Emplotec Quality

Stop a bad batch at the gate.

Every inspection holds or releases the stock it checks, so rejections reach the vendor, the NCR and the cost in the same system.

QI-0452 · Incoming inspectionGRN-8840 · PO-4462 · Tue 17 Nov, 10:42MGMuruganInspectorRejected
Lot200 nosVB-640 valve bodyHeatH-236Sahyadri FoundrySample13IS 2500 · S-4 · AQL 1.0Rejects found2accept 0, reject at 1
#CharacteristicSpecificationGaugeResult
10Material grade, by heatEN-GJS-500-7Test certificateMTC-1187As certified
20Hardness170 to 230 HBBrinell testerHT-022 over limit
30Bore Ø42.00±0.05 mmBore gaugeBG-1113 in limit
40Flange face, porosityNone visibleVisual, with photoNone found
50Wall thickness8.0 mm minimumUltrasonic gaugeUT-0413 in limit
Hardness, 13 readingsHB · limits 170 to 230
200 castings in QC bay Q2Hosur plant · not available to productionBlocked · NCR-0201

Heat H-236 from Sahyadri fails its hardness check at the gate. Sneha asks Emplotec to deal with it: it drafts the NCR, the stock block, the debit note and an 8D request to Sahyadri, and once she approves, the lot is blocked and the request goes out. Example companies, people and figures.

QMS software, from the gate to the customer.

Every inspection belongs to a receipt, a job, a batch, a site or a dispatch, so a failed check holds the stock, raises the NCR, reaches the vendor's rating and shows its cost.

Inspection everywhere

Incoming, in-process, first-off and final checks, each with its plan, its sample and the stock it holds.

  • Inspection plans with AQL sampling from the IS 2500 and ISO 2859 tables
  • Readings, photos and signatures on mobile, offline
  • Stock held in QC until a person releases it
  • Test certificates checked against specification by heat
  • Checklist packs for food (HACCP), construction and garments

NCR, CAPA and 8D

A failed check becomes an NCR, and a repeat becomes a CAPA that is checked before it closes.

  • NCR dispositions: use as is, rework, return or scrap
  • CAPA with 5 Why and fishbone
  • An effectiveness check before a CAPA closes
  • 8D for customer complaints, with occurrence and escape causes

Core tools for OEMs

The tools automotive customers audit, kept where the work happens.

  • PFMEA in the AIAG-VDA format
  • Control plans linked to the PFMEA and the inspection plans
  • PPAP packs with the PSW at each submission level
  • X̄-R charts with Cp and Cpk
  • APQP, MSA and layered process audits

Gauges and calibration

Every gauge has a schedule and a certificate, and an overdue one can't be used.

  • Gauge register and calibration schedule
  • Certificates from NABL labs
  • Overdue gauges blocked from inspections
  • A failed calibration lists the inspections it touched

Audits, suppliers and documents

The evidence an auditor asks for is kept as you work, not rebuilt once a year.

  • Internal audits with findings and actions
  • Corrective-action requests, PPAP submissions and supplier audits on the vendor portal
  • Incoming rejections into vendor rating
  • Controlled documents, read and acknowledged
  • Management review

Cost of poor quality and safety

What poor quality costs, and what happened on the floor, on the same records.

  • Cost of poor quality by job, part, customer, defect and machine
  • Incidents, near misses and dangerous occurrences
  • HIRA, safety inspections and toolbox talks
  • Near misses reported free by anyone

Quality control software on the inspector's phone.

The inspector opens the plan on the phone: the characteristics, the sample size from the IS 2500 tables and the gauge to use. Readings, photos and the signature go in, offline if they must, and the result holds the lot in QC or releases it to stores. A gauge past its calibration date can't be picked.

  • Sample sizes and accept numbers from the AQL table
  • Readings, attributes, photos and signatures
  • Works offline at the gate and on the line
  • Overdue gauges blocked from the inspection
  • Stock released only when a person signs
Gauges · Hosur QC lab
  • PG-32Plug gauge Ø32 H7Was due 12 NovBlocked
  • BG-11Bore gauge Ø42Due 30 NovDue soon
  • HT-02Brinell testerDue 9 JanIn date
  • PG-33Plug gauge Ø32 H7Due 4 MarIn date

PG-32 is at Sigma Metrology, a NABL lab, back Fri 20 Nov

CAPA software, with 8D for customer complaints.

A customer complaint opens an 8D with the dispatch, the heat, the work order and the machine already on it. Each discipline from D0 to D8 is recorded, the root cause names why it happened and why it escaped, and the CAPA stays open until its effectiveness check passes.

  • Ford's 8D, D0 to D8
  • Occurrence and escape root causes
  • Actions with owners and due dates
  • An effectiveness check before closing
  • Similar past problems shown beside the new one
8D-046 · Flange leak at Haldane PumpsComplaint CC-0114 · 6 of 120 valve bodiesD5 in progress
DN-2231Heat H-218WO-5509VMC-02, Line 3
  1. D0 Prepare
  2. D1 TeamSneha, Ravi, Senthil
  3. D2 Problem6 of 120 leak
  4. D3 Containment38 checked, 0 leak
  5. D4 Root causeOccurrence and escape
  6. D5 Permanent actions
  7. D6 Implement
  8. D7 Prevent recurrence
  9. D8 Close and thank

D4 Root cause

Why it happened

Flange face cut with a worn insert on VMC-02; tool life was set at 800 parts.

Why we missed it

The leak test sampled 1 in 50 at final inspection, so 6 leaking bodies shipped.

D5 Permanent actions

ActionOwnerDueStatus
Tool life on VMC-02 cut to 500 partsRM20 NovDone
Leak test on every body at final inspectionSN24 NovIn progress
PFMEA step 40 and the control plan updatedSN27 NovOpen
Insert wear checked at first-off, every shiftSN24 NovOpen
Effectiveness checkNo leak complaints from Haldane for 90 days after D8Due 25 Feb 2027
Seen before: NCR-0177, August

The same tool-life fix closed that CAPA, and leaks came back six weeks later. Add an insert-wear check at first-off?

Added to D5 by Sneha

FMEA software, linked to the control plan and SPC.

Each PFMEA step in the AIAG-VDA format carries its action priority and links to the control plan, which links to the inspection plan and the gauge. The readings inspectors take build the X̄-R chart, so a drifting characteristic shows before parts fail, and the PPAP pack draws on the same records.

  • AIAG-VDA PFMEA with action priority
  • Control plans linked to PFMEA and inspection plans
  • X̄-R charts with Cp and Cpk on critical characteristics
  • PPAP packs with all 18 elements and the PSW
Bore Ø42.00 ±0.05 · VB-640Line 3 · VMC-02 · 5 parts every hourX-RHistogram
PFMEA step 40Bore oversize, leak at the seatS 8 · O 4 · D 7 · AP HighControl plan CP-VB640 · 4Special characteristicX-R, n 5, hourlyGauge BG-11Bore gaugeCalibrated to 30 Nov

X Sample means, mm

UCL 42.017X 42.003LCL 41.989Drift from sample 18

R Ranges, mm

UCL 0.051R 0.024

Capability, last 25 samples

Cp1.62Cpk1.05Control plan asks for 1.33Out of control4points over the UCL
The bore is drifting toward its upper limit

Since sample 18 the mean has climbed 0.019 mm and Cpk is down to 1.05. Raise an NCR and hold the last hour’s 40 bodies?

NCR-0204 raised · 40 bodies held

EHS software for the plant floor.

Anyone reports a near miss or an unsafe act from the mobile app, free. Incidents and dangerous occurrences carry their notices under the OSH Code, safety inspections, HIRA and toolbox talks are scheduled, and every action runs on the same engine as CAPA. Emplotec doesn't cover full EHS for ISO 45001 and ISO 14001, environmental monitoring or waste returns.

  • Near misses reported free, by anyone
  • Incidents and dangerous occurrences, with OSH Code notices
  • Safety inspections, HIRA and toolbox talks
  • Actions tracked on the CAPA engine
Safety · Hosur plantNovember · incidents, near misses and inspectionsReport
Near misses9from 7 peopleIncidents1no one hurtInspections14 of 162 this weekOpen actions51 overdue
INC-0012Dangerous occurrenceHydraulic hose burst on press P-04No one hurt · Thu 12 NovNotice ready
NM-0088Near missForklift reversed past the press shop doorReported by Senthil on the appAction open
SI-0141Safety inspectionPress shop, weekly: 18 of 202 findings, both actionedDone
TT-0213Toolbox talkLockout before a tool change22 signedDone
HIRA-07HIRA reviewPaint shop, yearly reviewOwner Ravi MenonDue 30 Nov
INC-0012 · actions on the CAPA engine
  • Replace the hoses on presses P-01 to P-06KDDue 21 Nov
  • Hose change added to the preventive planRMDone
Notice under the OSH Code, drafted from INC-0012

What happened, where, when and the actions taken, for Ravi to review and file by Thu 19 Nov.

Reviewed by Ravi, ready to file

Built for the rules where you work.

Inspection runs the same way in every market. What changes is the sampling standard you cite, the safety notices and the tax on a vendor's debit note.

IS 2500 sampling, NABL certificates, OSH Code notices.

Samples come from the IS 2500 tables, gauges carry certificates from NABL labs, accidents and dangerous occurrences carry their notices under the OSH Code, and every debit note to a vendor carries GST through Books.

  • IS 2500 and ISO 2859 sampling tables
  • Calibration certificates from NABL labs
  • Material test certificates checked by heat
  • Accident and dangerous-occurrence notices under the OSH Code
  • Debit notes with GST, through Books
  • The PDIR, the pre-dispatch inspection report
ERP in India
  1. 1

    Sample of 13 drawn from the IS 2500 tables

    QI-0452
    Sampled
  2. 2

    The hardness tester's NABL certificate in date

    HT-02
    In date
  3. 3

    Debit note to Sahyadri Foundry with GST, through Books

    DN-131
    Posted
  4. 4

    Notice for the press hose burst, under the OSH Code

    INC-0012
    Drafted

Hand Emplotec the paperwork.

Ask in plain words. Emplotec reads the inspections, the heats, the job cards and the complaints, then shows you a plan. No stock is released and no CAPA is closed until a person approves.

  • “Draft the 8D for Haldane's complaint.”

    From the dispatch, the batch's history, the inspection records and similar past problems, for the quality engineer to complete.

  • “Why did rejections on Line 3 go up this month?”

    It breaks them down by defect, shift, machine, operator and material heat, with every figure linked to its records.

  • “Which gauges are due for calibration, and which inspections would stop if they lapse?”

    It lists each gauge with its due date and the inspection plans that depend on it.

  • “Which CAPAs closed last quarter without the defect going away?”

    It checks each closed CAPA against the defects recorded since, and lists the ones that came back.

Only on Emplotec

EmplotecAsk anything about the business
Anand Krishnan, Managing director

Which customer complaints this quarter trace back to the same heat, machine or operator, and what did they cost us?

ReadComplaintsDispatchesBatch historyJob cardsInspectionsLedger
  • 3 of 7 complaints trace to Sahyadri heats H-214 and H-218
  • 2 trace to VMC-02, already under 8D-046
  • No pattern by operator or shift
  • Returns, rework and freight so far: ₹4,86,000

Sahyadri's heats cost us ₹3,12,000 this quarter, more than any machine. I've drafted a corrective-action request to Sahyadri with all three complaints, for Sneha to approve.

Review planWaiting for your OK

A standalone QMS sees the complaint, not the shop floor or the money. This answer needs the dispatch, the heat, the job cards, the inspections and the ledger on one record.

From the gate to the vendor's 8D.

A heat of castings fails its hardness check at the gate. The stock is blocked, the vendor is debited and asked for an 8D, their rating drops, and the cost shows against the part.

  1. Procurement

    The GRN puts 200 castings from heat H-236 into QC

    GRN-8840In QC
  2. Quality

    Hardness fails on 2 of 13 samples; the lot is rejected

    QI-0452NCR raised
  3. Inventory

    The 200 castings are blocked, and none reach the line

    NCR-0201Blocked
  4. Procurement

    Return and debit note; Sahyadri answers in 8D on the portal

    DN-131Debited
  5. Quality

    Sahyadri's rating drops, and the cost shows against VB-640

    COPQ · NovRecorded

Works with the rest of Emplotec

Deep enough for an OEM's auditor.

The core tools, sampling tables and calibration rules your customers audit are built in, and every record keeps its history.

  • AIAG-VDA PFMEA with action priority

    Process FMEA in the AIAG-VDA format, linked to the control plan and the inspection plans that carry it out.

  • PPAP at levels 1 to 5

    PPAP packs with all 18 elements and the PSW, at the submission level each customer asks for.

  • Sampling by the AQL table

    Sample sizes with accept and reject numbers from the IS 2500 and ISO 2859 tables, set per characteristic.

  • Overdue gauges can't be used

    A gauge past its calibration date is blocked from inspections, and a failed calibration lists every inspection it touched.

  • Traced by heat, end to end

    From the supplier's test certificate to the customer's dispatch, so containment starts from facts.

  • Statutory notices under the OSH Code

    Accidents and dangerous occurrences carry their notices under the OSH Code, with due dates in Compliance.

Shaped around how you inspect.

Our team fits Quality to your plant when you start, and Emplotec changes it on request once an admin approves.

  • Inspection plans and checklists
  • Sampling rules
  • NCR dispositions and approvals
  • The 8D and CAPA forms each OEM asks for
  • PPAP levels by customer
  • Vendor rating weights
  • Certificate and report formats

Move from Excel, paper and phone photos.

Your inspection plans, gauges, open NCRs and CAPAs come in by bulk import, with a dry run before anything lands, so the next audit draws on records instead of folders.

  1. We map your inspection plans, sampling rules and dispositions with your team.
  2. Gauge list and calibration certificates imported.
  3. PFMEAs and control plans brought in from Excel.
  4. Open NCRs and CAPAs carried over.
  5. Inspectors start on the mobile app.

Quality: questions buyers ask

Can Emplotec Quality be used on its own?

Yes, for a business that wants audits, CAPA and checklists first. Inspections hold and release stock once Inventory is in, and rejections reach the vendor through Procurement, so most plants run all three.

Does it cover the core tools automotive customers audit?

Yes: PFMEA in the AIAG-VDA format, control plans, PPAP packs with the PSW at levels 1 to 5, X̄-R charts with Cp and Cpk, APQP, MSA and layered process audits. Emplotec doesn't cover design FMEA, or SPC beyond X̄-R charts and Cp and Cpk.

Which sampling tables does it use?

The IS 2500 and ISO 2859 AQL tables. Each inspection plan sets the level and AQL per characteristic, and the record shows the sample size with its accept and reject numbers.

Can inspectors record results offline?

Yes. The mobile app shows the plan's characteristics, sample and gauges, takes readings, photos and signatures without a connection, and syncs when it returns.

What happens when a gauge is overdue for calibration?

It can't be used on an inspection until it's calibrated again. Certificates from NABL labs are kept on the gauge, and a failed calibration lists every inspection the gauge touched.

Does Emplotec release stock or close a CAPA on its own?

No. Emplotec drafts NCRs from rejections, suggests CAPAs from past problems and drafts 8Ds. A person releases stock, approves every disposition and closes every CAPA.

Does it cover safety, or EHS?

It covers incidents, near misses and dangerous occurrences with their notices under the OSH Code, HIRA, safety inspections and toolbox talks, with every action on the CAPA engine. Emplotec doesn't cover full EHS for ISO 45001 and ISO 14001, environmental monitoring or waste returns.

Is it for pharmaceutical manufacturing?

No. Emplotec doesn't cover pharmaceutical GMP, electronic batch records or 21 CFR Part 11 validation, or lab information management with instrument integration.

How is Emplotec Quality priced?

Quality is licensed as a product. Quality engineers and managers use full seats; inspectors use team seats, priced lower; shared lab and line tablets use device seats. Anyone on a seat reports a near miss or a quality problem free, and suppliers on the vendor portal and certification auditors are free. We quote once we've seen how you work.

See Quality on your own numbers.

Tell us how your business runs, and we’ll show you Emplotec Quality working the way you do.

  • A call within one working dayFrom the people who build it, not a sales team.
  • Your data moved in 48 hoursLive in 30 days. Your proposal says what “live” covers.
  • Cloud or your own serversThe same build either way, with your own database.
WhatsApp