ERP for the packaging industryShort runs on time, reels by the kilo. The real cost of every box.

Every customer's spec, every reel by grade, deckle and weight, forty short runs a week on one corrugator, and the trim and margin of each job: one system for box makers, flexible packaging and label converters, with an agent that works across all of it.

  • Runs onManufacturing · Inventory · Quality · CRM & Sales · Procurement · Books · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Plant overviewChangodar · week 46 · Wed 11 Nov, 10:40
1 order at riskJOB-2431 for Navrang Ceramics, 24,000 tile boxes due Fri 13 Nov. Liner reels of 180 GSM 28 BF at Changodar cover 16,200 boxes.
On-time delivery91.6%+1.2 pts on last month
Trim waste, CORR-14.8%Norm 4.0%
Reel stock186t₹70.7 L in 2 godowns
Jobs this week4231 repeat orders
Load by machineThis week, finite capacity
  • CORR-1Corrugation plant, up to 7-ply92%
  • FPS-1Printer-slotter, 2 colour88%
  • FPS-2Printer-slotter, 4 colour64%
  • RDC-1Rotary die-cutter71%
  • STCH-1Stitching84%
  • FG-1Folder-gluer58%
Due this week5 of 42
JobCustomerBoxesDueStatus

Emplotec 4 reels of 180 GSM 28 BF, 3.6 t in 64-inch deckle, are at the Sanand godown. Moved tonight, they cover all 24,000 boxes and JOB-2431 runs on CORR-1 from Thursday 06:00.

Reel stockSPC-NAV-0602 rev 3JOB-2431

In this example, Sabarmati Packaging runs its Changodar plant on Emplotec. Navrang Ceramics' tile boxes are short of liner reels, and Emplotec has found the reels at the Sanand godown. Click through the plan, the specs, artwork and plates, reel stock, trim and job cost. Example companies, people and figures.

From the spec to the cost per box.

Emplotec follows Navrang's tile boxes from the spec through the reel godowns and the corrugator, and people approve every plan it drafts.

  1. Specs and orders

    Navrang's PO is read against SPC-NAV-0602 rev 3, so no box ships on an old spec.

    24,000 tile boxes, due 13 Nov

  2. The reel godowns

    Changodar's liner covers 16,200 boxes. Sanand has 4 reels, so Emplotec plans the transfer.

    TRF-0388, waiting for Anand

  3. The corrugator

    Reels are issued to the job by number and weight, and trim is booked per run.

    Trim 4.8% against 4.0% norm

  4. The board lab

    Bursting strength, GSM and moisture are tested before the board goes to print.

    INS-5120: all results in limit

  5. Print and stitch

    Sheets, make-ready and rejects are booked at the kiosk on each machine.

    Printed and stitched by Fri 16:00

  6. Dispatch

    The e-invoice and e-way bill are raised together as the bundles are loaded.

    To Morbi, inside Navrang's date

  7. Job cost

    Kraft is up ₹3 a kg, so revised price lists are drafted for Meera.

    Gokul: ₹1.10 more a carton

Does your week look like this?

These are the moments that send box makers and converters looking for a new system. Each one is a spec, a reel or a job that lives in a different place.

  • A repeat order goes out to last year's spec, with the old print, because the new revision was in someone's email.

    Excel and WhatsApp

    Every customer's spec is one record with its revisions: board on each layer, ply, flute, size, print, bundle and pallet. Orders and jobs always pick the current revision.

  • A job is on the plan for Monday, but the customer hasn't approved the new artwork, and the plates are still at the plate maker.

    Email threads

    Each artwork revision goes to the customer as a proof and comes back approved on the portal or by signed proof. A job can't start on unapproved artwork, and every plate and die carries its impressions against its life.

  • The corrugator stops because the liner you thought you had is in the other godown, or in the wrong deckle.

    Tally and a stock register

    Reels by number, grade, deckle and weight in every godown. Each job's paper is checked against them before it's planned.

  • Forty short runs a week, planned on a whiteboard, and a big customer's rush order breaks it every Thursday.

    Whiteboard

    A finite-capacity plan for the corrugator, printers, die-cutter and stitching. A rush order is tried as a what-if first, so you see what moves before you say yes.

  • Nobody knows what trim and make-ready waste cost this month, or on which job.

    Guesswork

    Trim, make-ready and rejections are booked on job cards, so waste shows by job, machine and customer, in tonnes and rupees.

  • Kraft prices move every month and the quotes don't, so some customers are below cost and nobody knows which.

    Box-costing sheet

    Every job's actual cost against its price, and the customers who fall below cost when paper rates change.

  • A pharma buyer's auditor asks for bursting strength results by lot, and someone spends a day in files.

    Paper test reports

    Board and box tests are recorded on mobile against the job and the reels it used, ready to send by lot.

Packaging ERP: one system from the spec to the box's real cost.

Specs, planning, reels, the corrugator and printers, quality, dispatch and accounts run on one system, set up for converters. Every product shares the same specs, reels and jobs from its first day.

Start here
  • Short runs planned against corrugator and printer time
  • Artwork approvals, plates and dies tracked for life
  • Job cost against the price, per box
Emplotec Manufacturing
  • Reels in kilos, boxes in pieces, with conversions
  • Weighbridge tickets linked to the GRN
  • Reels older than 90 days flagged
Emplotec Inventory
Add next
  • Quotes from a spec's real job costs
  • Price lists per customer, revised in one go
  • Credit holds before dispatch
Emplotec CRM & Sales
  • Rate contracts per grade and mill
  • MSME payment dates on every bill
  • Rejected reels debited to the mill
Emplotec Procurement
  • E-invoice and e-way bill with the dispatch
  • Reel stock valued in the books
  • Keep Tally for accounts until you move
Emplotec Books
When you need it
  • GSM, BF and moisture on every reel lot
  • Bursting strength by job and lot
  • Rejected reels into returns and the mill's rating
Emplotec Quality
  • Budget against actuals every month
  • CMA data in your bank's template
  • Raw material price as a scenario
Emplotec Planning
Job card · JOB-2431CORR-1 · Navrang Ceramics · SPC-NAV-0602 rev 3
Book output
Corrugation12,240sheets, 2 ups
Printing and slotting24,310FPS-1
Stitching24,120STCH-1
Dispatch24,00013 Nov
Trim3.4%64-inch deckle
Rejected1900.8%
Cost per box₹33.85Quoted ₹34.10
Reels used11Traced to the job

One repeat order, from the customer's PO to cash.

Navrang Ceramics' order for 24,000 tile boxes, followed through every product it touches. Nobody re-enters anything, and every step is a record you can open.

  1. 01 · CRM & Sales

    The PO comes in

    Rahul Bose emails PO NC/PO/7731. Emplotec reads it into a sales order against spec SPC-NAV-0602 rev 3 at Navrang's price, and Meera confirms it.

    SO-1842 · PO NC/PO/7731
  2. 02 · Manufacturing

    Planned on the corrugator

    The spec explodes into paper by grade and deckle. The plan finds corrugator, printer and stitching time, and flags that the liner at Changodar covers only 16,200 boxes.

    JOB-2431 · CORR-1, Thu 06:00
  3. 03 · Inventory

    Reels moved and issued

    Anand approves the transfer. The truck is weighed out at Sanand and in at Changodar, and the 4 reels are issued to JOB-2431 by reel number and weight.

    TRF-0388 · 4 reels
  4. 04 · Quality

    Board tested before print

    Divya tests the corrugated board on her tablet: bursting strength, GSM and moisture. Every result is in limit, so the board is released to the printer-slotter.

    INS-5120 · board test
  5. 05 · Manufacturing

    Printed, stitched and costed

    Senthil and Murugan book sheets, trim and rejections at the kiosk on each machine. The job's actual cost is known the moment the last bundle is counted.

    JOB-2431 · job cards
  6. 06 · Books

    Dispatched, invoiced and paid

    Arun raises the e-invoice and the e-way bill together at dispatch. The invoice posts to the ledger, and when Navrang pays, the receipt matches by itself.

    INV-2026-2214

Ask your plant anything.

Emplotec reads across specs, reels, the plan, quality and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Yes for 28,000 by 18 November and the other 12,000 by 20 November, once Monday's reels arrive. Nothing else moves. I've drafted the reply for Meera with the split.

  • A draft at ₹191.50 a box for 800, costed from what SPC-SHP-0208 really took, with the stitching time raised and today's kraft rates.

  • October's waste cost ₹6.1 L net of the scrap sold. Half is trim from wrong deckles, and Gokul's short 4-colour runs carry the most make-ready. Batching Gokul's runs weekly would save about a third of it.

  • The pack is ready: 14 lots with bursting strength, GSM and moisture, traced to their reels. One incoming test is missing a moisture reading; Divya can add the lab note before it goes.

EmplotecAcross the business

Can we take 40,000 shippers for Zenlife by 20 November?

ReadCorrugator and print planSPC-ZEN-0031 rev 2Reel stockOpen POs
  1. Running a what-if on the live plan
  2. Checking corrugator and printer time week by week
  3. Checking paper by grade and deckle
  4. Testing every existing promise date
  • Corrugator time fits with Sunday's shift on 15 November
  • Paper covers 28,000; 12,000 need the Saurashtra Kraft reels due Monday 16 Nov
  • No existing order slips

Yes for 28,000 by 18 November and the other 12,000 by 20 November, once Monday's reels arrive. Nothing else moves. I've drafted the reply for Meera with the split.

Reply to Zenlife PharmaWaiting for you
  • 40,000 shippersAsked by 20 Nov28,000 by 18 Nov, 12,000 by 20 Nov
  • Sunday shift, CORR-1OffOn, 15 Nov
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your plant's way of working, not ours.

Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.

Box specificationSPC-NAV-0602Navrang Ceramics · rev 3
Box style
RSC, FEFCO 0201
Inner size
612 × 612 × 52 mm
Ply and flute
5-ply, B and C
Top liner
180 GSM 28 BF
Print
1 colour, plate P-602
Bundle
20 boxes
Configure it
  • Pallet pattern600 a pallet, 5 × 6
  • Strapping2 straps, PP
  • Artwork approval
Set your rules
  • Block the job if this revision's artwork isn't approved
  • Tell the planner when a job's trim passes 4%
Your industry's extension
  • Board weight per box from the paper on each layer0.64 kg
  • Reel numbers carried from the GRN to the job card
Yours alone
  • Print Navrang's own pallet label with the tile batch
  • Navrang boxes: compression test on every lot, not sampled

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your plant needs something outside the ERP, such as a link to your corrugator's controller, an app for customers to reorder by spec or a connection to a big buyer's supplier portal, our team builds it and connects it to Emplotec, under the same support.

  • A reorder app for your customers, by spec and revision
  • Metres and breaks read from your corrugator's controller
  • Your FMCG buyers' supplier portals, connected to your orders
  • Specs and history moved from your old packaging software

Built for the rules where you make.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices and e-way bills raised at dispatch
  • GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
  • Job work and ITC-04, for printing, lamination or dies sent out
  • TDS and TCS under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF on the Labour Codes
  • MSME payment dates tracked on every mill's bill
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, without stopping the corrugator.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which plants, godowns and companies. The system is set up for packaging conversion, then fitted to your plant's own workflow, so specs, reels, deckles and job cards read the way your team already works.

  1. We map your plant first: machines, deckles, how jobs are planned and how waste is counted today.
  2. Your customers' specs, price lists, open orders, reel stock and balances come across from Tally and Excel.
  3. We fit the specs, job cards, test sheets and documents to the way your plant works.
  4. Your planner, stores, shift heads and quality team train on your own jobs, then go live.
What is the best ERP for the packaging industry?

One that holds every customer's spec with its revisions, tracks reels by grade, deckle and weight, plans short runs against your corrugator and printers, and gives you each job's trim and real cost, on the same ledger as your accounts. Emplotec does all of that in one system, with an AI agent across it, fitted to your plant.

Is Emplotec suitable for a corrugated box maker?

Yes. Specs carry board grade on each layer, ply, flute, size, print, bundle and pallet. Reels are stocked by number and weight, the corrugator, printer-slotters, die-cutter and stitching are planned on finite capacity, and trim and rejections are booked on job cards.

Does it work for flexible packaging and label converters?

Yes. Film, foil and label stock are rolls by weight and metres, with units converted. Extrusion, printing, lamination, slitting and pouching are routings, with ink, solvent and adhesive issued to each job by weight. Gravure cylinders, plates and dies are tracked for life, and their charges are billed to the customer as agreed. Lamination or printing sent out is job work, with ITC-04.

Does it plan deckle and trim for us?

It checks each job's paper against reels by grade and deckle, books trim from job cards and tells the planner when a job is on the wrong deckle. It isn't a cutting or combination optimiser; if you use one, it keeps doing that job beside Emplotec.

Does it handle customer artwork approvals?

Yes. Each artwork revision is tied to the spec revision, sent to the customer as a proof and approved on the customer portal or by a signed proof. Jobs pick only approved artwork, and the plates and dies for it are tracked from order to retirement. The artwork itself is drawn in your prepress software.

Does it run payroll for our shifts and contract workers?

Yes, with Emplotec HRMS. Biometric attendance, shifts, overtime and contract labour flow into payroll with PF, ESI, Professional Tax and LWF, and post to your accounts on the same ledger.

Can we keep Tally for our accounts?

Yes. Specs, reels, planning and job cost run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for the way our plant works?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for converters; and extensions for your own workflow, such as one customer's pallet label. The core is never forked, so your changes survive upgrades.

Does it work on our own servers?

Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database. The mobile app works offline for the floor and the godown.

What doesn't Emplotec cover for packaging converters?

Prepress, artwork and structural design software, deckle and cutting optimisation, ink and adhesive formulas, and live machine monitoring from sensors. Waste and OEE come from job cards and downtime logs. Those stay in their own tools and machines.

See Emplotec run your packaging business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp