ERP for the plastic and rubber moulding industryMoulds set your capacity. Now your plan knows it.
For injection, blow and compression moulders: every mould with its cavities, shots and owner, every machine by tonnage, regrind held to each customer's limit, and part cost at this week's resin price. One system, with an agent that works across all of it.
- Runs onManufacturing · Inventory · Assets & Maintenance · Quality · Procurement · CRM & Sales · Planning
- Fitted to youYour fields, rules, documents and screens
- Going liveData moved in 48 hours, live in 30 days
This is the app. Click any page on the left, and ask Emplotec on each one.
Emplotec Stop M-218 tonight from 22:00 to 03:00. Senthil's toolroom replaces the cavity 3 gate insert and does the PM in the same stop, and four cavities from Thursday finish Ostra's 20,400 by Friday 21:45.
M-218 history cardWO-7731Ostra scheduleIn this example, Kadaiya Polymers runs its Daman moulding shop on Emplotec. Mould M-218 is running on three of its four cavities, Ostra's lint filters would fall 2,700 short on Friday, and Emplotec has a plan waiting for Anand. Click through the floor, the machine and mould board, the mould register, compounds, new parts and PPAP, resin, scrap and part cost. Example companies, people and figures.
Every mould, every shot, every kilo of resin.
Emplotec follows Ostra's lint filters from the resin store through the presses and the toolroom, and people approve every plan it drafts.
The resin store
PP is 8,400 kg short, and three quotes are read into one comparison.
Gujarat Polychem, for Anand to award
The moulding floor
M-218 runs on 3 cavities, so Emplotec plans tonight's stop for the gate insert.
Finishes Fri 21:45, if approved
The toolroom
Shots from every job card count toward M-218's PM, so it joins tonight's stop.
4,94,600 of 5,00,000 shots
Scrap and regrind
Runners go back as regrind, within the limit each customer allows.
Nirmal parts: 12.4% of 15%
Dispatch
The e-invoice and e-way bill go together, and Ostra's trays are logged out.
26,000 lint filters by 20 Nov
Part cost
PP is up ₹11.20 a kg, so Ostra's price revision letter is drafted for Meera.
About ₹9.4 L a quarter
Does your moulding shop's week look like this?
These are the moments the whiteboard and the shot register stop working for moulders.
A cavity is blanked on the night shift. Planning finds out when the OEM asks where its parts are.
WhatsApp and the shift registerThe supervisor blanks the cavity on the job card. The board drops the mould's rate at once, shows which schedule slips and proposes the stop that saves it.
Preventive maintenance happens after the mould breaks, because nobody added up the shots.
A shot registerShots from every job card add to the mould's counter. PM is planned by shot count, and the board warns before a mould reaches it mid-run.
Twenty moulds in your racks belong to customers. An OEM audit asks for one mould's history and condition.
Excel and memoryEvery mould has its owner, the customer's asset tag, shots, repairs and condition on one history card. Idle moulds are flagged before they become a dispute.
Regrind goes back into the hopper without anyone checking that customer's limit, and scrap is weighed only at month end.
A scrap registerRunners and sorted rejects come back as regrind by grade and colour. Issues are checked against each customer's limit, and virgin-only parts block regrind outright.
Resin moves every fortnight. Part prices and quotes still assume June's rate.
An Excel costing sheetEvery part is costed at today's resin price and its net shot weight. Emplotec shows which parts lost margin and drafts the revision your agreement allows.
The machine and mould plan is on a whiteboard. Tonnage, mould changes and colour sequence live in the PPC head's head.
A whiteboardA finite-capacity board by machine, with each mould's tonnage and fit, change times and a light-to-dark colour sequence. It replans when a cavity or a machine stops.
A new part for an auto OEM is two weeks from SOP. The trial reports, the gauge study and the PPAP pack are spread across three people's laptops.
Folders and emailEach new part runs from feasibility through mould design, T0 and T1 trials to PPAP and the signed warrant, with tooling cost, payment and the mould's owner on the same record.
One plastics ERP, from the OEM's schedule to the part's real cost.
Planning, moulds, the shop floor, resin stores, regrind, quality and accounts run on one system, set up for moulding. Moulds, resin, quality and money share the same data from day one.
- Cavities running set the rate on the board
- Tool, die and mould life from job cards
- Part cost at today's resin price
- Resin lots traced forward and back
- Regrind as its own stock, by grade and colour
- The OEM's returnable trays tracked
- PM by shots, not by memory
- Customer-owned moulds with their asset tags
- Refurbish or replace from the history card
- Quotes read into one comparative statement
- Landed cost and the vendor's MFI record
- MSME payment dates on every resin bill
- OEM schedules and cumulative quantities
- Returnable trays and consignment stock
- Price revisions from the agreement's resin clause
- Part weight and dimensions by cavity
- MFI checked against the resin lot
- Rejects reach the cost and the vendor
- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario
- Received
- GRN 5481, 28 Oct
- Quantity
- 6,000 kg, 240 bags
- MFI on certificate
- 12.3
- MFI, our test
- 12.1
- Left in stores
- 620 kg
- Murugan blanked cavity 3 after the first-hour check found short shots
- Emplotec set M-218 to 3 cavities on the board and flagged Ostra's week 46
- Senthil found the cavity 3 gate insert worn and reserved a spare from stores
- PM-0631 PM at 4,50,000 shots completed, 18 of 18 checks
- Plan
- First-hour, then every 2 h
- Resin lot
- GP-2610-31
- Masterbatch lot
- CT-0922
- Colour ΔE to master
- 0.6, limit 1.0
- Inspector
- Divya Menon
Emplotec Cavity 3 has run short since 22:20. The same gate insert wore at 3,90,000 shots in March. I've drafted NCR-0212 and the sorting instruction.
Job cardsM-218 history cardEmplotec Gujarat Polychem costs ₹8,400 more than Coastline on this order, arrives before the need date and has no MFI rejections. Recommended.
Vendor ratingMRP-0219One schedule, from Ostra's email to cash.
Ostra's week 47 lint filters, followed through every product they touch. Nobody re-enters anything, and every step is a record you can open.
- 01 · CRM & Sales
Ostra's schedule comes in
Ostra emails schedule rev 9. Emplotec reads the PDF into schedule lines and shows what changed, and Meera accepts 26,000 lint filters for week 47.
Schedule rev 9 · 4471-TL7 - 02 · Manufacturing
MRP turns parts into resin
MRP multiplies each part by its net shot weight, takes off the regrind each customer allows and adds masterbatch at its dosage. PP for Ostra's parts comes out 8,400 kg short.
MRP-0219 · weeks 47 and 48 - 03 · Procurement
Three quotes, one purchase order
Quotes arrive by PDF, email and WhatsApp and are read into one comparison. Anand awards Gujarat Polychem on delivery and MFI record, and the reason is kept with the award.
PO-2214 · Gujarat Polychem - 04 · Quality
Received by lot, MFI checked
The truck is logged at the gate and the GRN carries the resin lot from the certificate. Divya runs the MFI test and the lot is released to the resin store.
GRN 5520 · lot GP-2611-14 - 05 · Manufacturing
Moulded, counted by the shot
M-218 runs on all four cavities. Each shift's job card books shots, good parts and rejects, the runner goes back as regrind, and the shots add to the mould's PM counter.
WO-7790 · M-218 on IMM-09 - 06 · Books
Dispatched in Ostra's trays, invoiced, paid
Dispatch raises the e-invoice and e-way bill together and logs the trays out. The invoice posts to the ledger, and Ostra's payment matches by itself when it lands.
INV-2026-0947
Ask your moulding shop anything.
Emplotec reads across moulds, machines, resin, quality and accounts at once. It answers with the records it used, and anything it would change waits for your approval.
Yes. Raise PO-2214 to 9,500 kg and move the hinges to IMM-07, and all 39,000 ship in week 48 with nothing else slipping. I've drafted the reply for Meera.
Three customer-owned moulds have sat for over a year. I've drafted a note to each customer asking them to confirm, collect or retire the mould, and a condition check for M-064 before anyone asks.
Once. WO-7702 used 25 kg of PA6 regrind on 3 November. None of it has shipped: hold lot FG-1103 and block regrind issues to Meridian work orders from now on.
ITC-04 is ready with 24 lines. Shree Pad Printers owe 180 plates beyond the norm, and I've drafted a debit note. Your accountant files the return.
Can we take 15,000 more lint filters in week 48?
Machine and mould boardM-218 shots and PMResin stock and ordersSchedules- Running a what-if on IMM-09 for week 48
- Checking M-218's shots against its next PM
- Checking PP against PO-2214
- Testing every other promise date
- 39,000 in week 48 needs M-218 for 98 hours on four cavities
- M-218 stays under its next PM at 5,50,000 shots
- PP needs 1,050 kg more than PO-2214 brings
- Ostra's hinges move to IMM-07, which is free after rev 9
Yes. Raise PO-2214 to 9,500 kg and move the hinges to IMM-07, and all 39,000 ship in week 48 with nothing else slipping. I've drafted the reply for Meera.
- OS-4471 · week 48
24,00039,000 - PO-2214 · PP
8,400 kg9,500 kg - M-276 · Ostra hinges
IMM-09IMM-07
Nothing changes until you approve.
Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works
Your shop's way of moulding, not ours.
Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.
JC-40217WO-7731 · lint filter OS-4471- Machine
- IMM-09 · 250 T
- Mould
- M-218 · 4 cavities
- Shift
- B, Thu 12 Nov
- Shots
- 820
- Good
- 3,262
- Rejects
- 18
- Hopper dryer temperature80 °C
- Masterbatch dosage2.0%
- Shift in-charge sign-off
- Block the job card if the mould is past its PM shot count
- Tell the planner the moment a cavity is blanked
- Shots added to the mould's counter4,97,600
- Regrind checked against the customer's limit
- Print Ostra's tray label with the cavity number
- Meridian parts: first-off from every cavity before release
The core stays the same for every customer, so all of this carries through every upgrade.
Need software Emplotec doesn't have? We build it.
Emplotec is built by a software company. If your shop needs something outside the ERP, such as a link to your moulding machines' controllers or a portal for your toolroom, our team builds it and connects it to Emplotec, under the same support.
- A shot-count link from your moulding machines' controllers
- Your OEM's supplier portal, connected to your schedules and ASNs
- A portal where your mould maker posts repair and trial reports
- Your old mould history cards, moved and kept searchable
Built for the rules where you mould.
Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.
India
- GST e-invoices and e-way bills raised at dispatch
- Job work and ITC-04, including moulds sent out for repair
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates tracked on every resin bill
- Depreciation on your own moulds under the Companies Act and Income Tax
- Tally sync, if your accounts stay in Tally for now
UAE
- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Customer-owned moulds tracked by owner and asset tag
Saudi Arabia
- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Shot counts and mould life per mould
United Kingdom
- VAT with Making Tax Digital
- PAYE payroll with RTI
- Customer-owned tooling tracked by owner and asset tag
United States
- Sales tax, state by state
- Payroll
- 1099 forms
- Customer-owned tooling tracked by owner and asset tag
Live in 30 days, without stopping a machine.
We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which units, products and companies. The system is set up for moulding, then fitted to your shop's own workflow, so moulds, shots, regrind and compounds read the way your team already works.
- We map your shop first: machines by tonnage, moulds by cavity and owner, and how each shift reports shots today.
- Your mould list with shot counts, BOMs with shot weights, open schedules, resin stock and balances come across from Tally and Excel.
- We fit the job card, the mould register, regrind rules and your documents to the way your shop works.
- Your PPC, toolroom, stores and supervisors train on your own data, then go live machine by machine.
Questions moulders ask
What is the best ERP for a plastic manufacturing company?
One that knows moulds and cavities set your capacity, counts shots to each mould's PM, keeps customer-owned moulds on record, holds regrind to each customer's limit and costs parts at today's resin price, on the same ledger as your accounts. Emplotec does all of that in one system, with an agent across it, fitted to your shop.
Does Emplotec track mould life and shot counts?
Yes. Shots from every job card add to the mould's counter, against its PM interval and its design life. Preventive maintenance is planned by shot count in Assets & Maintenance, and a blanked cavity changes the mould's rate on the schedule at once.
Can it handle moulds our customers own?
Yes. Each mould is on the register with its owner, the customer's asset tag, location, shots, repairs and condition, and the customer's page lists every mould you hold for them. Moulds that haven't run in a set time are flagged.
How does it handle regrind and scrap?
Runners and sorted rejects come back as regrind stock by grade and colour. Issues are checked against the limit you set per customer or part, and virgin-only parts can block regrind outright. Rejections are recorded by defect, mould and cavity, and their cost shows against the part.
Does it work for blow moulding and rubber moulding?
Yes. Blow moulders run the same moulds, machines, shot weights and job cards for bottles, cans and jerrycans. Rubber moulders run compression presses with cavities and trim rejects, and buy compound as an item with its batch.
Does it handle new part development and PPAP for auto customers?
Yes. Each new part runs from feasibility and mould design through T0 and T1 trials to the PPAP pack: PFMEA, control plan, dimensional results by cavity, material certificates, the gauge study and capability run, and the part submission warrant. Tooling cost is recorded with who pays for it, in advance or amortised over parts, and customer complaints run as 8D.
Does it run payroll for our shifts and contract workers?
Yes, with Emplotec HRMS. Biometric attendance, shifts, overtime and contract labour flow into payroll with PF, ESI, Professional Tax and LWF, and post to your accounts on the same ledger.
Can we keep Tally for our accounts?
Yes. Production, moulds, stores and job work run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.
Can you customise it for the way our shop works?
Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for moulders; and extensions for your own workflow. The core is never forked, so your changes survive upgrades.
Does it run on our own servers?
Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.
What doesn't Emplotec cover for moulders?
Live monitoring from machine controllers or sensors: shots come from job cards and counter readings. Mould design, mould flow simulation and CAD integration. Compounds and masterbatch are covered: each runs as its own item with a mixing BOM, made batch by batch with its ingredients and yield recorded.
See Emplotec run your plastics and rubber moulding business.
Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.
- A call within one working day, from the people who build it, not a sales team.
- Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
- Cloud or your own servers, the same build either way, with your own database.