Construction ERP software for contractorsSee the overrun while the concrete is still curing. Bill every cubic metre you pour.

Every site's budget, store, subcontractors, labour and equipment on one record with the client's RA bill and your accounts, so an overrun shows while there's still time to act. An agent across all of it drafts the client report, checks the subcontractor's bill and finds the leak.

  • Runs onProjects · Billing · Procurement · Inventory · Books · Expense · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
All sites6 sites · Tue 10 Nov · 08:45
1 site over budgetBlock C at Medvista is forecast ₹1.09 Cr over budget. Steel issued is 14.2 t past the 3% wastage the bar bending schedule allows.
Balance to execute₹125.2 Cr6 sites, ₹259.7 Cr contracted
Billed in October₹7.86 Cr+9% on September
Forecast margin, all sites10.2%−0.4 pts, Block C
Retention held₹6.73 Cr₹92.5 L due back from Aravind
SitesCost from orders, issues, payroll and equipment hours
ProjectClientContractDoneCPIForecast marginStatus

Emplotec ₹41 L of Block C's overrun is steel: 14.2 t issued free to Venkata Rebar Works beyond the allowed wastage. Recover ₹8.8 L on their bill, and add a second rebar gang to get the slab cycle back to 10 days.

Material reconciliationSRA-0412Schedule

In this example, Nallamala Infra runs six sites from Hyderabad on Emplotec. Block C at Medvista is running over on steel, RA bill 7 came back certified short, and a performance guarantee expires next week. Click through the sites, the tenders, the site diary, the drawings and RFIs, quality and safety, the bills and the guarantees. Example companies, people and figures.

From the signed contract to the paid bill.

Block C at Medvista, followed from Nallamala Infra's signed contract to Medvista's payment.

  1. The head office

    Medvista's contract is read into terms cited to clauses, and Meera confirms each one.

    5% retention, 12-month defects period

  2. The project office

    The BOQ's 386 items become Block C's budget by cost code, approved by Ravi.

    ₹57.92 Cr against ₹64.0 Cr

  3. The site store

    Steel is weighed at the gate and issued to Venkata against the bar bending schedule.

    60.2 t net at the weighbridge

  4. The site

    Karthik files the day's DPR offline: steel fixed, workers, crane hours and rain.

    214 workers on site

  5. Block C

    Steel is 14.2 t past the 3% wastage limit, so Emplotec plans the recovery.

    ₹8,80,400 from Venkata, for approval

  6. The client's PMC

    Medvista's PMC certifies RA-07 on the portal, and unmeasured work stays unbilled.

    ₹2.61 Cr certified of ₹2.84 Cr

  7. The accounts

    Medvista pays net of TDS and cess, and retention waits for the defects period.

    ₹13,07,000 retention tracked

Does your month on site look like this?

These are the moments contractors start looking for a construction ERP. Each one is a gap between the site, the bills and the accounts.

  • The overrun shows up at the last bill, when the margin has already gone.

    Excel and Tally

    Forecast to complete on every cost code, from commitments, issues, payroll, equipment hours and the DPRs, so Block C's ₹1.09 Cr shows in November, not at handover.

  • Site reports come in on WhatsApp, and nobody can add them up into progress, labour or material.

    WhatsApp and photos

    The DPR is filed on mobile, offline. Work done goes to the RA bill, material to the reconciliation and crane hours to the project's cost.

  • More steel and cement are used than the BOQ allows, and nobody notices until the store runs out.

    Store registers

    Material is reconciled against the BOQ's coefficients and the bar bending schedule, with wastage limits. Free-issue material past the limit is recovered on the subcontractor's bill.

  • RA bills are rebuilt in Excel every month, certified short, and retention and advances live in a notebook.

    Excel and a notebook

    RA bills come from the measurements, with up-to-date, previous and this-bill columns. Certified against claimed, retention tracked to the end of the defects period.

  • Subcontractor bills are paid without checking the measurements, and nobody knows if the labour contractor paid ESI.

    Measurement books

    Our engineer measures and certifies every subcontractor bill. Check the challan before you pay: the labour contractor's bill is held until PF and ESI match the people deployed.

  • A performance guarantee expires without anyone noticing, and the advance guarantee is never reduced.

    Bank letters in a file

    Every guarantee is held against the clause that requires it, with its expiry, the advance left and the facility limit, and shown as a contingent liability in the accounts.

  • Every tender is priced from last year's spreadsheet, and nobody knows why the last bid lost.

    Excel rate sheets

    Each BOQ is priced with rate analysis from what your own sites actually consumed and paid, and every lost bid is kept against L1, item by item.

  • RFIs, drawing revisions and NCRs live in email, and the site builds to a superseded drawing.

    Email and a drawing cupboard

    RFIs, submittals and the drawing register sit on the project, superseded copies are recalled from site, and an unanswered RFI is logged as the client's hindrance. Failed cubes raise an NCR that holds the next pour.

One construction ERP, from the contract to the final bill.

Tenders, projects, site stores, subcontracts, client billing, payroll, equipment and accounts run on one system, set up for contractors. Every product works on the same record, so a DPR on site reaches the RA bill, the stores and the ledger without anyone typing it twice.

Start here
  • Tenders priced with rate analysis from past jobs
  • DPR on mobile, offline, with photos
  • Primavera P6 and Microsoft Project files in and out
Emplotec Projects
  • Up-to-date, previous and this-bill, in the CPWD layout or the client's
  • Certified against claimed, the difference kept unbilled
  • Retention tracked to the end of the defects period
Emplotec Billing
Add next
  • Material indents from site, with a budget check
  • Comparative statement with landed cost
  • Subcontract work orders and their RA bills
Emplotec Procurement
  • Site stores with issues to subcontractors
  • Transfers between sites with e-way bills
  • Gate entry and weighbridge for steel and aggregates
Emplotec Inventory
  • Project P&L with revenue by percentage complete
  • Bank guarantees issued and received, with facility limits
  • Keep Tally for accounts until you move
Emplotec Books
When you need it
  • Face-recognition attendance at every site gate
  • Contract labour under the OSH Code
  • Geo-fenced mobile check-in for site staff
Emplotec HRMS
  • Equipment hours booked to the project
  • Preventive maintenance by hour meter
  • Breakdowns at site reported by scan
Emplotec Assets & Maintenance
  • Inspection and test plans with the PMC's approval
  • Cube register, NCRs and corrective action
  • Permits to work, toolbox talks and near misses
Emplotec Quality
  • Imprest per site and person
  • Charged to the project and WBS
  • Settled before the next top-up
Emplotec Expense
  • Every project's cash flow in one plan
  • Cost to complete from the budgets
  • CMA data for working capital limits
Emplotec Planning
Project cost reportP-2411 Block C · Medvista Hospitals · by cost code
Cost codeWBSExport
Cost codeBudgetCommittedActualForecastVariance
Concrete, RMC M30₹9.80 Cr₹1.10 Cr₹5.36 Cr₹9.98 Cr+₹18 L
Reinforcement₹13.60 Cr₹1.30 Cr₹7.84 Cr₹14.01 Cr+₹41 L
Formwork and crane₹6.40 Cr₹0.62 Cr₹3.85 Cr₹6.76 Cr+₹36 L
Masonry and finishes₹8.90 Cr₹2.40 Cr₹1.10 Cr₹8.90 Cr0
MEP₹12.20 Cr₹4.80 Cr₹2.73 Cr₹12.20 Cr0
Site overheads₹7.02 Cr₹0₹4.38 Cr₹7.16 Cr+₹14 L
Total₹57.92 Cr₹10.22 Cr₹25.26 Cr₹59.01 Cr+₹1.09 Cr

Emplotec Three cost codes carry the overrun, all tied to the slab cycle and steel wastage. Masonry and MEP are committed within budget.

CommitmentsDPRsEquipment hours
Explain

One contract, from the signed PDF to cash.

Medvista's Block C followed through every product it touches. The terms set the budget, the site's work sets the bill, and every step is a record you can open.

  1. 01 · Contracts

    The contract is read into its terms

    Medvista's signed contract is read into a draft record, each term cited to its clause: 5% retention, a 10% mobilisation advance against a guarantee, escalation, a 12-month defects period and LD. Meera confirms each term.

    Contract MH/BC/2025-14
  2. 02 · Projects

    The BOQ becomes the budget

    The BOQ's 386 items become Block C's budget by WBS and cost code: ₹57.92 Cr of cost against ₹64.0 Cr of contract, a 9.5% margin. Ravi approves budget rev 0, and the Work plan comes from the template.

    P-2411 · budget rev 0
  3. 03 · Procurement

    Site indents steel at the contract rate

    Karthik indents 120 t of Fe 550D from site. The budget check passes, Arun raises PO-6610 to Krishna TMT Traders at the rate contract, and Ravi approves it on his phone.

    PO-6610 · Krishna TMT Traders
  4. 04 · Inventory

    Received at the site store, issued to the subcontractor

    The truck is weighed at the gate and the GRN carries the mill's test certificate. Senthil issues the bars free to Venkata Rebar Works against the bar bending schedule, so every tonne is tracked to a slab.

    GRN-KDP-1184 · issue IS-2290
  5. 05 · Projects

    The site diary records the work

    Karthik files the day's DPR on his phone, offline: steel fixed against the BOQ, 214 workers by subcontractor, TC-2's hours and two hours of rain. Quantities go to the RA bill and the steel to the reconciliation.

    DPR-KDP-0312 · 9 Nov
  6. 06 · Billing

    RA bill 7, certified and invoiced

    Deepa builds RA-07 from October's measurements in the CPWD layout. Medvista's PMC certifies it on the portal at ₹2.61 Cr; the 29 t he hasn't measured stays unbilled, and the e-invoice goes out.

    RA-07 · IRN generated
  7. 07 · Books

    Paid net, retention tracked

    Medvista pays net of TDS and labour cess. The receipt matches the bill, ₹13,07,000 of retention waits for the defects period, and the advance left to recover falls to ₹3.78 Cr.

    Receipt RC-8821

Ask across every site.

Emplotec reads the contracts, sites, stores, bills, payroll and accounts at once. It answers with the records it used, and anything it would change or send waits for your approval.

  • Rebar loses ₹1,800 a tonne before wastage, because escalation hasn't been claimed since July. Claiming it for RA-04 to RA-07 recovers ₹11.6 L. I've drafted the claim for Deepa.

  • File an extension of time claim for 23 days now. The oldest hindrance is 24 days old, so it must go this week. With it granted, a 10-day slip costs no LD.

  • Service MC-04 at Medchal on 17 November and move it on the 18th with the formwork and steel on the same trip. That saves about ₹3.4 L of hire at the ETP in December.

  • A 12-page pack with a page per site, the two risks and their plans, and the cash forecast to March. It goes to the board once you've accepted it.

EmplotecAcross the business

What did we pay subcontractors on Block C against what we billed Medvista for the same work?

ReadRA bills to MedvistaSubcontractor billsBOQFree-issue steelEscalation clause
  1. Matching each BOQ line on both sides
  2. Adding free-issue material to the subcontractor's cost
  3. Finding lines that lose money
  4. Checking escalation claimed
  • Formwork: ₹640 billed and ₹263 paid a m²
  • Rebar: ₹78,500 billed a tonne; steel and fixing cost ₹80,300 before wastage
  • Steel escalation under clause 12.2 hasn't been claimed since RA-04

Rebar loses ₹1,800 a tonne before wastage, because escalation hasn't been claimed since July. Claiming it for RA-04 to RA-07 recovers ₹11.6 L. I've drafted the claim for Deepa.

Escalation · Block CWaiting for you
  • Steel escalation, RA-04 to RA-07Not claimed₹11.6 L claim drafted
  • Rebar line margin−₹1,800 a t+₹1,150 a t
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your site's way of working, not ours.

Emplotec fits the way your company runs its sites at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Daily progress reportDPR-KDP-0312Block C, Kondapur · Mon 9 Nov
Filed by
Karthik
Workers
214
Steel fixed
18.4 t
TC-2 crane
9.5 h
Hindrance
Rain, 2 h
Photos
12
Configure it
  • Shuttering area1,240 m²
  • Cube samples taken6
  • Safety officer sign-off
Set your rules
  • Hold the steel issue when the floor's wastage passes 3%
  • Tell the project manager when a hindrance runs past 4 hours
Your industry's extension
  • Work done becomes the RA bill's measurement, CPWD layout
  • Pour checklist before concreting
Yours alone
  • Print Medvista's PMC daily report, its own 14 fields
  • Medvista sites: no pour without the PMC's approval on record

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your sites need something outside the ERP, such as a labour camp app, a link to site cameras or your client's own project portal, our team builds it and connects it to Emplotec, under the same support.

  • A labour camp app for rooms, meals and gate passes
  • Site cameras or drone surveys linked to each day's DPR
  • Your client's project portal, connected for RA bill submission
  • Your old construction ERP's history, moved and kept searchable

Built for the rules where you build.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices on every RA bill, with reverse charge where it applies
  • E-way bills on material moved between sites
  • TDS on subcontractor bills and on receipts, under the Income-tax Act 2025
  • Labour cess on subcontractor bills, and the client's deductions reconciled
  • PF, ESI, Professional Tax and LWF on the Labour Codes, for staff and site workers
  • Contract labour under the OSH Code, with contractors' challans checked
  • MSME payment dates on every supplier bill
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without stopping a site.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which sites, products and companies. The system is set up for contracting and EPC, then fitted to your company's own workflow, so estimates, BOQs, DPRs, RA bills and subcontracts read the way your sites already work.

  1. We map your sites first: contracts, BOQs, subcontracts, stores and how RA bills are made today.
  2. Your open POs, site stock, subcontractor balances, retention, advances, guarantees and accounts come across from Tally and Excel.
  3. We fit the DPR's fields, the RA bill formats, the approvals and the cost codes to the way you work.
  4. Site engineers and stores staff train on their own site's data, then go live site by site.
What is the best construction ERP software?

One that puts the BOQ, the site's daily progress, site stores, subcontractor bills, the client's RA bills, payroll and equipment on the same ledger as your accounts, with a forecast to finish on every cost code. Emplotec does that in one system, with an AI agent across it, fitted to the way your company runs its sites.

Does Emplotec handle RA bills, retention and mobilisation advances?

Yes. RA bills come from measurements recorded against the BOQ, with up-to-date, previous and this-bill columns in the CPWD layout or your client's. The client certifies on the portal, and certified quantities are compared with claimed ones. Retention, mobilisation and material advance recovery and escalation apply to every bill, and the client's deductions on receipt are reconciled.

Does it handle subcontractor bills and free-issue material?

Yes. A subcontract is a service order with BOQ lines and rates. Our engineer measures and certifies the work, and each subcontractor bill deducts retention, advance recovery, free-issue material past the wastage limit, TDS and labour cess. The project shows each subcontractor's bills beside what you bill the client for the same lines.

Can site engineers use it without signal?

Yes. The DPR works offline on the mobile app: work done against the BOQ, manpower by trade and subcontractor, equipment hours, material used, hindrances, weather and photos. It syncs when the phone is back online.

Does it work with Primavera P6 and Microsoft Project?

Yes. Primavera P6 XER and XML files and Microsoft Project XML files come in and go out, with baselines. The schedule then carries cost, the site's progress and the bills, with earned value and S-curves.

Can we keep Tally for our accounts?

Yes. Sites, stores, subcontractors and billing run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for the way we run our sites?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for contractors; and extensions for your own workflow, such as a client's own report format. The core is never forked, so your changes survive upgrades.

Does it work for contractors in the UAE and Saudi Arabia, and on our own servers?

Yes. The UAE version handles VAT, e-invoicing, corporate tax, WPS payroll and free-zone entities; the Saudi version handles VAT, ZATCA e-invoicing (FATOORA) and GOSI payroll. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.

Does it handle site imprest and the company's annual plan?

Yes. Engineers and storekeepers claim site cash spends on the phone, offline, against the project and WBS, and the next top-up is released once the last one is settled (Expense). The company's plan rolls up every project's revenue, cost to complete and cash flow with head office cost, and produces CMA data for the bank (Planning). Daily-wage crews come through labour contractors, so they stay in HRMS as contract labour.

What doesn't Emplotec cover for contractors?

Resource levelling as Primavera does it, though P6 files come in and go out; BIM models, which stay in your design tools; and joint-venture accounting across partners. Tendering is covered: each tender's BOQ is priced with rate analysis from your own past rates, and the won BOQ becomes the project's budget.

Does it cover quality, safety, drawings and RFIs on site?

Yes. Inspection requests, pour cards, the cube register and NCRs with corrective action run on mobile, and a failed cube holds the pours that depend on it. Permits to work, toolbox talks, safety inspections, near misses and incidents are recorded by site. The drawing register keeps every revision with superseded copies recalled, and RFIs, submittals and transmittals are tracked to the client's reply, with an unanswered RFI logged as a hindrance.

How does it show revenue, work in progress and cash flow on each contract?

Revenue is recognised by percentage of completion under Ind AS 115 or IFRS 15, from cost incurred against the forecast cost at completion. Work done but not yet certified shows as unbilled revenue, billing ahead of work as billing in excess, and retention held and advances left to recover sit beside them. Each project has its own cash flow from the billing plan, commitments and payment terms.

Does it track insurance, plant hire and diesel?

Yes. Contractor's all risks, employees' compensation and third-party policies are held against each contract with their expiry. Owned and hired machines book their hours to the project, hire bills are checked against signed log sheets, and diesel issued from the site store is measured in litres an hour per machine.

See Emplotec run your construction and epc business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp