ERP software for the manufacturing industryThe whole plant on one system. Ask it anything.
From the OEM's schedule to the last job card and the job's real cost: sales, planning, the shop floor, job work, quality, stores and accounts in one system, with an agent that works across all of it.
- Runs onManufacturing · Inventory · Quality · Procurement · CRM & Sales · Books · Assets & Maintenance · HRMS · Compliance · Field Service · Planning
- Fitted to youYour fields, rules, documents and screens
- Going liveData moved in 48 hours, live in 30 days
This is the app. Click any page on the left, and ask Emplotec on each one.
Emplotec VMC-02 takes the same fixture as CNC-07 and is free from Thursday 06:00 for 32 hours. Moving WO-5530 there keeps Haldane's date.
BRK-318WO-5530FixturesIn this example, Nordwerk Components runs its Hosur plant on Emplotec. CNC-07 is down, WO-5530 for Haldane Pumps is at risk, and Emplotec has a plan waiting for Anand. Click through the plant, the schedule, job work, quality and job cost. Example companies, people and figures.
Emplotec's round, from the OEM's schedule to the job's cost.
Every morning Emplotec reads each part of the plant on one system and brings the few things that need a person. It drafts and plans; people approve.
The OEM's schedule
Haldane emails schedule rev 14. Emplotec reads the PDF and shows what changed from rev 13.
3 lines changed, waiting for Meera
Gate and stores
Each truck is weighed at the gate, and the GRN carries the heat number from the test certificate.
GRN 4471 from Sahyadri Castings
The QC bay
Three of 13 samples fail on hardness, so the lot stays in QC hold with an NCR for the vendor.
Heat H-221 held
The machine shop
CNC-07 is down until Thursday. VMC-02 takes the same fixture, so Emplotec plans the move.
WO-5530 to VMC-02, for Ravi to approve
Job work
Every challan with a job worker, how long they have held the material, and reminders drafted past 90 days.
₹4.2 L past 90 days
Dispatch
The e-invoice and e-way bill are ready before the truck leaves for Haldane.
Inside Haldane's 13 Nov promise
Job cost
Each job's real cost from the shop floor, without waiting for month-end.
VB-40 margin down three orders running
Does your week look like this?
These are the moments that send manufacturers looking for a new system. Each one is a gap between tools that don't share data.
Sales promises a date nobody checked against the floor, and the OEM chases you for it.
Excel and WhatsAppEvery order is checked against machines and material before the date goes out. When a machine stops, Emplotec replans and tells sales who to call.
MRP is a spreadsheet, and it breaks the day a rush order or a new schedule lands.
ExcelMRP runs from orders, OEM schedules and reorder levels. A what-if shows what a rush order does to the plan before you commit to it.
Material sits at job workers and nobody can reconcile it. ITC-04 is done by hand.
Registers and TallyEvery challan out and receipt back is matched, with process loss and ageing, and ITC-04 is prepared from the same records.
Nobody knows what a job really cost, so the next quote is a guess.
ExcelMaterial, machine, labour and overhead per work order, planned against actual, and quotes drafted from what similar parts really cost.
An OEM audit asks for heat traceability and someone spends two days in files.
Paper and foldersEvery heat and batch is traced from the gate to the customer, forward and back. PPAP packs and 8D reports live with the part.
The customer changes a drawing, and the floor makes 200 parts on the old revision.
Email and paper drawingsA drawing register with revisions and ECNs. Job cards, CNC programs and inspection plans carry their revision, and old stock and WIP are decided before the change goes live.
The contractor's bill is paid, and the auditor later finds his ESI challan never covered half the workers.
Biometric exports and filesContract workers' attendance comes from the same biometric devices. The contractor's PF and ESI challans are checked against the people deployed, and the bill is held until they match.
A second plant opens and the Tally, Excel and TranZact patchwork stops holding.
Three systemsEvery plant, company and branch on one system and one ledger, each with its own stores, numbering and GST registration.
One system from the RFQ to the job's real cost.
Orders, planning, the shop floor, stores, job work, quality, purchase and accounts run on one system, set up for your plant. Every product shares the same data from its first day.
- Promise dates checked against your machines
- Job work given and received, with ITC-04
- Job cost planned against actual
- Heat-number traceability, forward and back
- Gate entry, gate passes and weighbridge
- Consignment stock at the OEM's plant
- Rate contracts and approval matrix
- Vendor portal for POs and ASNs
- Three-way match before payment
- OEM schedules and cumulative tracking
- Quotes from past job costs
- Rejection debits and warranty claims
- WIP valuation from the shop floor
- GST, e-invoices and e-way bills on dispatch
- Keep Tally for accounts until you move
- Contract labour: attendance, wages and challans
- Operator certifications checked on the job card
- PF, ESI, Professional Tax and LWF
- Incoming, in-process, first-off and final
- PPAP packs and control plans
- Calibration blocks overdue gauges
- Breakdowns reported by scanning the machine
- Preventive plans by calendar or meter
- MTBF, MTTR and the machine history card
- Factory licence and consents with renewal owners
- Contractors' bills held until challans are in
- Notices and inspections with replies
- Warranty and AMC cover checked on intake
- Engineer's app works offline
- Signed report becomes the invoice
- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario
- Vendor
- Sahyadri Castings
- Heat
- H-221
- Received
- 200 castings
- Sample (AQL 1.0)
- 13
- Test certificate
- Matched to heat
- Gauge HB-02
- Calibrated to Mar 2027
Emplotec Hold all 200. The last two lots from this heat range also ran high. I've drafted NCR-0186 and a debit note for the rejects.
NCR historyVendor rating- Senthil logged BRK-318, spindle drive fault, by scanning the machine
- Emplotec took CNC-07 out of the schedule until Thu 14:00 and flagged WO-5530
- Murugan raised a spares request for the drive card
- PM-0412 monthly preventive plan completed, 14 of 14 checks
One order, from the OEM's schedule to cash.
A new schedule from Haldane Pumps, followed through every product it touches. Nobody re-enters anything, and every step is a record you can open.
- 01 · CRM & Sales
The OEM's schedule comes in
Haldane emails schedule rev 14. Emplotec reads the PDF into schedule lines, shows what changed from rev 13, and Meera accepts 620 valve bodies for week 47.
Schedule rev 14 · HP-77120 - 02 · Manufacturing
MRP and the schedule check it
MRP explodes the BOM against the new demand. The finite-capacity board finds the machine time, and the date Meera gives Haldane is one the floor can keep.
MRP-0461 · Plan week 47 - 03 · Procurement
Shortages become purchase orders
The 340 castings short become a PO to Kaveri at the contract rate. Ravi approves it on his phone, and Kaveri sees it on the vendor portal.
PO-3318 · Kaveri Castings - 04 · Inventory
Received at the gate, held in QC
The truck is logged at the gate and weighed. The GRN carries heat H-318 from the test certificate, and the castings wait in QC until they pass.
GRN 4490 · heat H-318 - 05 · Quality
Inspected, then released
Divya inspects 20 samples on her tablet against the inspection plan. Every result is in tolerance, so the stock is released to production and the heat stays traced.
INS-9921 · AQL 1.0 - 06 · Manufacturing
Machined, inspected and costed
Operators book job cards at the kiosk. Setup, run time and scrap post as they happen, so the work order's actual cost is known the moment it closes.
WO-5560 · job cards - 07 · Books
Dispatched, invoiced and paid
Dispatch raises the e-invoice and e-way bill together. The invoice posts to the ledger, and when Haldane pays, the receipt matches by itself and the job's margin is final.
INV-2026-1184
Ask your plant anything.
Emplotec reads across production, stores, quality, purchase and accounts at once. It answers with the records it used, and anything it would change waits for your approval.
Yes for 260 by 18 November and the other 140 by 25 November. Nothing else moves. I've drafted the quote reply for Meera with the split.
A draft at ₹2,160 a piece for 500, built from what VB-25 and FL-12 really cost, with the boring time raised for FL-12's overrun.
Most of the gap is rework from Sahyadri's out-of-tolerance castings, the rest is CNC-07 running slow before it failed. The rework is recoverable through a debit note.
ITC-04 is ready except for three challans waiting on receipts from two job workers. I've drafted reminders. Your accountant files it once they're in.
Can we take 400 more valve bodies for 18 November?
CapacityMRPCastings on orderPromise dates- Running a what-if on the live plan
- Checking machining capacity week by week
- Checking castings and lead times
- Testing every existing promise date
- Machining fits with Saturday's shift on VMC-02
- Castings cover 260 by 18 Nov; 140 more need Kaveri's lead time
- No existing order slips
Yes for 260 by 18 November and the other 140 by 25 November. Nothing else moves. I've drafted the quote reply for Meera with the split.
- Quantity by 18 Nov
Asked 400Offer 260 - Balance
None140 by 25 Nov - Saturday shift, VMC-02
OffOn, 14 and 21 Nov
Nothing changes until you approve.
Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works
Your plant's way of working, not ours.
Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.
JC-88412WO-5560 · operation 30, milling- Work centre
- VMC-02
- Operator
- Senthil
- Planned
- 6.5 h
- Good
- 620
- Scrap
- 2
- Shift
- A, 06:00
- Fixture numberFX-40-02
- Coolant concentration6.5%
- Shift head sign-off
- Block the job card if the operator isn't certified for VMC-02
- Tell the planner when scrap passes 1%
- Heat number carried from the GRNH-318
- PPAP status checked before dispatch
- Print Haldane's own bin label format
- Haldane parts: 100% bore check, not AQL
The core stays the same for every customer, so all of this carries through every upgrade.
Need software Emplotec doesn't have? We build it.
Emplotec is built by a software company. If your plant needs something outside the ERP, such as a customer portal of your own, a machine data link or a connection to an OEM's supplier system, our team builds it and connects it to Emplotec, under the same support.
- Your OEM's supplier portal, connected to your schedules
- A kiosk app built around one machine's routine
- A data link from your existing machine controllers
- Your old system's history, moved and kept searchable
Written for your kind of manufacturing.
Each kind runs differently. Each has its own page, with the work, documents and checks that are particular to it.
- Automotive componentsTier 1 and Tier 2 suppliers working to OEM schedules, PPAP and rejection debits.
- Delivery and cumulative schedules
- PPAP packs and control plans
- Rejection debits and 8D
- Engineering and fabricationMake-to-order shops where every job is costed and every drawing has a revision.
- Drawing register with revisions
- Job costing against the quote
- Quotes from similar past jobs
- Plastics and rubber mouldingMoulding shops where moulds, cavities and shot counts set capacity.
- Mould life and shot counts
- Regrind and scrap tracked
- Machine and mould scheduling
- Metal casting, forging and steelFoundries, forge shops and steel processors where every heat is traced.
- Heat numbers from melt to customer
- Test certificates checked by heat
- Yield and rejection by heat
- Electrical and electronicsAssemblers with serials, BOM revisions and component traceability.
- Serial numbers through to the customer
- BOM revisions and ECNs
- Alternate components in MRP
- Textiles and garmentsMills and garment units with job work at every process.
- Job work across processes
- Lots, shades and sizes
- Process loss by job worker
- PackagingConverters running short runs to customer specifications.
- Specifications per customer
- Board and reel stock by weight
- Short-run scheduling
- Furniture and woodworkMakers building to order and to stock, with cut lists and finishes.
- Variants by size and finish
- Cutting and assembly routings
- Projects for site installation
Built for the rules where you make.
Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.
India
- GST e-invoices and e-way bills raised at dispatch
- Job work and ITC-04, with job-worker reconciliation
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- TDS and TCS under the Income-tax Act 2025
- PF, ESI, Professional Tax and LWF on the Labour Codes
- MSME payment dates tracked on every vendor bill
- Depreciation under the Companies Act and Income Tax
- Exports under LUT, with the LUT register and realisation tracked
- Contract labour registers and returns under the OSH Code
- Factory licence and pollution consents in the compliance calendar
- Tally sync, if your accounts stay in Tally for now
UAE
- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
Saudi Arabia
- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
United Kingdom
- VAT with Making Tax Digital
- PAYE payroll with RTI
United States
- Sales tax, state by state
- Payroll
- 1099 forms
Live in 30 days, without stopping the plant.
We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, products and companies. The system is set up for your kind of manufacturing, then fitted to your plant's own workflow, so routings, job cards and documents read the way your people already work.
- We map your plant first: orders, routings, stores, job workers and how dates are promised today.
- Your masters, BOMs, open orders, stock and balances come across from Tally and Excel.
- We fit the screens, fields, approvals and documents to the way your plant works.
- Your planners, stores and supervisors train on your own data, then go live by plant.
Questions manufacturers ask
What is the best ERP for a manufacturing company?
One that checks promise dates against your machines, traces every heat or batch, handles job work both ways and gives you the real cost of each job, on the same ledger as your accounts. Emplotec does all of that in one system, with an AI agent across it, fitted to your plant's own process.
Is Emplotec suitable for a small manufacturer?
Yes. Start with Manufacturing, which includes Inventory, and keep Tally for accounts if you like. You license only the products you need, and every company and branch is included. Add Procurement, Sales, Quality and Books when you grow.
Can we keep Tally for our accounts?
Yes. Production, stores and job work run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.
Does Emplotec handle job work and ITC-04?
Yes, both ways. Job work given tracks material out, receipts back, process loss and ageing, and prepares ITC-04. Job work received covers customer job orders, customer-owned material, return challans and conversion charges.
Can it work with our OEM customers' delivery schedules?
Yes. Delivery and cumulative schedules sit in CRM & Sales, with customer part numbers, labels, returnable containers and consignment stock. Emplotec can read a schedule from a PDF or Excel into draft schedule lines for you to accept.
Does it cover payroll, contract labour and factory compliance?
Yes. HRMS runs biometric attendance, shifts, overtime and payroll for your own workers and contract labour, with PF, ESI, Professional Tax and LWF. Contractors upload their challans on the vendor portal, and their bills are held until the challans match the people deployed. The factory licence, pollution consents and returns sit in one compliance calendar.
Does it handle drawing revisions, engineering changes and tool life?
Yes. A drawing register with revisions and customer approval, ECNs with approvals and an effective work order, and job cards, CNC programs and inspection plans that carry their revision. Tool, die and fixture life is counted from job cards.
Can you customise it for the way our plant works?
Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for your kind of manufacturing; and extensions for your own workflow. The core is never forked, so your changes survive upgrades.
Does it work on our own servers?
Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.
Does it run after-sales service and the bank's CMA data?
Yes. If you sell machines or equipment, every installed unit carries its serial, warranty and AMC; calls are checked against the cover, dispatched to an engineer with the part, and the signed report becomes the invoice (Field Service). The year's budget by plant and product line, and the CMA data your bank asks for in its own template, come from the same orders, people and ledger (Planning).
What doesn't Emplotec cover for manufacturers?
Outside tools and hardware stay as they are: a constraint-based planning optimiser, PLM and CAD integration, and live machine monitoring from sensors. OEE comes from job cards and downtime logs. Plants that run on recipes have their own page, for food processing.
See Emplotec run your manufacturing business.
Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.
- A call within one working day, from the people who build it, not a sales team.
- Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
- Cloud or your own servers, the same build either way, with your own database.