ERP for engineering and fabrication companiesEvery job costed against its quote. Every revision on the shop floor.

For shops that build structures, process equipment, skids and sheet metal to the client's drawing: revisions and ECNs, quotes from the jobs you've already made, welders and the QAP, third-party inspection, and milestone or tonnage billing with retention, on one system with your stores and accounts.

  • Runs onManufacturing · Projects · Billing · Procurement · Quality · Inventory · CRM & Sales · Books · Field Service · Planning
  • Fitted to youYour fields, rules, documents and screens
  • Going liveData moved in 48 hours, live in 30 days

This is the app. Click any page on the left, and ask Emplotec on each one.

EmplotecAK
Jobs overviewPor GIDC, Vadodara · Friday 6 Nov · 09:05
ECN-118Narmada sent drawing SRS-2-GA rev C last night: shell from 8 to 10 mm, nozzle N4 moved. J-2614's margin falls from 18.2% to 11.6% unless the change is billed. 3 shell plates are already cut on rev B.
Order book₹14.6 Cr11 jobs in the shop
Margin forecast, open jobs13.9%Quoted 16.4%
Unbilled work₹34.8 L2 jobs
Retention held₹38.2 L₹4.03 L due back
Open jobs5 of 11
JobClientScopeValueDoneMarginStatus

Emplotec ECN-118 adds 1.1 t of 10 mm plate, re-rolling and rework on 3 cut plates: ₹12.1 L. A change order of ₹14.6 L keeps J-2614 at 18.1%. I've held the 3 plates and drafted CO-07 for Rahul Bose.

ECN-118SRS-2-GA rev CQT-0742

In this example, Mahi Engineering Works runs its Vadodara shop on Emplotec. Narmada's ECN-118 has just changed a skid mid-job, and Emplotec has priced the change before anyone argues about it. Click through drawings, the bays, QA/QC and TPI, quotes, job cost and billing. Example companies, people and figures.

From the estimate to the job's real margin.

Emplotec follows Narmada's skid from the estimate through the drawing office, the bays and the hydrotest, and people approve every plan it drafts.

  1. Quoting

    Narmada's SRS-2 is quoted from J-2541, last year's skid, with its real hours and plate.

    ₹1.84 Cr at 18.2% margin

  2. The drawing office

    ECN-118 costs ₹12.1 L, so Emplotec plans the plate hold and drafts CO-07.

    CO-07, ₹14.6 L, for Rahul Bose

  3. The plate yard

    Each plate is weighed in, and its MTC is checked by heat before release.

    Heat H-77412 on PO-5530

  4. The fabrication bays

    Every weld is booked to a qualified welder, and every piece carries its plate's heat.

    Senthil's qualification lapses 18 Nov

  5. The hydrotest bay

    The TPI call letter and dossier index are drafted before Sentinel's inspector arrives.

    19 Nov, 54-page dossier

  6. Dispatch

    Dispatch after TPI is a milestone, so the bill is drafted as the skid leaves.

    INV-26-0611, CO-07 on it

  7. Job cost

    Every plate, hour and bill posts to the job, so margin is known as costs land.

    J-2608: ₹4,704 a tonne over

Does your job look like this?

These are the moments fabricators and engineering companies start looking for a new system. Every one is money a job made on paper and lost in the shop.

  • The client sends a new revision mid-job, and the shop has already cut plates on the old one.

    AutoCAD folders and printouts

    A drawing register with revisions, ECNs and approvals. Job cards and cut lists carry their revision, so the old one is recalled the moment the new one is approved.

  • The job is dispatched, and nobody knows if it made money until the CA closes the year.

    Tally and Excel job sheets

    Every plate, hour, consumable and job worker's bill posts to the job's cost codes as it happens, against the quote's budget, with a forecast to finish.

  • Every quote starts from a blank sheet because nobody can find what the last vessel really cost.

