ERP for the steel industry, foundries and forge shopsEvery heat traced to the customer. Every kilo accounted for.

For foundries, forge shops, steel processors and re-rollers: the heat number from the melt to the customer's test certificate, yield and rejection by heat, pattern and die life, scrap bought by the weighbridge's weight, and job work for machining and heat treatment, on one system with your stores and accounts.

  • Runs onManufacturing · Inventory · Quality · Procurement · CRM & Sales · Books · Assets & Maintenance · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Foundry todaySIDCO Kurichi · Friday 6 Nov · 07:45
Heat failedH-1184 (SG 500/7) failed its test bar: elongation 5.2% against 7% minimum. 86 PC-150 casings were poured from it, and 24 left for Prakash Pumps yesterday on INV-26-2207.
Melted yesterday14.2t8 heats on IF-1 and IF-2
Yield yesterday61.4%IF-2 heats lowest
Internal rejection, Oct4.8%VB-80 doubled
Power612kWh/tIF-2 at 668
Where H-1184 is86 PC-150 casings
WhereDocumentQtyStatus
Since last night
  • Lakshmi tested the H-1184 test bar: tensile 532 MPa, elongation 5.2%
  • Emplotec traced H-1184 to 86 casings: 24 on INV-26-2207, 62 at the plant
  • Emplotec found the ladle waited 11 minutes after treatment while Line B stood
  • Murugan melted H-1189 to H-1192 on IF-1, all with test bars kept

Emplotec Only elongation failed. Hold the 62 here and ask Prakash to hold the 24; re-heat-treating all 86 at Kurichi Heat Treaters and re-testing from H-1184's spare keel blocks is Divya's call.

H-1184INV-26-2207Test bars

In this example, Noyyal Alloy Castings runs its Coimbatore foundry on Emplotec. Heat H-1184 has failed its test bar after 24 castings left for Prakash Pumps, and Emplotec has already traced every one. Click through heats, pouring, the lab, patterns, the weighbridge, dispatch and yield. Example companies, people and figures.

Every heat, from the weighbridge to the payment.

Emplotec follows each heat from the weighbridge through the pattern shop, the melt shop and the lab, and people approve every plan it drafts.

  1. The weighbridge

    Ukkadam billed more than the weighbridge shows, so Emplotec drafts debit notes for Priya.

    3 trucks, ₹57,750 held

  2. The pattern shop

    Every mould counts against its pattern, so Emplotec drafts Prakash's refurbishment request early.

    PT-PC150-2: 7,640 of 8,000

  3. The melt shop

    Every charge is issued by weight, and every casting poured carries its heat number.

    H-1190 on IF-1

  4. The laboratory

    H-1184 failed elongation, so Emplotec plans the hold and a re-treatment for Divya to decide.

    JW-0882, waiting for approval

  5. The fettling shop

    Yield, returns and melt loss close against each heat, so cost per kilo is real.

    H-1184: 1,084 kg good castings

  6. Dispatch

    The invoice carries the heat number, and the test certificate leaves with it.

    Kessler: 12 crates under LUT

  7. The accounts

    Purchase, melt and sale agree by weight, so every kilo is accounted for.

    PC-150 at ₹150 a kilo

Does your melt shop look like this?

These are the moments foundries, forge shops and steel processors start looking for a new system. Each one is a heat, a kilo or a certificate nobody can account for.

  • A heat fails its test bar after castings from it have been fettled and dispatched, and the trace takes a day of registers.

    Melt register and dispatch book

    Every casting, forging or coil carries its heat number from the melt to the invoice. A failed heat traces forward, here and at the customer.

  • The customer's auditor asks for the certificate of a heat from eight months ago.

    Files in the lab

    Chemistry and test bar results sit on the heat record, and the customer's test certificate prints from them, so any heat's certificate is a search away.

  • Yield and rejection are known by month, so nobody knows which heat, pattern or furnace to fix.

    Excel

    Metal tapped, good castings, returns and melt loss per heat, and every rejection by heat, part, pattern and defect.

  • Scrap is paid on the supplier's weight, and the deductions are argued on the phone.

    Weighbridge slips and Tally

    Every truck is weighed at the gate, the GRN takes the weighbridge's net less the agreed deduction, and the invoice is matched to it before payment.

  • A customer's pattern or a forging die wears out mid-order because nobody counted moulds or hits.

    A pattern register

    Pattern and die life counted from job cards, with owners, racks and refurbishment, so the customer approves the repair before the order needs it.

  • Pig iron and ferro alloys go up, and nobody knows the real cost per kilo of a part any more.

    A costing sheet from last year

    Cost per kilo per heat from the actual charge, power, moulding, fettling, rejection and returns, against each customer's price.

  • The pig iron index moves every month, and the price revisions to customers are worked out on a calculator, months late.

    Excel and Tally

    Each customer's index clause sits on the price. When the index moves, the revised price and the supplementary invoices for the dispatches it covers are drafted for a person to approve.

  • Blowholes rise on Line B, and nobody connects them to the sand moisture logged on paper that shift.

    Sand lab register

    Sand tests by line and shift sit beside rejections by defect, so a blowhole trend shows the moisture and compactability readings behind it.

  • Valve bodies go out after heat treatment, and the hardness and furnace chart for that load can't be found when the customer asks.

    Furnace charts in a drawer

    Every heat treatment load carries its castings' heat numbers, the cycle, the chart and the hardness, and the castings stay held until the load passes.

ERP for the steel industry, from the weighbridge to the certificate.

The weighbridge, melting, the lab, stores, job work, quality, purchase, sales and accounts run on one system, set up for foundries, forge shops and steel processors. Every product shares the same heats and the same ledger.

Start here
  • Heats as work orders, charge by weight
  • Pattern and die life from job cards
  • Yield, melt loss and cost per heat
Emplotec Manufacturing
  • Weighbridge tickets on every GRN
  • Returns credited back to stock by grade
  • Heat traced forward and back
Emplotec Inventory
Add next
  • Castings held until the heat passes
  • Suppliers' certificates checked by heat
  • NCR and CAPA from rejections
Emplotec Quality
  • Rate contracts with moisture and dust deductions
  • Invoices matched to our net weight
  • Vendor rating from weight and quality
Emplotec Procurement
  • Prices per kilo or per piece
  • Certificates by heat on every dispatch
  • Rejection debits traced to the heat
Emplotec CRM & Sales
  • Exports under LUT, realisation tracked
  • Debit notes from weighbridge gaps
  • Keep Tally for accounts until you move
Emplotec Books
When you need it
  • Lining life by heat count
  • Breakdowns feed the melt plan
  • Maintenance cost per furnace
Emplotec Assets & Maintenance
  • Budget against actuals every month
  • CMA data in your bank's template
  • Raw material price as a scenario
Emplotec Planning
Charge sheet · H-1190SG 500/7 · IF-1 · for Prakash Pumps
Charge sheetH-1190
Issued
Grade
SG 500/7
Furnace
IF-1
Melter
Murugan
Order
PP/PO/4471
MaterialPlanned kgIssued kg
Steel scrap, HMS1,0201,018
Pig iron, foundry grade460462
SG returns370372
FeSiMg and inoculant3434
Charged
1,886 kg
Tapped
1,850 kg

One order, from the scrap yard to the certificate.

Prakash Pumps' order for 400 PC-150 pump casings, followed through every product it touches. The heat number is set once, at the furnace, and carried to the customer.

  1. 01 · CRM & Sales

    The order comes in by grade and weight

    Prakash sends PO PP/PO/4471 for 400 PC-150 casings in SG 500/7. Emplotec reads it into a sales order at ₹150 a kilo and checks the pattern has the life for it.

    SO-3361 · PP/PO/4471
  2. 02 · Procurement

    Scrap in, by the weighbridge's weight

    Ukkadam's truck is weighed in and out at the gate. The GRN takes our net less the agreed 1.5%, and the invoice is matched to it.

    WB-6631 · GRN 7718
  3. 03 · Manufacturing

    The heat is melted and numbered

    Murugan melts H-1190 on IF-1. The charge is issued by weight against its sheet, and every casting poured from it is numbered H-1190.

    H-1190 · charge sheet
  4. 04 · Quality

    Held until the heat passes

    Lakshmi runs the spectro and pulls the test bar. The 92 castings wait in QC hold until tensile, elongation and nodularity pass, then they are released with the heat traced.

    TC-1190
  5. 05 · Manufacturing

    Fettled, and the heat's cost is known

    Knockout, fettling and shot blasting are booked on job cards. Yield, returns and melt loss close against the heat, so the cost per kilo is real before the casting ships.

    WO-H1190
  6. 06 · CRM & Sales

    Dispatched with its certificate

    Arun dispatches 92 casings to Prakash. The e-invoice, e-way bill and TC-1190 go together, and the invoice carries the heat number.

    INV-26-2214
  7. 07 · Books

    Paid, with every kilo accounted for

    Prakash pays on 45 days. Priya's receipt matches the invoice, and the scrap debit to Ukkadam has already come off the payable, so purchase, melt and sale agree by weight.

    Receipt PP-8812

Ask your foundry what every kilo is worth.

Emplotec reads across heats, the lab, stores, purchase and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • PC-150 makes ₹2.40 a kilo at today's rates. Prakash's rate contract lets the price move with pig iron each quarter, so a revision to ₹158 is due. I've drafted the letter with the index and the heats behind it.

  • Yes for 30 t in January and 10 t in the first week of February, if Siruvani approves a second pattern. I've drafted the reply for Meera and an RFQ to a second heat treater.

  • Eleven patterns can go back. I've drafted letters to Prakash Pumps and Siruvani Valves listing each pattern, its rack and the date of its last mould, asking them to collect or confirm by 30 November.

  • ITC-04 is ready except JW-0861, where Ganapathy holds 36 valve bodies for 64 days. I've drafted a reminder. Your accountant files the return once it is back.

EmplotecAcross the business

What does a kilo of PC-150 really cost us now, and does Prakash's price still cover it?

ReadHeat costsCharge sheetsRate contractsPower readingsJob cardsRejections
  1. Costing the last 20 PC-150 heats
  2. Applying this month's scrap and pig iron rates
  3. Adding power, moulding, fettling and rejection
  4. Comparing with Prakash's price
  • Pig iron is 7% dearer and scrap 3.2% since the price was set
  • Cost is ₹147.60 a kilo at today's rates, against ₹150
  • Heats with yield above 62% still make ₹7 a kilo

PC-150 makes ₹2.40 a kilo at today's rates. Prakash's rate contract lets the price move with pig iron each quarter, so a revision to ₹158 is due. I've drafted the letter with the index and the heats behind it.

Price revision · Prakash PumpsWaiting for you
  • PC-150 price₹150 a kg₹158 a kg from 1 Dec
  • Letter to Rahul BoseNoneDraft, with the pig iron index
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your melt shop's way of working, not ours.

Emplotec fits your furnaces, grades and customers at four levels. The core is never forked, so every change carries through upgrades.

Heat recordH-1186SG 500/7 · IF-1 · Thu B shift
Furnace
IF-1
Grade
SG 500/7
Tapped
1,840 kg
Tap temperature
1,515 °C
Melter
Murugan
Poured on
Line B, 45 moulds
Configure it
  • Heats on lining212 of 260
  • Power reading1,128 kWh
  • Spectro printout
Set your rules
  • Hold every casting from the heat until the test bar passes
  • Tell Murugan when a treated ladle waits past 8 minutes
Your industry's extension
  • Heat number on every casting and certificateH-1186
  • Close yield and melt loss against the heat
Yours alone
  • Print Prakash's own certificate with drawing number and photos
  • Kessler heats: three test bars, held until their inspector signs

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your plant needs something outside the ERP, such as your spectrometer's results flowing into each heat, a portal where buyers download certificates by heat, or a link to your furnace's energy meter, our team builds it and connects it to Emplotec, under the same support.

  • Your spectrometer's results read into each heat record
  • A buyer portal for certificates by heat
  • Furnace energy meter readings into the heat log
  • Your old melt registers moved and kept searchable

Built for the rules where you melt.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices and e-way bills raised at dispatch
  • Exports under LUT, with the LUT register and realisation tracked
  • Job work and ITC-04 for machining and heat treatment
  • GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
  • TDS and TCS under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF on the Labour Codes
  • MSME payment dates tracked on every vendor bill
  • Consent to operate and the factory licence in the compliance calendar
  • Contract labour registers and returns under the OSH Code
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without stopping a furnace.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, products and companies. The system is set up for melting, casting and forging, then fitted to your plant's own workflow, so heats, grades and certificates read the way your team already works.

  1. We map your melt shop first: furnaces, grades, charge sheets, the lab, patterns and how heats are numbered.
  2. Items, grades, open orders, stock by heat and weight, and balances come across from Tally and Excel.
  3. Patterns and dies are loaded with owners and life used, and customers' certificate formats are set up.
  4. Melters, the lab, stores and the weighbridge train on your own heats, then go live from a Monday's first heat.
What is the best ERP for the steel industry?

For a foundry, forge shop, steel processor or re-roller, one that numbers every heat at the furnace and carries it to the customer's certificate, buys scrap by the weighbridge's weight, shows yield and rejection by heat, and counts pattern and die life, on the same ledger as your accounts. Emplotec does all of that on one system, with an AI agent across it.

Is Emplotec a foundry ERP?

Yes. Heats as work orders with the charge issued by weight, castings in QC hold until the heat's test bar passes, pattern life, fettling and job work for machining and heat treatment, with yield and cost per kilo by heat.

Does it work for forge shops and steel processors?

Yes. A forge shop runs billets cut by heat, die life counted in hits and forgings traced to the customer. A steel processor or re-roller runs coils or billets by heat, customers' material on job work with conversion charges, and weighbridge on every truck.

Does it cover heat treatment, sand testing and NDT?

Yes. Heat treatment loads are booked with their cycle, chart and hardness, and castings stay held until the load passes. Sand tests are recorded by line and shift, and radiography, MPI, ultrasonic and pressure test results sit on each casting, with an NCR when one fails.

Can our prices follow the pig iron and scrap index?

Yes. Each customer's price per kilo can carry its index clause. When the index moves, Emplotec works out the revised price from the agreed base and drafts supplementary invoices or credit notes for the dispatches it covers, for a person to approve.

Can it issue test certificates by heat?

Yes. Chemistry and test results are recorded on the heat, castings stay in QC hold until it passes, and the certificate prints from the heat's own results in each customer's format.

Does it connect to our weighbridge?

Yes. Weighbridge tickets come from connected weighbridges, linked to the gate entry, the GRN and the dispatch, and the GRN takes the net weight less any deduction your rate contract allows.

Can we keep Tally for our accounts?

Yes. Heats, stores, the lab and job work run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for our grades and customers' formats?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; the casting, forging and steel extension; and extensions for your own workflow, such as one customer's certificate. The core is never forked, so your changes survive upgrades.

Does it run in the cloud or on our own servers?

Either. Emplotec runs in the cloud or on your own servers, the same build both ways, and each customer has its own database.

What doesn't Emplotec cover for foundries and steel plants?

Charge-mix optimisation, furnace and process control, live furnace monitoring from sensors, casting simulation, and integrated steel plants run as continuous process plants. Spectrometer and test bar results are recorded on each heat, and the instruments themselves stay as they are.

See Emplotec run your metal casting, forging and steel business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp