ERP for the automotive industry: component manufacturersEvery rejection traced to its machine. Every schedule shipped in full.
For Tier 1 and Tier 2 suppliers: the OEM's schedule and cumulative, PPAP and control plans, rejection debits and 8D, returnable bins, consignment stock at the OEM and job work at the platers, on one system with your stores and accounts, and an agent that works across all of it.
- Runs onManufacturing · Inventory · Quality · CRM & Sales · Procurement · Books · Assets & Maintenance · HRMS · Planning
- Fitted to youYour fields, rules, documents and screens
- Going liveData moved in 48 hours, live in 30 days
This is the app. Click any page on the left, and ask Emplotec on each one.
- Rahul Bose, Varuna raised RN-55102: 240 CB-14 with bore above 32.025 mm, from ASN 88213
- Emplotec traced ASN 88213 to WO-7714, HMC-03, night shift of 2 Nov
- Emplotec found 840 more from WO-7714 in finished goods and 480 at Varuna on ASN 88241
- Arun Pillai loaded today's CB-14 truck from WO-7726, not WO-7714
Emplotec The boring insert on HMC-03 ran 640 pieces past its 2,000-piece life on the night of 2 November. Hold what's left of WO-7714, sort the 480 at Varuna today, and ship 240 replacements on tomorrow's 06:00 truck.
RN-55102WO-7714Tool life logIn this example, Indrayani Auto Components runs its Chakan plant on Emplotec. Varuna Motors rejected 240 caliper brackets overnight, and Emplotec has traced them to one work order, one machine and one worn insert. Click through schedules, dispatch and bins, consignment, 8D, PPAP and job work. Example companies, people and figures.
From the call-off to the OEM's payment.
Emplotec follows each part from Varuna's schedule through the cells, the platers and the bins, and people approve every plan it drafts.
Varuna's schedule
Each schedule revision is read into lines, and the cumulative is kept per part.
CB-14: 12,000 in November
The machining cell
Varuna's 240 rejects trace to HMC-03's worn insert, so Emplotec plans the hold and replacements.
Saturday's 06:00 truck, for approval
The plater
Kestrel's peel rejects trace to Moshi's plating lot, so a debit note is drafted.
₹21,600 back to Moshi
Dispatch and bins
The ASN, e-invoice and e-way bill leave together, and every bin is counted out.
DSP-4480: 720 CB-14, 36 bins
Consignment at Varuna
Varuna's weekly consumption report is drafted as an invoice the day it lands.
2,388 knuckles, ₹30,56,640
The accounts
Varuna pays net of the debit, and the cumulative, debit and ledger agree.
Debit ₹1,38,240 on RN-55102
Does your month look like this?
These are the moments auto component suppliers start looking for a new system. Each one costs a debit, a bin charge or an audit finding.
A rejection debit lands from the OEM's line, and it takes two days to find which lot, machine and shift it came from.
Registers and WhatsAppEvery dispatch carries its lot. Emplotec traces a rejection to the work order, machine, tool and operator the same day, and shows what else from that lot is here or at the customer.
The OEM says you are 600 behind on the cumulative. Your Excel says 200.
ExcelCumulative per part from every ASN, return and rejection, against each schedule revision. The OEM's export is read into schedule lines, so nothing is retyped.
The supplier audit is next week, and the PPAP files and control plans are on one engineer's laptop.
Folders and a QMS on the sidePPAP packs, AIAG-VDA PFMEAs, control plans, gauges and layered audits live with the part, on the same system as the job cards and the stock.
The OEM charges you for 64 bins at year end, and nobody can prove where they went.
A bin registerEvery bin is counted out on the ASN and back on the gate entry, including bins that go to the plater with your parts.
Consignment stock at the OEM's plant is invoiced a week late because the consumption report sits in someone's inbox.
Email and TallyThe consumption report is read into lines, matched to lots at the OEM's store and drafted as an invoice the day it arrives.
Parts sit at the plater and the heat treater for weeks, and the 36 rejects nobody can pin on a lot.
Challan booksJob work out and back with lot numbers, ageing, rejects by job worker and ITC-04 from the same records. A complaint traces to the plating lot.
The OEM revises the steel price from 1 October in December, and three months of supplementary invoices are made by hand.
Excel and TallyThe revision is entered once with its effective date. Every invoice since then is listed, and supplementary invoices or credit notes are drafted with GST for a person to approve.
A new part's launch slips because the APQP tracker, the trial results and the OEM's drawing changes live in different files.
Excel trackersAPQP phases for each new part, with feasibility, PFMEA, control plan, MSA, run at rate and PSW on one record, and the OEM's drawing changes handled as ECNs.
The automotive ERP, from the schedule to the debit note.
OEM schedules, production, job work, quality, bins, purchase and accounts run on one system, set up for auto component supply. Every product shares the same lots, parts and ledger from its first day.
- Tool life counted from job cards
- Plating and heat treatment out and back, with ITC-04
- Cost per part, quoted against actual
- Lot and heat traced forward and back
- Consignment stock at the OEM's plant
- Returnable bins on gate passes
- 8D from the dispatch, the lot and the job cards
- SPC on critical characteristics
- Overdue gauges blocked from inspection
- Schedules read from the OEM's export
- Cumulative per part, net of rejections
- Rejection debits accepted or disputed
- Scheduling agreements with weekly releases
- ASNs from vendors on the portal
- Vendor rating from quality and delivery
- OEM payments matched to invoices and debits
- E-invoice and e-way bill on every dispatch
- Keep Tally for accounts until you move
- Skill matrix per operation and machine
- Contract labour with challans checked
- PF, ESI, Professional Tax and LWF
- Preventive plans by calendar or spindle hours
- Breakdowns logged by scanning the machine
- MTBF, MTTR and the history card
- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario
- Murugan changed T14 after the 8D, counter reset to 0
- Emplotec warned at 2,000 pieces on T14; no change was booked at the 22:00 handover
- Senthil booked 1,800 CB-14 on WO-7714
Emplotec T31 reaches its life in about 4 hours of CB-14. A spare tap is in the tool crib.
Tool crib- Tolerance
- 32.000 to 32.025
- Cpk, October
- 1.71
- Cpk, 2 Nov night
- 0.82
- Gauge AG-07
- Calibrated to 14 Nov
- Rahul Bose raised RN-55102 for 240 CB-14
- Varuna portal published the December schedule, read into 4 lines
- Meera Iyer sent ASN 88259 for 240 CB-12
- Rating
- A
- On time, 6 months
- 97%
- Incoming rejects
- 0.4%
- Agreement
- 12,000 a month
Emplotec Varuna's advice matches to the rupee once RN-55102 is set against it. Nothing left open on November.
Payment adviceCN-26-0188- Spindle runout below 3 µmLast 2 µm
- Way lube and coolant concentration
- Tool changer gripper check
- Pallet changer alignment
One schedule, from the OEM's portal to cash.
Varuna's November schedule for CB-14 caliper brackets, followed through every product it touches. Nothing is retyped, and every step is a record the auditor can open.
- 01 · CRM & Sales
The OEM's schedule comes in
Varuna publishes its November schedule on its portal. Meera downloads the export, Emplotec reads it into schedule lines, and the cumulative carries on from October.
Varuna schedule Nov rev 2 - 02 · Manufacturing
MRP and the plan check it
MRP turns 12,000 brackets into castings, machine hours and tool changes. The plan puts CB-14 on HMC-02 and HMC-03 and counts tool life from the first job card.
MRP-0388 · CB-14 - 03 · Procurement
Castings released to the supplier
The castings become weekly releases against Talegaon's scheduling agreement. Ravi approves on his phone, and Talegaon acknowledges and sends ASNs on the vendor portal.
SA-118 · release W45 - 04 · Inventory
Received by heat, checked at the gate
The truck is weighed at the gate. The GRN carries heat T-5521 from Talegaon's certificate, and the castings wait in QC until Divya's incoming check passes.
GRN 6612 · heat T-5521 - 05 · Manufacturing
Machined, plated and checked
Operators book job cards on the kiosk. The bore is checked on the air gauge, plotted on SPC, and the lot goes to Moshi for zinc-nickel plating and comes back counted.
WO-7731 · JW-1201 - 06 · CRM & Sales
Dispatched with the ASN and the bins
Arun packs 36 of Varuna's bins with their own labels. The ASN, e-invoice and e-way bill go out together, and the bins are counted out on the same record.
DSP-4480 · INV-26-3412 - 07 · Books
Paid, net of the debit
Varuna pays November less the rejection debit. Priya's receipt matches every invoice and the credit note for RN-55102, so the cumulative, the debit and the ledger all agree.
VM-PAY-99120
Ask your plant what the OEM will ask you.
Emplotec reads across schedules, the shop floor, quality, stores and accounts at once. It answers with the records it used, and anything it would change waits for your approval.
Yes from January, if CB-12 moves to VMC-04 and Talegaon or a second foundry adds 4,500 castings a month. No existing schedule slips. I've drafted an RFQ to two foundries and a reply to Rahul Bose for Meera.
₹8.82 L net this year, and more than half is one failure mode: bore size on HMC-03. The tool-life block in 8D-0412 removes it on every HMC, not just one. I've drafted the CAPA for the quality review.
Three findings today, all fixable before the 18th. I've drafted the lab booking for AG-07 on 12 Nov, put PFMEA rev 7 on Divya's list and scheduled the missed night-shift audits for Karthik.
A draft at ₹436 a piece for 8,000 a month, built from what HF-08 really cost, with plating loss priced at 0.9% and the extra drilling on VMC-04.
Can we take CB-16 at 6,000 a month from January, on top of CB-14?
Capacity by machineRoutingsTool lifeScheduling agreement SA-118PPAP status- Running a what-if with CB-16 at 6,000
- Checking HMC load week by week
- Checking castings from Talegaon
- Testing every existing schedule
- HMC-02 and HMC-03 would run at 112% in January
- Moving CB-12 to VMC-04 frees 96 hours a month
- Talegaon has confirmed 14,700 castings a month, not 19,200
Yes from January, if CB-12 moves to VMC-04 and Talegaon or a second foundry adds 4,500 castings a month. No existing schedule slips. I've drafted an RFQ to two foundries and a reply to Rahul Bose for Meera.
- CB-12 routing
HMC-02VMC-04 from 4 Jan - RFQ for CB-16 castings
NoneTalegaon and one more - Reply to Varuna
None6,000 from Jan, draft
Nothing changes until you approve.
Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works
Your OEMs' rules, built into every dispatch.
Emplotec fits your plant and each customer's demands at four levels. The core is never forked, so every change carries through upgrades.
DSP-4480ASN 88262 · Varuna Motors · CB-14- Customer part
- VM 51210-K40
- Quantity
- 720
- Bins
- 36 × VM-B20
- Vehicle
- MH 14 KQ 4471
- Invoice
- INV-26-3412
- Gate out
- Sat 7 Nov, 06:10
- Unloading dockDock 7, gate 3
- Seal numberVS-220418
- Packing photos
- Block the dispatch if any lot on it is in QC hold
- Tell Meera when Varuna's bins with us pass 450
- Cumulative after this dispatch2,880 of 2,880
- PPAP approval checked per part before the ASN goes
- Print Varuna's own bin label with its 2D code
- CB-14 for Varuna: dispatch only with the lot's 100% bore-check record
The core stays the same for every customer, so all of this carries through every upgrade.
Need software Emplotec doesn't have? We build it.
Emplotec is built by a software company. If your plant needs something outside the ERP, such as a live link to an OEM's supplier portal, a gauge that writes straight into SPC or an app for your own sorting team, our team builds it and connects it to Emplotec, under the same support.
- Your OEM's supplier portal linked to schedules, ASNs and debits
- Air gauges that send bore readings straight to SPC
- Part counters from your CNC controllers feeding tool life
- Your old PPAP files and 8Ds moved and kept searchable
Built for the rules where you supply.
Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.
India
- GST e-invoices and e-way bills raised with every ASN
- Job work and ITC-04, with platers and heat treaters reconciled
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates tracked on every vendor bill
- Exports to overseas OEMs under LUT, with realisation tracked
- Contract labour registers and returns under the OSH Code
- Tally sync, if your accounts stay in Tally for now
UAE
- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- OEM schedules, ASNs and returnable bins per customer
Saudi Arabia
- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- OEM schedules, ASNs and returnable bins per customer
United Kingdom
- VAT with Making Tax Digital
- PAYE payroll with RTI
- OEM schedules, ASNs and returnable bins per customer
United States
- Sales tax, state by state
- Payroll
- 1099 forms
- OEM schedules, ASNs and returnable bins per customer
Live in 30 days, without missing a call-off.
We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, products and customers. The system is set up for auto component supply, then fitted to each OEM and to your own workflow, so schedules, labels and debits read the way your team already works.
- We map how each OEM works with you first: schedules, ASNs, labels, bins, consignment and debits.
- Parts, routings, open schedules, cumulatives, stock by lot and balances come across from Tally and Excel.
- PPAP packs, PFMEAs, control plans and the gauge register are loaded part by part.
- PPC, stores, dispatch and quality train on your own parts, then go live between two call-offs.
Questions auto component manufacturers ask
What is the best ERP for the automotive industry?
For an auto component supplier, one that runs the OEM's schedule and cumulative, traces every lot to the machine and the customer, holds PPAP, control plans and 8D beside the stock, and settles rejection debits on the same ledger as your accounts. Emplotec does all of that on one system, with an AI agent across it, fitted to each OEM's demands.
Is Emplotec an automotive ERP for Tier 2 suppliers too?
Yes. Tier 2 suppliers run the same schedules, cumulatives, bins and debits as Tier 1, often on a smaller team. Start with Manufacturing, which includes Inventory, keep Tally for accounts if you like, and add Quality and CRM & Sales as you grow.
Does it handle OEM delivery schedules, cumulatives and ASNs?
Yes. Delivery and cumulative schedules sit in CRM & Sales with customer part numbers, labels, ASNs, returnable containers and consignment. Daily call-offs and kanbans drive line-side supply to the OEM's plant, in the OEM's line sequence where it asks for one. Emplotec reads a schedule from the OEM's Excel or PDF export into draft lines for you to accept.
Does it have PPAP, control plans, SPC and 8D for an IATF 16949 audit?
Emplotec Quality holds APQP for each new part, PPAP packs at levels 1 to 5, AIAG-VDA PFMEAs, control plans linked to them, X̄-R charts with Cp and Cpk, MSA studies, 8D, gauges, layered audits, internal audits and management review, and HRMS holds the skill matrix and training records, so the evidence an auditor asks for is already there. The certification itself is your plant's, not the software's.
Can it raise supplementary invoices when the OEM revises a price with back effect?
Yes. Enter the revision once with its effective date, whether it is a steel pass-through or an annual price-down. Emplotec lists every invoice since that date and drafts supplementary invoices or credit notes with GST, and a person approves them before they go.
Does it handle warranty claims from the field?
Yes. Each warranty claim is matched to the part's lot, build date, job cards and test records. You accept or dispute it with that evidence, and where a job worker's lot caused it, the recovery is raised against them.
Can we keep Tally for our accounts?
Yes. Schedules, production, stores, quality and job work run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.
Can you customise it for each OEM's labels, formats and rules?
Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; the automotive extension; and extensions for your own workflow, such as one OEM's bin label or dispatch rule. The core is never forked, so your changes survive upgrades.
Does it run in the cloud or on our own servers?
Either. Emplotec runs in the cloud or on your own servers, the same build both ways, and each customer has its own database.
What doesn't Emplotec cover for auto component makers?
Design FMEA and design-side APQP, SPC beyond X̄-R and Cp/Cpk, and live machine monitoring from sensors: tool life and OEE come from job cards and downtime logs. OEM supplier portals stay the OEM's own: schedules come across from their Excel or PDF exports.
See Emplotec run your automotive components business.
Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.
- A call within one working day, from the people who build it, not a sales team.
- Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
- Cloud or your own servers, the same build either way, with your own database.