Free templateProduction and quality
Costing sheet format in Excel, with cost per unit and selling price
A cost sheet builds up what one unit really costs, from material and labour to the selling price. Fill in this one on the page, or download the Excel with every formula in place.
- Cost sheet as ICAI teaches it
- Per-unit cost and selling price
- Part cost sheet for quotes
- Excel with formulas
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Statement of cost and profit for the period
| Opening stock of raw material | |
|---|---|
| Add: purchases, with carriage and freight inward | |
| Less: closing stock of raw material | |
| Direct material consumed | |
| Direct labour (direct employee cost) | |
| Direct expenses (job work, royalty on production) | |
| Prime cost | |
| Add: factory overheads (works overheads) | |
| Gross works cost | |
| Add: opening work in progress | |
| Less: closing work in progress | |
| Works cost (factory cost) | |
| Add: quality control and process R&D | |
| Add: administration overheads (production related) | |
| Less: credit for scrap and recoveries | |
| Add: primary packing cost | |
| Cost of production | |
| Add: opening stock of finished goods | |
| Less: closing stock of finished goods | |
| Cost of goods sold | |
| Add: administration overheads (general) | |
| Add: selling and distribution overheads | |
| Cost of sales | |
| Profit margin on cost of sales (%) | |
| Profit | |
| Sales (selling price) | |
| Units produced | |
| Units sold | |
| Cost of production per unit | |
| Cost of sales per unit | |
| Selling price per unit |
Statement of cost and profit for the period
| Opening stock of raw material | |
|---|---|
| Add: purchases, with carriage and freight inward | |
| Less: closing stock of raw material | |
| Direct material consumed | 19,28,000.00 |
| Direct labour (direct employee cost) | |
| Direct expenses (job work, royalty on production) | |
| Prime cost | 25,73,000.00 |
| Add: factory overheads (works overheads) | |
| Gross works cost | 32,13,000.00 |
| Add: opening work in progress | |
| Less: closing work in progress | |
| Works cost (factory cost) | 31,88,000.00 |
| Add: quality control and process R&D | |
| Add: administration overheads (production related) | |
| Less: credit for scrap and recoveries | |
| Add: primary packing cost | |
| Cost of production | 33,28,000.00 |
| Add: opening stock of finished goods | |
| Less: closing stock of finished goods | |
| Cost of goods sold | 31,55,200.00 |
| Add: administration overheads (general) | |
| Add: selling and distribution overheads | |
| Cost of sales | 35,30,200.00 |
| Profit margin on cost of sales (%) | |
| Profit | 4,23,624.00 |
| Sales (selling price) | 39,53,824.00 |
| Units produced | |
| Units sold | |
| Cost of production per unit | 832.00 |
| Cost of sales per unit | 929.00 |
| Selling price per unit | 1,040.48 |
Example entries. Go back to blank to fill in your own.
What a cost sheet is
A cost sheet, or costing sheet, is a statement that adds up the cost of a product in stages: what went into it directly, what the factory spent to make it, what it cost to run the office around it, and what it took to sell and deliver it. Each stage has a name, and the last line is the selling price.
Manufacturers use it for three jobs. It sets prices and quotes. It shows which cost moved when the margin falls. And it values closing stock and work in progress at cost, which the books need every period end.
Cost sheet format: the stages and what goes in each
The order below is the one in ICAI's Cost and Management Accounting study material, which follows the Cost Accounting Standard on cost of production (CAS-4). Each subtotal is the one before it plus the costs listed under it.
| Stage | What goes in | Formula |
|---|---|---|
| Direct material consumed | Raw material and components that become part of the product, with freight inward and duties you can't recover | Opening stock + purchases + freight inward − closing stock |
| Prime cost | Direct material, direct labour (wages of operators on the job) and direct expenses (job work charges, royalty on production, hire of special tools) | Material + labour + direct expenses |
| Works cost (factory cost) | Factory overheads: indirect wages, power, consumables, maintenance, depreciation of plant, factory rent. Then adjust for work in progress | Prime cost + factory overheads + opening WIP − closing WIP |
| Cost of production | Quality control, process R&D, administration that serves production and primary packing, less scrap and by-product recoveries | Works cost + QC + R&D + production admin + primary packing − scrap |
| Cost of goods sold | The change in finished goods stock | Cost of production + opening finished goods − closing finished goods |
| Cost of sales | General administration, selling (salesmen, advertising, commission) and distribution (secondary packing, freight outward, warehousing) | Cost of goods sold + admin + selling + distribution |
| Sales | Profit added to cost of sales | Cost of sales + profit |
How to prepare a cost sheet, step by step
- Fix the period and the cost unit: per piece, per kg, per tonne or per batch. Everything after this is per that unit.
- Work out material consumed from the stores ledger: opening stock, plus purchases and freight inward, less closing stock. Count only material that goes into the product.
- Add direct labour from the wage register for operators who worked on this product, and direct expenses booked to it, such as job work charges.
- Add factory overheads. If the plant makes several products, share overheads out on a fair base: machine hours for a machine shop, labour hours for assembly.
- Adjust for work in progress at the start and end of the period, valued at works cost.
- Add quality control, process R&D, production admin and primary packing, and take off what scrap and by-products fetched. That gives cost of production.
- Adjust for finished goods stock to get cost of goods sold, then add general admin, selling and distribution to get cost of sales.
- Add your profit margin to reach the selling price, and divide by units produced or sold for the per-unit figures.
In the example above, Nordwerk made 4,000 gearbox housings in October at a cost of production of ₹33,28,000, or ₹832 a piece. It sold 3,800, and the cost of sales came to ₹929 a piece. A 12% margin on cost puts the price at about ₹1,040.
Part cost sheet: pricing one component for a quote
A buyer at an OEM doesn't want your monthly cost sheet. They want the cost of one piece, broken up so they can check each line. The second format does that, the way auto and engineering suppliers usually present it.
- Material: input weight times the material rate, less the scrap (input weight minus finished weight) at the scrap rate. Buyers check the weights against the drawing, so use real ones.
- Conversion: machine hour rate times cycle time, plus outside operations such as heat treatment, plating or painting.
- Machine hour rate: what a machine costs to run for an hour, including depreciation, power, tooling, maintenance, the operator and its share of space. Work it out per machine; a VMC and a manual lathe are very different.
- Rejection allowance, packing and freight, then overheads and profit as percentages, as most customers ask to see them.
Keep the material rate separate from conversion. When steel or casting prices move, most customers revise only the material line, on the index or rate the order names.
What goes where, and common mistakes
| Cost | Where it goes |
|---|---|
| Freight on purchases (inward) | Direct material |
| Freight to customers (outward) | Distribution overheads, not factory cost |
| Primary packing (the box the product can't be sold without) | Cost of production |
| Secondary packing (cartons and crates for transport) | Distribution overheads |
| Normal scrap and rejection | Credit what scrap fetches against cost of production |
| Abnormal loss (a fire, a strike, a batch destroyed) | Out of the cost sheet, straight to profit and loss |
| Interest, income tax, donations, loss on sale of assets | Out of the cost sheet |
- Loading all overheads on labour cost when the plant is mostly machines. Use machine hours for machine-heavy work.
- Valuing closing finished goods at selling price instead of cost of production.
- Using last year's material rate in a quote. Price material at today's rate and say how long the quote holds.
- Leaving out rejection and rework. If one piece in fifty is scrapped, the other forty-nine carry its cost.
Is a cost sheet compulsory?
For most businesses it is a management tool, not a statutory form. Companies in the industries listed in the Companies (Cost Records and Audit) Rules, 2014, and above the turnover limits those rules set, must keep cost records in Form CRA-1, and some of them need a cost audit. Check the rules for your products before you rely on a spreadsheet alone.
How to use this format
- Type into the white cells. Grey cells calculate themselves on the page and in the Excel file.
- Fill the statement of cost from your stores ledger, wage register and expense ledgers for the period.
- Enter units produced and units sold at the foot. The per-unit cost and price work themselves out.
- For a quote, use the part cost sheet tab: weights from the drawing, your machine hour rate and the cycle time from a trial or a similar part.
- Print or save as PDF, sign it, and keep it with the period's costing file or the quote.
Emplotec Manufacturing
Or let every job cost itself.
In Emplotec the cost sheet isn't put together at month end. Each work order collects its material, labour, machine time and overheads as the work happens, so planned and actual cost sit side by side while the job is still on the floor.
- Job costing covers material, labour, machine and overhead, planned against actual, with WIP valued from the same records.
- Scrap, rejection and rework are booked on the job card, so their cost lands on the job that caused it.
- A new quote starts from similar past drawings and what those jobs actually cost, not from a blank sheet.
- Ask Emplotec why a job's margin fell, and it shows which cost element moved and the documents behind it.
- All issues booked to WO-6120
- Scrap 1,112 kg credited
- Machine hours from job cards
- Variance over 3% reviewedCosting
Emplotec Castings for GH-220 now cost ₹115 a kg against ₹110 in the quote. At today's cost, Haldane's next schedule earns 8.1%, not 10%. Draft a revised quote with the material line updated?
WO-6120 job costPO-24518Quote QT-2291Job costing for a machining work order, planned against actual, with the agent's note on a quote. Example companies, people and figures.
Questions people ask about the costing sheet format
What is the format of a cost sheet?
Direct material, direct labour and direct expenses add up to prime cost. Factory overheads and the WIP adjustment give works cost; quality control, production admin and primary packing less scrap give cost of production; the finished goods adjustment, admin, selling and distribution give cost of sales; profit added gives sales.
What is the difference between prime cost and works cost?
Prime cost is only the direct costs: material, labour and direct expenses. Works cost, also called factory cost, adds factory overheads and adjusts for opening and closing work in progress.
How do I calculate cost per unit from a cost sheet?
Divide cost of production by the units produced for the production cost per unit, and cost of sales by the units sold for the total cost per unit. The lines at the foot of the format do both.
Where does freight outward go in a cost sheet?
Under distribution overheads, as part of cost of sales. Freight inward, on raw material, goes into direct material cost.
Which items are not included in a cost sheet?
Purely financial and abnormal items: interest and finance costs, income tax, donations, losses on the sale of assets and abnormal losses such as a fire. They go straight to the profit and loss account.
Is a cost sheet the same as a costing sheet for a quote?
Not quite. A cost sheet covers a product over a period. A part costing sheet prices one component for a customer, line by line: material less scrap, conversion, rejection, packing, overheads and profit. This page has both.
Sources
- ICAI Board of Studies: CA Intermediate study material, Cost and Management Accountinghttps://boslive.icai.org/
- ICMAI Cost Accounting Standards Board: CAS-4, cost of productionhttps://icmai.in/Home/CASB_Downloads
- Companies (Cost Records and Audit) Rules, 2014, Ministry of Corporate Affairshttps://www.mca.gov.in/
Related
Stop typing costing sheets by hand.
Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.