Emplotec Manufacturing

Promise dates your shop floor can keep.

MRP and a finite-capacity schedule check every order against your machines, and replan the moment a machine stops or a rush order lands.

Scheduling boardPlant 2 · week 46 · finite capacity
ShiftDayWeekAuto-schedule
On timeAll 18 work orders meet their promise dates · replan approved by Ravi Menon, 10:53
Workstation
Wed 11 NovA 06:00B 14:00
Thu 12 NovA 06:00B 14:00
Fri 13 NovA 06:00B 14:00
Sat 14 NovA 06:00B 14:00
Machining
CNC-0486%Turning centre
WO-5519Kessler GmbHWO-5527Triton MarineWO-5541Haldane Pumps
CNC-0591%Turning centre
WO-5522Kessler GmbHWO-5528Triton MarineWO-5544Stock
CNC-070%Down
5512BRK-318Down to Thu 14:00
Moved to VMC-02
VMC-0194%Vertical machining
WO-5525Triton MarineWO-5535Kessler GmbHWO-5546Haldane Pumps
VMC-0288%Vertical machining
WO-5524Kessler GmbHWO-5533Triton Marine
WO-5530Haldane Pumps · 200On time
Assembly
Assembly 178%Line 2
WO-5518Kessler GmbHWO-5521Haldane PumpsWO-5526Triton Marine
Assembly 271%Line 3
WO-5520Triton MarineWO-5529Kessler GmbHWO-5539Stock
10:52
SetupBreakdownLate against promiseMoved by the replanPromise date

CNC-07 breaks down on Plant 2's scheduling board (BRK-318), and WO-5530, 200 valve bodies for Haldane Pumps, turns six hours late. Emplotec finds room on VMC-02, which takes the same fixture, and Ravi approves the move: the work order moves and its promise date holds. Example companies, people and figures.

A manufacturing ERP from drawing to dispatch.

BOMs, planning, the shop floor, job work and job cost run on one system with your stock and accounts, and Inventory is included.

BOMs, routings and drawings

Every part's BOM, routing and drawing carries its revision, so the floor builds the current one.

  • Multi-level BOMs with versions and alternates
  • Routings, operations, workstations and capacities
  • Engineering change notes
  • A drawing register with revision control
  • BOM import from CAD exports and drawings

MRP and the schedule

Plan from real demand, load it onto real machines, and see what slips before you promise a date.

  • MRP from orders, OEM schedules, reorder levels and planner forecasts
  • What-if MRP beside the live plan
  • A finite-capacity scheduling board
  • Auto-scheduling on progress, breakdowns and rush orders
  • Delivery promises from the schedule

Work orders and the shop floor

Operators book work on a kiosk or the mobile app, with the right instructions for each operation in front of them.

  • Work orders, job cards and kiosk entry
  • Digital work instructions per operation
  • Setup sheets, tool lists and CNC programs as versioned documents
  • An operator certification check before a job card starts
  • Scrap, rejection and rework
  • Tool, die and mould life

Job work, both ways

Material you send out stays in your stock, and material customers send you is tracked as theirs.

  • Job work given: material out, received back and process loss
  • Job-worker reconciliation with ageing
  • ITC-04 from the challans
  • Job work received: customer job orders and customer-owned material
  • Return challans and conversion charges

Job cost and performance

Each job's real cost and each machine's performance come from the job cards themselves.

  • Material, labour, machine and overhead per job
  • Planned against actual, with WIP valuation
  • OEE and downtime
  • Throughput, queue and dwell time per operation
  • Quotes from similar past drawings and their actual job costs

Supplying OEMs

Schedules, part numbers, containers and quality packs, the way your OEM customers ask for them.

  • Delivery and cumulative schedules, with CRM & Sales
  • Customer part numbers and labels
  • Returnable containers and consignment stock
  • Heat and batch traced, with Inventory
  • PPAP, SPC and 8D, with Quality

MRP software with a what-if before you commit.

MRP explodes every multi-level BOM against orders, OEM schedules, reorder levels and planner forecasts, and lists what to make and what to buy. A what-if run shows what a rush order, a schedule change or a machine down would do, beside the live plan, without committing anything.

  • Demand from orders, OEM schedules, reorder levels and planner forecasts
  • Multi-level BOMs with alternates
  • Shortages raised as material requests for Procurement
  • What-if runs compared with the live plan
  • Nothing committed until a planner accepts
MRP run MRP-0461Plant 2 · weeks 46 to 50
Live planWhat-if
What-if400 more VB-40 valve bodies for Haldane Pumps by 18 NovNothing committed
VB-40C Valve body casting, rev CKaveri Castings · lead time 2 weeks · lot for lot · 440 on hand
CastingsW469 NovW4716 NovW4823 NovW4930 NovW507 Dec
Gross requirements160620live 220180200160
Scheduled receipts–200–––
Projected on hand280−140live 2600live 8000
Net requirements–140live –320live –200live 120160
Planned order receipts––320live –200live 120160
Planned order releases320live –200live 120160––
Emplotec

Castings set the limit. 260 valve bodies ship by 18 Nov from stock and PO‑3318; the other 140 fall inside the lead time and ship by 25 Nov. I’ve drafted a material request for 320 castings to release this week.

Accept what-ifOpen material requestDiscard

Production scheduling software that knows your machines.

The scheduling board loads every operation onto the workstation that runs it, at that machine's real capacity. When work runs late, a machine stops or a rush order lands, auto-scheduling re-sequences the plan, and the planner approves it before anything moves.

  • Finite capacity for every machine and line
  • Auto-scheduling on progress, breakdowns and rush orders
  • Breakdowns from Assets & Maintenance drop capacity
  • Promise dates passed back to CRM & Sales
  • Every replan shown as a plan to approve
Replan preview PLN-0047Plant 2 · week 47
Waiting for you
Rush order SO-2240 · Triton Marine · 120 bonnets by Tue 17 NovAuto-scheduled 09:12
Load against capacityBookedRushBefore
CNC-0483% 90%
VMC-0263% 73%
CNC-0593%
Assembly 173% 80%
Capacity 80 h a week, two shifts
Changes4 work orders
  • WO-5552Bonnets · Triton MarineNewCNC-04Mon 16 Nov, firstInserted
  • WO-5549Impellers · Haldane PumpsCNC-04VMC-02Tue 17 NovOn time
  • WO-5550Covers · Kessler GmbHTue 17Wed 18 NovVMC-02On time
  • WO-5551Housings · Kessler GmbHThu 19Fri 20 NovCNC-041 day lateNew promise 20 Nov, to CRM & Sales
Nothing moves on the floor until you approve.ApproveEditReject

Job costing and OEE from every job card.

Job cards book material, labour and machine time to the work order as the work happens, with overhead absorbed, so each job's actual cost sits beside its plan. OEE and downtime come from the same job cards and downtime logs, and past job costs feed the next quote.

  • Material, labour, machine and overhead per job
  • Planned against actual, line by line
  • WIP valuation
  • OEE and downtime by machine
  • Quotes from similar past drawings and their real costs
Job cost WO-5530Haldane Pumps · 200 valve bodies · closed 14 Nov
Planned vs actualCtrl E
CostPlannedActualVariance
Material₹5,20,000₹5,31,000+₹11,000+2%
Labour₹1,10,000₹1,08,000−₹2,000−2%
Machine₹2,40,000₹2,86,000+₹46,000+19%
Overhead₹90,000₹90,000₹00%
Total₹9,60,000₹10,15,000+₹55,000+6%
Per valve body₹4,800₹5,075WIP cleared to finished goods
OEE · VMC-02 · week 46From job cards and downtime logs
Availability88%11.5 h down
×
Performance90%vs std cycle
×
Quality96%8 reworked
=
OEE76%Target 75%
Emplotec

₹46,000 of the ₹55,000 is machine time: WO-5530 moved to VMC-02, a higher-rate machine, after CNC-07’s breakdown. I’ve drafted a note for Anand with each cause.

AKOpen draft

Built for the rules where you work.

The plant runs the same way in every market. What changes is how job work is recorded, the tax on what you dispatch and the currency.

Job work, ITC-04 and GST, built in.

Material at job workers stays in your stock, ITC-04 comes from the challans, and every dispatch reaches GST through Books.

  • Job work given and received, with ITC-04
  • Job-worker reconciliation with ageing
  • GST on dispatches and conversion charges, through Books
  • E-invoices on dispatch, through Books
  • Tally sync for accounts
  • ₹, Indian digit grouping and DD-MM-YYYY
ERP in India
  1. 1

    Job-work challan to Kaveri Castings

    JWC-0412
    Sent
  2. 2

    Castings back, process loss booked

    GRN-2290
    Received
  3. 3

    ITC-04 drawn from the challans

    ITC-04 · H2 2026-27
    For review
  4. 4

    Dispatch to Haldane Pumps with its e-invoice, in Books

    INV-2026-0418
    Invoiced

Hand Emplotec the replanning.

Ask in plain words. Emplotec reads orders, stock, capacity and job cards, then shows you a plan. Nothing moves on the floor until a planner approves.

  • “CNC-07 is down until Thursday. Reschedule and tell me which orders slip.”

    A new sequence and the customers affected, as a plan for the planner to approve.

  • “Can we take 400 more valve bodies for 18 November?”

    A what-if run against capacity and material, with nothing committed.

  • “Quote this drawing.”

    Similar past parts, their real job costs and problems, and a costed draft quote.

  • “Which job workers hold our material past 90 days?”

    Each job worker's material with its ageing, and the ITC-04 position.

Only on Emplotec

EmplotecAsk anything about the business
Anand Krishnan, Managing director

What did Sahyadri's rejected castings cost us this quarter, with rework, delays and debit notes?

ReadInspectionsJob cardsWork ordersDebit notes
  • Rework on 180 castings, on job cards: ₹1,44,000
  • 60 castings from heat H-221 scrapped: ₹1,62,000
  • Two work orders replanned, 41 machine hours: ₹61,500
  • Debit notes raised on Sahyadri: ₹2,10,000 recovered

Sahyadri's rejections cost ₹3,67,500 this quarter, and debit notes recovered ₹2,10,000, so ₹1,57,500 is still ours. I've drafted a summary for the vendor review, with every figure linked to its source.

Add to vendor reviewWaiting for your OK

A standalone MES or a Tally add-on holds only part of it. Emplotec has the inspections, the job costs and the vendor debits in one place.

One breakdown, from the machine to the customer.

Maintenance logs CNC-07 down, the schedule replans around it, and sales sees which customer to call, with nobody rebuilding a spreadsheet.

  1. Assets & Maintenance

    Maintenance logs CNC-07 down

    BRK-318Logged
  2. Manufacturing

    CNC-07's capacity drops until Thursday

    CNC-07 · Plant 2Down
  3. Manufacturing

    Schedule replanned, Ravi approves

    Plan · week 46Approved
  4. Manufacturing

    A slipping order gets a new promise date

    SO-2238 · 21 NovUpdated
  5. CRM & Sales

    Meera sees which customer to call

    SO-2238To call

Works with the rest of Emplotec

Deep enough for a job shop.

The parts of manufacturing that spreadsheets and add-ons get wrong are built into the core.

  • Actual job costing

    Each job carries its actual cost, with a standard cost for quotes and the variance between them.

  • Job work stays in your stock

    Material at a job worker stays in your inventory until it comes back, so ITC-04 comes from the challans.

  • Revisions on every BOM

    BOMs, routings and drawings carry revisions, and an engineering change note records each change.

  • Finite capacity, every replan

    The board loads each machine only up to its capacity, and each replan is a plan a planner approves.

  • One ledger under every work order

    Every work order posts through the same stock and ledger engines as the rest of Emplotec.

  • Tested before every release

    The manufacturing costing suite and the plan-to-produce flow must pass before anything ships.

Shaped around how your plant runs.

Our team fits Manufacturing to your plant when you start, and Emplotec changes it on request once an admin approves.

  • Routings and inspection plans per part
  • Job-card fields and shop-floor screens
  • ECN approvals
  • Scheduling rules
  • Job-work challan formats

Keep Tally for accounts.

Production, stores and job work on Emplotec, accounts synced to Tally, until the move to Books. The migration agent brings your items and stock across from Tally and Excel, and proves the move against the source.

  1. We map your items, BOMs and routings with your team.
  2. The migration agent moves them, after a dry run you check.
  3. Stock is tied out against the source, item by item.
  4. Accounts keep syncing to Tally while the plant runs on Emplotec.
  5. Move the accounts to Books when you choose.

Manufacturing: questions buyers ask

Is Emplotec Manufacturing a complete manufacturing ERP?

Manufacturing covers BOMs, MRP, scheduling, the shop floor, job work and job costing, and Inventory is included. Add CRM & Sales, Procurement, Quality and Books and it becomes the complete Emplotec ERP, on one data model and one ledger.

Does the MRP plan against machine capacity?

MRP works out what to make and buy from orders, OEM schedules, reorder levels and planner forecasts. The finite-capacity scheduling board then loads each operation onto its machine at real capacity, and promise dates come from that schedule.

What happens when a machine breaks down?

Maintenance logs the breakdown, the machine's capacity drops, and auto-scheduling re-sequences the work around it. Emplotec shows which orders slip and proposes new promise dates, and the planner approves the plan before anything moves.

Does it handle job work and ITC-04?

Yes, both ways. Material sent to job workers stays in your stock until it returns, with process loss, reconciliation and ageing, and ITC-04 comes from the challans. Job work you do for customers tracks their material, return challans and conversion charges.

Can we keep Tally for our accounts?

Yes. Production, stores and job work on Emplotec, accounts synced to Tally, until the move to Books.

How is Emplotec Manufacturing priced?

Manufacturing is licensed as a product, with Inventory included. Planners and stores use full seats, shop-floor kiosks use device seats, and the MD and plant head use lower-priced team seats. We quote once we've seen how your plant runs.

How long does it take to go live?

Your data is moved in 48 hours, and you're live in 30 days. Your proposal sets out what live covers: which plants, companies and products.

What doesn't Manufacturing do?

Emplotec doesn't cover process manufacturing, such as formulas, potency and GMP. Scheduling is a finite-capacity board with auto-scheduling, not a constraint-based optimiser, and OEE comes from job cards and downtime logs, not machine sensors. It doesn't integrate with PLM or CAD tools, though BOMs import from CAD exports, and planners enter their own forecasts rather than the system predicting demand.

See Manufacturing on your own numbers.

Tell us how your business runs, and we’ll show you Emplotec Manufacturing working the way you do.

  • A call within one working dayFrom the people who build it, not a sales team.
  • Your data moved in 48 hoursLive in 30 days. Your proposal says what “live” covers.
  • Cloud or your own serversThe same build either way, with your own database.
WhatsApp