Inspection report format for incoming, in-process and final inspection
An inspection report records what was checked on a lot, against which drawing and tolerance, with which gauge, what was found and whether the lot was accepted. Fill this one in on the page, or download it.
- Sampling to ISO 2859-1 (IS 2500 Part 1)
- Readings against LSL and USL
- Critical, major and minor defects
- A4 landscape, Excel with formulas
Written for India. Elsewhere:Inspection report template US
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Incoming, in-process, final or pre-dispatch
Dimensional and visual checks
| Sr. | Characteristic | Class | Nominal | LSL | USL | Instrument and ID | S1 | S2 | S3 | S4 | S5 | Tolerance band | Result |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Defects found in the sample
| Sr. | Defect | Class | Qty found | Ac | Re | Decision for this class |
|---|---|---|---|---|---|---|
| Total defects in sample | ||||||
Sample result
| Sample size inspected | |
|---|---|
| Defective pieces in the sample | |
| Defective in the sample, % |
Lot decision and disposition
Incoming, in-process, final or pre-dispatch
Dimensional and visual checks
| Sr. | Characteristic | Class | Nominal | LSL | USL | Instrument and ID | S1 | S2 | S3 | S4 | S5 | Tolerance band | Result |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.02 | |||||||||||||
| 0.10 | |||||||||||||
| 0.20 | |||||||||||||
| 1.60 | |||||||||||||
Defects found in the sample
| Sr. | Defect | Class | Qty found | Ac | Re | Decision for this class |
|---|---|---|---|---|---|---|
| Total defects in sample | 4 | |||||
Sample result
| Sample size inspected | |
|---|---|
| Defective pieces in the sample | |
| Defective in the sample, % | 5% |
Lot decision and disposition
Lot accepted: major 1 against Ac 2, minor 3 against Ac 5, no critical defect. Released to finished goods on tag FG-1124-0217. The burr is noted for the deburring operation's next audit.
Example entries. Go back to blank to fill in your own.
What an inspection report is
An inspection report is the record of one inspection of one lot: the part and its drawing revision, the lot and sample size, each characteristic checked with its tolerance and the instrument used, the readings, the defects found, and the decision to accept, reject or hold. It is the evidence that the lot met its requirements before it moved on.
ISO 9001 asks for exactly this. Clause 8.6 says products are released only once planned checks are complete, and the records must show conformity with the acceptance criteria and who authorised the release. Auditors from your certification body and from customers will ask for these reports by lot and heat number.
Incoming, in-process, final and pre-dispatch inspection
| Stage | When | What it checks | Who signs |
|---|---|---|---|
| Incoming (receiving) | When material arrives, before the GRN is accepted | Supplier's test certificate against the specification, dimensions and appearance on a sample | Incoming QC; stores waits for the result |
| First-off (setup approval) | After each setup or tool change | The first pieces against every drawing dimension before the batch runs | Setter and line inspector |
| In-process (patrol) | At set intervals during the run | The characteristics the control plan marks for that operation | Line inspector |
| Final | When the batch is complete | Fit, function, appearance and the special characteristics | Final inspection |
| Pre-dispatch (PDI) | Before packing and dispatch, often witnessed by the customer | Final inspection plus packing, labels and quantity | QA, and the customer's inspector where agreed |
What each field in the inspection report means
| Field | What to write |
|---|---|
| Drawing and revision | The revision you inspected against. A report against an old revision is worthless when the customer has changed a tolerance. |
| Heat or batch no. | The raw material heat and the production batch, so a failure later can be traced to every lot it touched. |
| Lot size, code and sample | The lot quantity, the ISO 2859-1 code letter for your inspection level, and the sample size it gives. |
| Class | CC for a critical characteristic and SC for a significant one, as marked on the drawing or control plan. Customers use their own symbols; copy theirs. |
| Nominal, LSL and USL | The drawing dimension and its lower and upper limits. The sheet works out the tolerance band. |
| Instrument and ID | The gauge or instrument with its own ID, so its calibration status on the day can be checked. |
| S1 to S5 | Readings on five sample pieces. Add columns or a second sheet for larger samples, or record go / no-go results as a count. |
| Defects by class | Critical, major and minor defects found in the sample, against the acceptance (Ac) and rejection (Re) numbers for that class. |
How to pick the sample size: ISO 2859-1 (IS 2500 Part 1)
Most Indian plants sample by attributes to ISO 2859-1, adopted in India as IS 2500 (Part 1). You find the code letter from the lot size and the inspection level (general level II unless the contract says otherwise), read the sample size for that letter, then read the acceptance and rejection numbers for your AQL.
| Lot size | Code letter (level II) | Sample size |
|---|---|---|
| 2 to 8 | A | 2 |
| 9 to 15 | B | 3 |
| 16 to 25 | C | 5 |
| 26 to 50 | D | 8 |
| 51 to 90 | E | 13 |
| 91 to 150 | F | 20 |
| 151 to 280 | G | 32 |
| 281 to 500 | H | 50 |
| 501 to 1,200 | J | 80 |
| 1,201 to 3,200 | K | 125 |
| 3,201 to 10,000 | L | 200 |
| 10,001 to 35,000 | M | 315 |
In the example, a lot of 1,200 gives code J and a sample of 80. At AQL 1.0 for major defects the lot is accepted with 2 or fewer defectives and rejected at 3; at AQL 2.5 for minor defects, accepted at 5 and rejected at 6. Critical defects are usually set at zero acceptance, which is a customer or company rule rather than an AQL from the table.
How to fill in the inspection report
- Fill the header: part, drawing revision, lot, heat or batch number, the stage, and the source document (GRN for incoming, work order for in-process and final).
- Work out the code letter and sample size from the lot size, and write the Ac and Re numbers for each defect class.
- Copy the characteristics from the control plan for that stage, with the nominal, limits and class.
- Check that each gauge is within its calibration date before using it, and write its ID.
- Record each reading as measured, not as "OK". A reading close to the limit tells the process engineer more than a tick does.
- Count defects by class and compare with Ac and Re. Write the decision for the lot and its disposition: released, rejected and returned, held for deviation, or sorted 100%.
- Sign, get the QA engineer's check and the QA head's approval, and tag the lot with the report number.
What to do when a lot fails inspection
- Tag and move the lot to the hold area at once, so it cannot be issued or dispatched by mistake.
- Raise a non-conformance report (NCR) with the report number, the defect, the quantity and photos.
- Decide the disposition: return to the supplier with a debit note, sort 100% and accept the good parts, rework, scrap, or ask the customer for a deviation.
- If the same defect returns, or the customer finds it, go to root cause with a why-why analysis or an 8D report.
- Switch to tightened inspection when ISO 2859-1's switching rules call for it, and back to normal only when they allow.
Common mistakes in inspection reports
- Writing "OK" instead of the reading, so a drifting process is invisible until parts fail.
- No drawing revision or heat number, so the report cannot be tied to what was actually made.
- Using a gauge past its calibration date. Every reading it took becomes doubtful.
- Choosing a sample size by habit ("5 pieces") instead of from the lot size and AQL.
- Accepting a lot with a critical defect because the total count was under the major Ac number.
Emplotec Quality
Or let the inspection hold the stock until it passes.
In Emplotec Quality the inspection plan for the part and stage opens on the inspector's phone with the AQL sample already worked out. Stock stays in QC until the result releases it, and a rejection raises the NCR and the vendor debit in the same system.
- Inspection plans with AQL sampling for incoming, in-process, first-off and final checks, on mobile.
- Stock is held in QC until released, and supplier test certificates are checked by heat.
- A gauge past its calibration date is blocked from the inspection.
- NCR, CAPA with root cause and an effectiveness check, and the cost of poor quality, from the same results.
- Drawing DM-2207 rev D
- All gauges in calibration
- Heat H-31194 certificate on file
- No critical defect
- QA head approvalS. Kulkarni
Emplotec Burrs at the bore entry have appeared in 4 of the last 6 lots, always from VMC-05. The deburring step is in the control plan but not in the operator's work instruction. Add it?
IR/26-27/04398IR/26-27/04405IR/26-27/04412A final inspection on a 1,200-piece lot: the sample, the readings and the lot held in QC until release. Example companies, people and figures.
Questions people ask about the inspection report format
What should an inspection report contain?
The part and drawing revision, the lot, heat or batch number, the stage, the lot and sample size, each characteristic with its limits and the instrument used, the readings, defects by class against the Ac and Re numbers, the lot decision and the signatures.
How do I decide the sample size for inspection?
Use ISO 2859-1 (IS 2500 Part 1): find the code letter from the lot size and the inspection level, usually general level II, then read the sample size and the Ac and Re numbers for your AQL. A lot of 1,200 at level II gives code J and a sample of 80.
What is the difference between a critical, major and minor defect?
A critical defect can make the product unsafe or breach a law. A major defect is likely to cause failure or reduce usability. A minor defect does not affect use, such as a cosmetic mark. Each class gets its own AQL, with critical usually at zero.
What is a pre-dispatch inspection report?
The final inspection done before packing and dispatch, often witnessed by the customer's inspector. It adds packing, labelling and quantity checks to the final inspection, and the customer may ask for a copy with each consignment.
Is an inspection report required for ISO 9001?
ISO 9001 clause 8.6 requires documented evidence that products met the acceptance criteria and a record of who released them. An inspection report is how most plants keep that evidence.
What happens if the lot fails inspection?
Hold and tag the lot, raise a non-conformance report, and decide the disposition: return to the supplier, sort, rework, scrap or ask for a deviation. Repeat failures go to root cause analysis.
Sources
- ISO 2859-1:1999, Sampling procedures for inspection by attributes, Part 1https://www.iso.org/standard/1141.html
- Bureau of Indian Standards: IS 2500 (Part 1), sampling inspection by attributes (identical to ISO 2859-1)https://www.bis.gov.in/
- ISO 9001:2015, clause 8.6 Release of products and serviceshttps://www.iso.org/standard/62085.html
- ASQ: Acceptance sampling and AQLhttps://asq.org/quality-resources/acceptance-sampling
Related
Stop typing inspection reports by hand.
Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.