PM plans run by calendar, by run hours from job cards, or when a reading crosses a threshold you set. The planned-work calendar shows the production schedule, so each PM lands in an idle shift instead of stopping an order.

  • By calendar, meter or condition
  • Run hours from job cards, odometer from GPS providers
  • Readings from people and IoT gateways
  • Idle shifts from the production schedule
  • Checklists, parts and skills on every plan
Planned workPlant 2 · week 47 · 16 to 22 NovWeekMonth
Asset and triggerMon 16Tue 17Wed 18Thu 19Fri 20Sat 21Sun 22Idle
CNC-07Every 500 h · 4,414 hMoved500 h
Compressor CP-02Every 2,000 h · 1,968 hMoved2,000 h
VMC-02Vibration over 4.5 mm/s · 3.9
DG set 2MonthlyMonthly
EOT crane 5 TQuarterly · statutoryInspection
Forklift FL-03Every 250 h · 236 h250 h
Production, from the scheduleBy calendarBy meterBy condition
Move 2 PMs to Sunday’s idle shift

CNC-07’s 500 h service would stop WO-5546 on Thursday, and CP-02’s would stop Line 3 on Wednesday. Sunday is idle, and the filters and oil are in stores.

Approved by Vijay Raghavan

Work order management software on the technician's phone.

Each work order reaches the technician's phone with its checklist, permit, parts and the asset's history. They scan the tag to start, record readings and photos, and finish it offline if the signal drops. The maintenance head signs it off.

  • Scan the QR tag to open the order
  • Checklists with readings and photos
  • Permits to work, with isolation steps
  • Parts issued from stores, time logged
  • Works offline, syncs when back
Permit to workPTW-0412 · isolationCNC-07, Line 3Closed
  • Main supply isolated at MCC-3
  • Lock L-17 and tag by Ganesh Kumar
  • Zero energy checked

VRIssued by Vijay Raghavan, 08:05

Adds to the history card
Downtime, into OEE
27.3 h
Parts from stores
₹40,400
Own labour
₹8,200
AMC engineer
Covered

Fixed asset management software, shared with accounts.

The register maintenance uses is the fixed asset register in Books, with cost, depreciation and book value on the same record. Depreciation runs under the Companies Act and the Income-tax Act side by side, and a physical verification by scan gives the auditor the discrepancy report CARO 2020 asks for.

  • One register for finance and maintenance
  • Companies Act and Income-tax depreciation
  • Additions, movements and disposals posted to Books
  • Devices issued at joining, returned at exit
  • Physical verification by scan, for CARO 2020
Fixed asset registerNordwerk Components · as at 31 Oct 2026Companies ActIncome-tax
All 1,284Machines 318Vehicles 22Building plant 64Tools 412IT devices 468
Gross block₹38.4 CrNet block₹21.7 CrDepreciation, Apr to Oct₹1.46 Cr
AssetWhere, or held byBook valueNext dueVerified
CNC-07 · 5-axis millNW-M-0107Plant 2, Line 3₹38,20,000of ₹68,40,000PM · 22 NovFound
Truck, 10 tonneTN 70 AB 4421Transport, Hosur₹14,60,000of ₹26,50,000Insurance · 28 NovFound
DG set, 500 kVANW-B-0031Utilities, Plant 2₹9,80,000of ₹18,20,000AMC · 31 MarFound
Laptop, 14-inchNW-IT-0418Karthik, since joining₹42,300of ₹96,000Warranty · Jun 2027Found
Torque wrench setNW-T-0092Tool room, Plant 2₹18,400of ₹46,000–Not found
5 of 1,284 · sorted by verification
Physical verification · FY 2026-271,279 of 1,284
Plant 2, Hosur612/615
Plant 1, Hosur402/404
Chennai office265/265
3 not found2 moved

The torque wrench set was last issued to Murugan on 2 Oct.

Discrepancy report for CARO 2020

Maintaining clients' equipment? See Field Service.

If you maintain equipment at your clients' sites under AMC, Emplotec Field Service runs that work: the installed base, service contracts, the dispatch board, the technician's app and billing. It shares this asset register and work order engine, so a client's equipment and your own plant keep one history.

  • Clients' assets by site, under AMC
  • PPM schedules and visits
  • Service reports signed by the client
  • PPM compliance and requests on the portal
  • Service jobs and AMC billing in Field Service
Service report SR-20931AMC-2026-114 · Orion Tech Park, Block BSigned by client
AssetChiller CH-2 · 300 TRVisitMonthly PPM · Wed 11 NovOn site09:30 to 11:40
CheckReadingLimitResult
Suction pressure4.1 bar3.5 to 4.5Within
Discharge pressure12.6 barup to 14.0Within
Condenser approach2.8 °Cup to 3.0Within
Compressor current212 Aup to 230Within
Vibration, motor end5.2 mm/sup to 4.5Follow-up REQ-2214
Dinesh Kumar engineer · 11:40
Kavya Rao facility manager · 11:52
Orion Tech ParkCustomer portal · Bayline
PPM compliance, November96%

46 of 48 visits done

  • SR-20931 Chiller CH-2Signed 11:52
  • REQ-311 Lift L3 door noiseOpen
  • Next Lifts L1 to L418 Nov

Built for the rules where your assets are.

The register posts depreciation and asset purchases through Books, so each company follows the rules of its own market.

Companies Act and Income-tax, side by side.

Depreciation runs under Schedule II of the Companies Act and the Income-tax blocks from one register, and a physical verification by scan gives you the discrepancy report CARO 2020 asks for.

  • Depreciation under the Companies Act, Schedule II
  • Income-tax blocks of assets
  • Physical verification with a CARO 2020 discrepancy report
  • RC, PUC, fitness, permits, road tax and FASTag reminders
  • The vehicle on the e-way bill
  • GST on asset purchases and AMC invoices, through Books
ERP in India
  1. 1

    CNC-07 capitalised in plant and machinery

    NW-M-0107
    Capitalised
  2. 2

    Depreciation under Schedule II, posted to Books

    DEP-2026-10
    Posted
  3. 3

    Income-tax block depreciation alongside

    Block · 15%
    Computed
  4. 4

    Physical verification by scan at Hosur

    PV-2026-27
    Done
  5. 5

    Discrepancy report for CARO 2020

    CARO 2020
    Ready

Hand Emplotec the triage.

Ask in plain words. Emplotec reads the history card, the spares, the contracts and the schedule, then shows you a plan. Nothing changes until a person approves, and no work order closes without one.

  • “Why does CNC-07 keep breaking down?”

    It reads the failure codes, the history card, shifts and spares used, and shows the pattern: spindle bearings, four times this year.

  • “Plan next week's PM around the production schedule.”

    It places each PM in an idle shift and flags any it can't fit, for the maintenance head to approve.

  • “Which vehicles' documents expire this month, and which trips are booked on them?”

    Each vehicle with the document due and its booked trips, and the renewal reminders drafted.

  • “Who leaving this month still holds a company laptop?”

    Each leaver with the devices on their name, so exit clearance waits until they're returned.

Only on Emplotec

EmplotecAsk anything about the business
Anand Krishnan, Managing director

Which machines cost us the most this year in repairs, spares and lost production, and which customer orders did their breakdowns delay?

ReadHistory cardsSpares issuedJob cardsScheduleSales ordersLedger
  • CNC-07: ₹3,14,000 in repairs and spares, 63 hours down
  • BRK-318 moved SO-2238's promise date to 21 Nov
  • VMC-02 and compressor CP-02: every PM on time, no breakdowns
  • Spindle rebuild quoted by Kongu Machine Tools at ₹4,60,000

CNC-07 cost the most, and four of its seven breakdowns were the spindle. A rebuild costs less than another year like this one. I've drafted the capex request for your approval.

Review capex requestWaiting for your OK

A CMMS sees the work order, not the lost production or the late order. Emplotec has the repairs, the schedule, the orders and the ledger on one record.

From a meter reading to the cost on the card.

Job cards take the compressor past 2,000 run hours, the PM reaches the technician's phone, a high reading is planned into Sunday's idle shift, and the cost lands where finance can see it.

  1. Manufacturing

    Job cards take CP-02 past 2,000 run hours

    CP-02 · 2,004 hPM due
  2. Assets & Maintenance

    Ganesh scans the tag and works the checklist

    WO-M-1190Done
  3. Inventory

    An air filter is issued from stores to the order

    ISS-5540Issued
  4. Manufacturing

    A high bearing reading: follow-up in Sunday's idle shift

    WO-M-1191Planned
  5. Books

    The cost posts to CP-02 and its history card

    CP-02 · ₹7,850Posted

Works with the rest of Emplotec

Deep enough for the plant and the auditor.

What a maintenance spreadsheet and a standalone CMMS leave out is built into the core.

  • PM by calendar, meter and condition

    Run hours from job cards, odometer readings, and thresholds on readings from people, IoT gateways and your GPS provider.

  • Permits to work on the work order

    Hot work, confined space and electrical isolation, with the isolation steps done and recorded before the work starts.

  • Failure codes behind MTBF and MTTR

    Problem, cause and remedy on every breakdown, so MTBF, MTTR and the repeat faults come from the records, not a guess.

  • Statutory inspections on the calendar

    Lifts, hoists, pressure vessels and boilers sit on the compliance calendar with their certificates, before they fall due.

  • Companies Act and Income-tax, side by side

    The fixed asset register runs depreciation under Schedule II and the Income-tax blocks together, posted to Books.

  • Physical verification for CARO 2020

    Scan every tag by location. Emplotec lists what was found, missing and moved, with photos, as the discrepancy report.

Shaped around how you maintain.

Our team fits Assets & Maintenance to your plant when you start, and Emplotec changes it on request once an admin approves.

  • Asset classes and their fields
  • PM plans and checklists
  • Failure codes
  • Permit types and their steps
  • Approval of capex and scrapping
  • QR tag formats
  • Client report formats

Assets & Maintenance: questions buyers ask

Is this a CMMS or a fixed asset register?

Both, on one register. Maintenance sees plans, breakdowns, spares and the history card; finance sees cost, depreciation and book value. Because it's one record, an asset scrapped on the floor is disposed of in the books by the same document.

Can technicians and operators use it on the floor?

Yes. Anyone on a seat or on HRMS reports a fault by scanning the asset's QR tag, free. Technicians work their orders on the Android and iOS app, with checklists, readings, photos, parts and time, and it works offline where the signal drops.

Does it read meters and sensors?

Yes. Run hours come from job cards and odometer readings from your GPS provider; readings also come from people and IoT gateways. Condition-based PM starts when a reading crosses a threshold you set. Emplotec doesn't build predictive models from sensor data.

Does it handle a fleet?

Yes. Each vehicle carries its RC, PUC, fitness, permits, road tax and FASTag with reminders before they lapse, a fuel log and trips, and its cost per vehicle and per km. Fuel cards are matched to vehicles in Emplotec Expense. Emplotec doesn't cover GPS hardware, route planning or tyre management.

Can we run AMCs at our clients' sites?

Yes, with Emplotec Field Service, which shares this asset register and work order engine. Each client's assets sit at their site under a contract with a PPM schedule. Technicians log visits, the client signs the service report, and the client sees PPM compliance and raises requests on the customer portal. Invoices go out through Billing.

Does it handle physical verification for CARO 2020?

Yes. Your team scans every tag by location on the mobile app. Emplotec lists what was found, missing and moved, with photos, and builds the discrepancy report from the same register finance uses for depreciation.

Does Emplotec close work orders or scrap assets on its own?

No. Emplotec triages breakdowns, drafts work orders and spares requests, and plans PM around production. A person approves the plan, signs off every work order, and approves any scrapping or capex.

How do we bring our existing asset register across?

The register, opening book values and accumulated depreciation come in from Tally or spreadsheets by bulk import, with a dry run you check before anything posts. PM schedules and open work orders come across the same way.

How is Emplotec Assets & Maintenance priced?

It's licensed as a product, with the fixed asset register and depreciation included. Planners and engineers use full seats, technicians use team seats, priced lower, and fault reports by scan are free. It's never priced per asset or per vehicle. We quote once we've seen how you maintain.

See Assets & Maintenance on your own numbers.

Tell us how your business runs, and we’ll show you Emplotec Assets & Maintenance working the way you do.

  • A call within one working dayFrom the people who build it, not a sales team.
  • Your data moved in 48 hoursLive in 30 days. Your proposal says what “live” covers.
  • Cloud or your own serversThe same build either way, with your own database.
WhatsApp