HVAC service software for AMC and maintenance contractorsEvery PPM done, even in May. Every visit billed.

For companies that install and maintain split and VRF systems, chillers, AHUs, cold rooms and commercial refrigeration: AMC and CMC contracts, a dispatch board for the summer rush, the technician's app with readings and the client's OTP, refrigerant logs, van stock and billing, on one ERP with an agent that works across all of it.

  • Runs onField Service · Assets & Maintenance · Billing · Inventory · Projects · HRMS · Books · Procurement · Expense · Workforce
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecRM
Service desk todayTuesday 12 May · 11:40 · peak summer
6 P1 calls at riskSix priority calls will pass their response time before 1:30 pm unless they are assigned now. Kovalam Pharma's cold room is the closest.
Open calls4123.1 times February
Technicians on duty168of 1869 subcontractor crews too
Response SLA met, May93%−2 pts on April
PPM done this week1,084of 1,240On plan
Open calls by equipmentToday, 11:40
  • Split and cassette ACsBranches, shops, homes188
  • VRF and VRV systemsHotels, offices94
  • Cold rooms and display chillersRetail, pharma, food61
  • Chillers, AHUs and cooling towersTech parks, malls, hospitals41
  • Precision ACsServer rooms28
Needs you now
CallSiteCoverSLA

Emplotec Six P1 calls can still be met. Four go to technicians already near the site with the right gas or part, and two go to subcontractor crews on the vendor portal. Three routine PPM visits move to Thursday, with the clients told.

Open callsContracts and SLAsVan stockTechnicians' skills

In this example, Coromandel Aircon & Refrigeration runs 186 technicians and 6,840 customer assets from Chennai on Emplotec, on the busiest day of the summer. Click through the dispatch board, AMC and CMC contracts, the technician's app, a chiller's PPM readings, the refrigerant log, AMC billing, van stock, an installation project and the technicians' skills. Example companies, people and figures.

From the breakdown call to each contract's margin.

Emplotec reads every call, unit, cylinder and van across Coromandel's 6,840 customer assets, and drafts the plans people approve.

  1. The call desk

    Kovalam's cold room reads 9.4 °C, so the call opens against its CMC with a 2-hour response clock.

    412 open calls on 12 May

  2. Dispatch

    Emplotec proposes the cold room technician with the right gas in his van, and Karthik confirms.

    38 P1 calls placed by 11:40

  3. The plant room

    Murugan logs CH-2's readings offline, adds 3 kg of R-134a from a tracked cylinder, and Rahul approves the report by OTP.

    Condenser approach 3.8 °C

  4. The cold room

    The pharma store's temperature log and the visit report reach the client's portal before Selvi's next refill.

    Back to 5.2 °C in 74 minutes

  5. The stores

    Tomorrow's jobs decide what each van carries, and recovered gas comes back to the hub on record.

    11 van transfers drafted

  6. The accounts

    Larkspur's quarterly CMC bills with the gas beyond its allowance, and the contract's margin is final after parts and overtime.

    ₹14,43,081 with GST

Does your summer look like this?

These are the moments HVAC and refrigeration service companies start looking for HVAC software. Each one is the call, the unit, the van and the bill kept in different places.

  • Calls triple in May, and the coordinator rings five technicians to find one near the site with the right gas.

    WhatsApp groups

    The dispatch board proposes the technician by skill, distance, van stock and the SLA due, and shows whose day it would disturb. The dispatcher confirms in one drag.

  • A tech park threatens to cancel the chiller CMC because PPM visits can't be proved.

    Paper log sheets

    Every PPM visit carries its readings, photos and the client's OTP, and the client's portal shows visits done against the contract.

  • Refrigerant is bought by the cylinder, and nobody knows which unit it went into.

    A stores register

    Each cylinder is issued to a van and scanned on the job, so every kilogram is on a unit's refrigerant log and recovered gas comes back to the stores on record.

  • A compressor goes into a CMC chiller and nobody knows if the contract still makes money.

    Excel and Tally

    Parts, gas, labour, overtime and subcontractors are costed against each contract, so the margin is known before the renewal.

  • AMCs lapse in the winter, or renew at last year's price.

    Renewal quotes are drafted ahead of each end date at the revised price, with the year's visits, calls and cost beside them.

  • The technician fits a part that wasn't covered, and the bill never goes out.

    Job sheets in the van

    Cover is checked when the call opens. A chargeable part becomes an invoice line the moment the client signs the report.

  • Vans run out of R-32 and capacitors by noon, while the hub has plenty.

    Each van is a stock location, refilled overnight from tomorrow's jobs or a min and max, and counted on the phone.

  • An installation ends without a commissioning report, so the warranty start and the AMC that should follow are lost.

    The project closes on its commissioning checklist, the new units join the client's asset register with their serials and warranty start, and the AMC offer goes out from the same record.

  • A pharma client's cold room fails at night and the SLA penalty arrives with the payment.

    SLA clocks run on each contract's working calendar, escalate before the breach, and record every pause, so the response times can be proved.

  • A technician's refrigerant handling certificate lapsed last month and he is still being sent to cold rooms.

    Skills and certificates with expiry come from HRMS, and dispatch stops proposing anyone whose certificate the job needs has lapsed.

HVAC field service software on every unit's record.

Start with Field Service, then add Assets & Maintenance, Billing, Inventory, HRMS and Books. Installation projects, purchase, expenses and freelance technicians run on the same records, so a unit installed in March is the one serviced in May and billed in June.

Start here
  • Cover checked when the call opens
  • Dispatch by skill, van stock and SLA
  • Offline app in plant rooms and basements
Emplotec Field Service
Add next
  • PPM by calendar or running hours
  • Readings with limits you set
  • Refrigerant log per unit
Emplotec Assets & Maintenance
  • Service agreements billed on schedule
  • Signed reports become invoice lines
  • SLA penalties as credit notes
Emplotec Billing
  • Cylinders issued and scanned on the job
  • Vans refilled on min and max
  • Van counts on the phone
Emplotec Inventory
  • Certificates read by dispatch
  • Summer overtime paid right
  • Incentives from first-time fixes
Emplotec HRMS
  • Margin per contract
  • Receipts collected on site reconciled
  • Keep Tally until you move
Emplotec Books
When you need it
  • Budget against committed cost
  • RA bills from measured progress
  • Handover adds units to the AMC
Emplotec Projects
  • Subcontractors on the vendor portal
  • Gas and spares on rate contracts
  • Three-way match on every bill
Emplotec Procurement
  • Distance checked against GPS
  • Charged to the contract
  • Paid through payroll
Emplotec Expense
  • Onboarded at peak speed
  • Paid per visit
  • Weekly statement on the phone
Emplotec Workforce
Calls todayOMR and south · 11:40
CallSite and unitTechnicianSLA
CL-26-18842Kovalam PharmaCold room CR-1 · CMCAmbattur crew 138 m
CL-26-18839Larkspur Tech ParkChiller CH-2 · CMCMurugan1 h 10 m
CL-26-18851Bayview Grand HotelVRF ODU-4 · AMCSenthil1 h 25 m

One chiller call, from the CMC to the invoice.

Larkspur's CH-2 on 12 May, followed through every product it touches. The unit is recorded once, and it becomes the job, the gas record, the bill and the contract's margin.

  1. 01 · Field Service

    The CMC becomes the rules for every call

    Larkspur's signed CMC is read into the contract: assets, PPM per schedule, response and fix times, parts covered, gas up to 10% of charge. Meera confirms each term against its clause.

    LK-CMC-2611
  2. 02 · Field Service

    The call opens with its cover and clock

    Larkspur's plant operator scans CH-2's QR tag. The call opens against the CMC as a P1, and the 1-hour response clock starts on the contract's calendar.

    CL-26-18839
  3. 03 · Field Service

    Dispatch proposes, Karthik confirms

    Murugan is already at Larkspur, chiller certified, with tube brushes and R-134a in van 12. Karthik confirms, and the brief with CH-2's history reaches his phone.

    Dispatch board
  4. 04 · Assets & Maintenance

    Readings, the leak and the gas, offline

    In the plant room, with no signal, Murugan logs 14 readings, finds the leak at valve 3, fixes it and adds 3 kg from a scanned cylinder. It syncs when he walks out.

    SR-26-77104
  5. 05 · Field Service

    The client approves by OTP

    Rahul Bose gets the report on his phone and enters the OTP. The SLA clock stops at 12:58, inside the 4-hour fix, and the report appears on Larkspur's portal.

    OTP at 13:02
  6. 06 · Inventory

    The van is refilled for tomorrow

    The cylinder's remaining weight and tomorrow's jobs decide van 12's refill. Selvi picks it at Guindy before 7 pm.

    TR-26-3318
  7. 07 · Billing

    The quarter bills, with the gas beyond the allowance

    Q1's CMC fee bills in advance with the 3 kg of chargeable gas and the pump seal quoted on site, with the visit annexure and a GST e-invoice.

    INV-2627-00418
  8. 08 · Books

    The contract's margin is final

    Larkspur pays net of TDS. Murugan's hours, the gas at cost and the subcontractor's tower cleaning are set against the fee, so the renewal is priced on the real margin.

    LK-CMC-2611 · 14%

Ask your service business anything.

Emplotec reads the calls, contracts, units, readings, vans, technicians, bills and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Repeat visits cluster on two VRF models where technicians topped up gas without finding the leak. I've drafted a rule: a second top-up on the same unit within 90 days opens a pressure test job instead.

  • Revenue grew faster than calls, but overtime grew faster still on the OMR team. Two more technicians there from March next year cost less than this May's overtime.

  • Thirty-one renewal quotes are drafted, each with the year's visits, calls and cost beside the price. Meera sends them after review.

  • Seven handed-over projects have no AMC offer. I've drafted offers timed to each warranty end, priced from your rate card for the units installed.

EmplotecAcross the business

Why do we keep going back to the same VRF systems?

ReadJobs and failure codesAssets by modelTechnicians
  1. Finding repeat visits within 30 days
  2. Grouping by model, fault and technician
  3. Checking parts fitted
  • 62 repeat visits in April and May, 41 on two VRF models
  • Most are refrigerant top-ups without a leak found
  • First-time fix on chillers held at 92%

Repeat visits cluster on two VRF models where technicians topped up gas without finding the leak. I've drafted a rule: a second top-up on the same unit within 90 days opens a pressure test job instead.

Repeat VRF visitsWaiting for you
  • RuleNoneSecond top-up in 90 days opens a pressure test
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your contracts, your units, your way of working.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Service reportSR-26-77104CH-2 · Larkspur Tech Park · 12 May
Call
CL-26-18839, P1
Technician
Murugan
Fault
High head pressure
Gas added
R-134a 3.0 kg
Cover
CMC, gas beyond allowance chargeable
Approved by
Rahul Bose, by OTP
Configure it
  • Condenser approach3.8 °C
  • kW per TR0.71
  • Photos before and after
Set your rules
  • Raise a follow-up job when a reading passes the model's limit
  • Tell the service head when gas added in 12 months passes 10% of charge
Your industry's extension
  • CylinderCYL-R134-0882
  • Recovered gas returned to stores on record
Built for you alone
  • Larkspur permit to workPTW-0518
  • Kovalam Pharma: temperature log attached to every cold room report

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your service business needs something outside the ERP, such as a link to your clients' building management systems or an OEM's dealer portal, our team builds it and connects it to Emplotec, under the same support.

  • Readings from a client's building management system into PPM limits
  • Calls from an OEM's dealer portal opened as jobs
  • Signed reports uploaded to your clients' own FM portals
  • Your old service software's contracts, assets and history moved and kept searchable

Refrigerant records and tax, wherever you service.

Your country's tax, payroll and refrigerant record-keeping are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices with the visit annexure
  • E-way bills when units and spares move
  • TDS on receipts under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF for technicians and helpers
  • Contract labour registers for helpers through contractors
  • A refrigerant log per unit: gas charged, added and recovered, by cylinder
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, before the summer starts.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which branches, companies and products.

  1. We map your service business first: contracts and what each covers, units by client and site, PPM plans, rate cards and how each client is billed.
  2. Clients, sites, units, contracts, van and hub stock, open calls and balances come across from Excel, your service software and Tally.
  3. We read your signed AMCs and CMCs into contracts and fit reading sheets and report formats to your clients.
  4. Your call desk, dispatchers, technicians, stores and accounts train on your own data, then go live team by team, ideally before April.
What is the best HVAC software for a growing service company?

One that runs the whole job on one record: the call, the contract's cover and SLA, dispatch by skill and van stock, the technician's report with readings, the refrigerant and parts used, and the invoice. Emplotec does that in one system with your stock, people and accounts, with an AI agent across it.

Is it HVAC dispatch software?

Yes. The dispatch board shows each technician's day with unassigned jobs beside it. The agent proposes who should go by skill, certificate, territory, the parts in the van and the SLA due, and the dispatcher confirms. In an emergency it re-plans the day and shows whose jobs move.

Can it handle AMC and CMC contracts?

Yes. Each contract carries the units it covers, PPM visits a year, response and fix times, which parts and how much refrigerant are covered, and the fee. Cover is checked when a call opens, so the client knows before the visit whether it is covered or chargeable.

Does it work as HVAC invoice software for service agreements?

Yes. AMC and CMC fees bill in advance or arrears, monthly to yearly, and chargeable visits, parts, gas beyond the allowance and call-outs join the same run from signed reports. SLA penalties go out as credit notes where the contract sets them.

Can it plan chiller and VRF maintenance with readings?

Yes. PPM plans run by calendar or running hours for each asset class, with the reading sheet for each model and limits you set. A reading past its limit raises a follow-up job, and the client's monthly plant report is built from the logged readings.

Does it keep F-gas and refrigerant records?

Yes. Every cylinder is issued to a van and scanned on the job, so each unit's log shows the gas at installation, gas added, gas recovered and leak checks. In the UK the records follow the F-gas rules, kept five years; in the US each technician's EPA Section 608 certification type is on record.

Does the technician's app work without signal?

Yes. It works offline in plant rooms and basements and syncs when the phone finds signal. The technician sees the unit's history before the visit, checks in by geofence, QR or the client's OTP, and the client signs or approves the report by OTP before he leaves.

How does it handle the summer peak?

Calls come in from phone, the client portal, email, WhatsApp and QR scans on units. The board proposes assignments for the whole team, subcontractor crews take overflow jobs on the vendor portal, and freelance technicians can be onboarded and paid per visit.

Can it run installation projects as well as service?

Yes. Installations run as projects with a BOQ, budget, purchase of units, site progress, RA bills and a commissioning checklist. At handover the units join the client's asset register with their warranty start, and the AMC offer follows from the same record.

Can we keep Tally for our accounts?

Yes. Service, stock and billing run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for the way we work?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for HVAC service companies, such as the refrigerant log with cylinders; and extensions built for you alone. The core is never forked, so your changes survive upgrades.

What doesn't Emplotec cover for HVAC companies?

Route optimisation across a day's jobs, warranty claims to manufacturers, depot repair, GPS tracking hardware, predictive models on sensor data, and load or duct design. Emplotec keeps the records an authority asks for; it does not issue certificates or file with an authority.

See Emplotec run your hvac and refrigeration services business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp