Free templateService and maintenance
Work order template for maintenance and repairs, free in Excel, Word and PDF
A work order turns a request for maintenance or repair into a job someone is assigned, with the asset, the tasks, the parts and the hours on one record. Fill this one in on the page, or download it.
- Tasks, parts and labor hours
- Lockout/tagout field
- Excel with cost formulas
- Free, no sign-up
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Corrective, preventive or service work on one asset
Asset
Problem and safety
Tasks
| No. | Task | Done by | Hours | Done |
|---|---|---|---|---|
| Total hours | ||||
Parts used
| Part no. | Description | Qty | Unit | Unit cost | Amount |
|---|---|---|---|---|---|
| Parts total | |||||
Labor
| Technician | Craft | Date | Hours | Rate | Amount |
|---|---|---|---|---|---|
| Labor total | |||||
Completion notes
Corrective, preventive or service work on one asset
Asset
Problem and safety
Tasks
| No. | Task | Done by | Hours | Done |
|---|---|---|---|---|
| Total hours | 3.50 | |||
Parts used
| Part no. | Description | Qty | Unit | Unit cost | Amount |
|---|---|---|---|---|---|
| 1,486.00 | |||||
| 38.50 | |||||
| 112.00 | |||||
| Parts total | 1,636.50 | ||||
Labor
| Technician | Craft | Date | Hours | Rate | Amount |
|---|---|---|---|---|---|
| 147.00 | |||||
| 23.00 | |||||
| Labor total | 4 | 170.00 | |||
Completion notes
Rotary union seals worn at 18,400 spindle hours. Pressure switch checked and alarm reset. Recommend adding a union inspection to the 2,000-hour preventive maintenance.
Example entries. Go back to blank to fill in your own.
What a work order is
A work order is the document that authorizes and records a piece of maintenance or repair work. It says which asset, what is wrong, who will fix it, by when and how urgently, and when the job is done it records what was done, the parts used, the hours spent and who signed it off.
It usually starts as a work request: an operator reports a leak or a noise. A maintenance planner or supervisor reviews the request, sets the priority and turns it into a work order. Preventive maintenance work orders skip that step and are raised on a schedule, by calendar or by meter reading.
What to include on a work order
| Field | Why it matters |
|---|---|
| Work order number and date | A unique number for each job, so it can be tracked, costed and found later. |
| Requester and department | Who reported it, so the technician can ask questions and hand the asset back. |
| Asset ID, description and location | Ties the job to the asset's history, so repeat failures show up. |
| Problem reported | The symptom in the requester's words, before anyone diagnoses it. |
| Work type and priority | Corrective, preventive, emergency or inspection, and how fast it must be done. |
| Safety: lockout/tagout and permits | The energy control procedure and any hot work or confined space permit the job needs. |
| Tasks | Each step, who did it and the hours, so the next technician can follow the same fix. |
| Parts used | Part numbers, quantities and cost, for the job's cost and for restocking. |
| Labor hours | Hours by person and craft, for the job's cost and for planning. |
| Completion, downtime and failure code | When the asset was back, how long it was down, and why it failed. |
| Sign-off | The technician, the supervisor and the requester, who confirms the asset works. |
Work order types and priority levels
- Corrective: something has broken or is not working right.
- Preventive: scheduled work by calendar or meter, such as lubrication, filter changes and inspections.
- Emergency: an immediate safety risk or a line stopped, worked before anything else.
- Inspection: a check that may raise its own corrective work order.
- Safety or compliance: guarding, eyewash stations, fire equipment and similar items.
| Priority | Meaning | Typical response |
|---|---|---|
| 1, emergency | A safety hazard, or production or a critical asset is stopped | Start immediately |
| 2, urgent | The asset is down or degraded, with a workaround | Within 24 hours |
| 3, normal | The asset works, but needs repair | Within a week |
| 4, scheduled | Can wait for planned downtime or the next PM | Next planned shutdown |
How to fill in this work order template
- Give the work order the next number in your series and write the date and time the request came in.
- Fill in the requester, the asset ID, its location and the meter reading, and copy the problem as it was reported.
- Set the work type and priority, assign a technician and set a due date.
- Note whether the job needs lockout/tagout, and the procedure number, and any permits.
- As the work is done, list each task with the hours, the parts used and the labor. The Excel version works out the parts and labor totals.
- Record the completion time, the downtime and a failure code, then get the supervisor's and the requester's signatures.
Lockout/tagout on maintenance work orders
OSHA's standard on the control of hazardous energy, 29 CFR 1910.147, covers servicing and maintenance where a machine could start up or release stored energy unexpectedly. Employers need written energy control procedures, training for the people who apply locks, and an inspection of each procedure at least once a year.
Putting the procedure number on the work order is not a legal requirement, but it is good practice: the technician sees which procedure applies before starting, and the record shows it was followed.
Work order, work request and purchase order
| Work request | Work order | Purchase order | |
|---|---|---|---|
| What it is | A report that something needs attention | An authorized job with tasks, parts and hours | A commitment to buy goods or services |
| Raised by | Anyone: operators, staff | Maintenance planner or supervisor | Purchasing |
| Approves | Nothing yet | The work and its priority | The spend with a supplier |
| Links to | The work order it becomes | The asset, the request, and any PO for parts or a contractor | The supplier's invoice |
What work orders tell you
Closed work orders are the raw data for maintenance decisions, as long as the downtime, failure code and costs are filled in.
- Mean time to repair (MTTR): total repair time divided by the number of repairs.
- Mean time between failures (MTBF): operating time divided by the number of failures.
- Preventive maintenance compliance: PM work orders done on time, as a share of those due.
- Backlog: open work orders, in labor hours, against the hours your team has.
- Cost per asset: parts and labor over time, which shows when repairing costs more than replacing.
Emplotec Assets & Maintenance
Or raise the work order by scanning the machine.
In Emplotec, a breakdown is reported by scanning the asset's QR tag, and the work order that follows carries its checklist, permits, parts and time to the asset's history card.
- Breakdown tickets and fault reports start from a scan of the asset's QR tag.
- Work orders carry checklists, permits to work, parts and time, and the technician's mobile app works offline.
- Preventive maintenance runs by calendar or meter, and downtime feeds capacity and OEE.
- Failure codes give you MTBF and MTTR, and the machine history card shows what each asset costs you.
P3P3Nov 9Nov 10T. Brooks7 days1.5 hEmplotec WO-26-01847 used the last rotary union in stores. Draft a reorder for two, and a change to the 2,000-hour PM for MC-0417, for your approval?
WO-26-01847PM-MC-0417The maintenance board for Plant 1, with one corrective work order waiting on a part. Example companies, people and figures.
Questions people ask about the work order format
What should a maintenance work order include?
A number and date, the requester, the asset and its location, the problem, the work type and priority, the person assigned, the tasks, parts and labor hours, the completion time and downtime, and sign-off by the technician and supervisor.
What is the difference between a work request and a work order?
A work request is a report that something needs attention, and anyone can raise one. A work order is the authorized job that follows, with a priority, a technician, tasks and a record of the parts and hours used.
Who approves a work order?
Usually a maintenance planner or supervisor approves it and sets the priority. Larger jobs, or those needing a contractor or capital spend, often need a manager's approval too, and the requester confirms the asset works at the end.
How do I number work orders?
Use one running series that never repeats, often with the year, such as WO-26-01847. Some sites keep a separate series for preventive work orders, such as PM-26-0412.
Does a work order need lockout/tagout?
When the work involves servicing a machine that could start up or release stored energy, OSHA's 29 CFR 1910.147 requires an energy control procedure. Writing the procedure number on the work order makes sure it is used and recorded.
Can I use this work order template in Excel?
Yes. The Excel download has the same fields, and it works out the parts and labor amounts and their totals as you type quantities, costs and hours.
Sources
- OSHA: 29 CFR 1910.147, the control of hazardous energy (lockout/tagout)https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.147
- OSHA: control of hazardous energy, overviewhttps://www.osha.gov/control-hazardous-energy