    Excel and memory

    Quotes from similar past jobs and their real costs, overruns included, so the next price carries what the last one taught you.

  • The TPI inspector is due on Thursday, and the dossier is built over three late nights.

    Files and email

    MTCs by heat, the weld map, NDT reports and the hydrotest live with the job. Emplotec assembles the dossier index and shows what is still open.

  • A milestone is reached or 18 t are dispatched, and the bill goes out two weeks after. Retention is never chased.

    Tally and reminders

    Billing plans by milestone or tonnage, with retention and advances. Dispatches and milestones become unbilled lines the day they happen, and retention release dates are tracked.

  • A welder's qualification has lapsed, and he has just welded a pressure joint.

    A register in the QA office

    Welder qualifications with continuity and expiry. The job card checks the welder before the weld starts.

  • Site calls for column C-12, and nobody can say whether it was painted, dispatched or is still in Bay 1.

    A marking register

    Every mark number carries its drawing revision, weight and stage, from cutting to paint. Packing lists and dispatches go by mark number, so the site knows which truck it is on.

  • The advance bank guarantee lapses mid-job, and a late delivery's LD is found only in the client's final payment.

    Bank letters and the contract file

    Bank guarantees given against each job sit on the job with their expiry and renewal reminders. LD is computed from the contract's terms against the promised dates, so the risk is seen while the job can still recover.

Fabrication ERP, from the drawing to the retention.

Estimates, jobs, drawings, the shop, stores, quality, billing and accounts run on one system, set up for make-to-order work. Every product shares the same jobs, drawings and ledger.

Start here
  • Revisions and ECNs on every job card
  • Quotes from similar past jobs
  • Job cost planned against actual
Emplotec Manufacturing
  • Every plate and remnant traced by heat
  • Free-issue material from clients kept apart
  • Weighbridge slips on every dispatch
Emplotec Inventory
Add next
  • Budget, committed, actual and forecast
  • Change orders approved before they count
  • Milestones that release billing
Emplotec Projects
  • Costing sheet from material, process and overhead
  • Quotes that go quiet are flagged
  • Orders carry their terms into the job
Emplotec CRM & Sales
  • Comparative statements with landed cost
  • Orders tagged to the job and cost code
  • MTC by heat required before payment
Emplotec Procurement
  • Milestones and tonnage billed when reached
  • Retention and advance recovery on every bill
  • Change orders billed, never forgotten
Emplotec Billing
  • Bank guarantees with expiry reminders
  • Retention and advances in the job's ledger
  • Keep Tally for accounts until you move
Emplotec Books
When you need it
  • MTCs checked by heat at the gate
  • Welder qualifications checked on the job card
  • TPI hold points before the next step
Emplotec Quality
  • Every supplied unit by tag number
  • Warranty and AMC cover on intake
  • Signed report becomes the invoice
Emplotec Field Service
  • Budget against actuals every month
  • CMA data in your bank's template
  • Raw material price as a scenario
Emplotec Planning
Cut list CL-2614-07J-2614 · SRS-2-SH-01 rev C · Bay 2
Issue to bay
PiecePlateSize, mmHeatStatus
SH-1SS316L 10 mm2,500 × 6,000H-77412To cut
SH-2SS316L 10 mm2,500 × 6,000H-77412To cut
SH-3SS316L 10 mm2,500 × 3,420H-77418To cut
SH-1 rev BSS316L 8 mm2,500 × 6,000H-76990Remnant

Emplotec Each piece carries its plate's heat number, so the weld map and the dossier trace every shell course to its MTC.

MTCsWeld map

One job, from the client's drawing to the retention.

Narmada's SRS-2 skid, followed through every product it touches. The quote becomes the budget, the drawing becomes the cut list, and every milestone becomes a bill.

  1. 01 · CRM & Sales

    Quoted from a job you've already made

    Narmada sends the GA drawing for SRS-2. Meera builds the costing sheet from J-2541, the SRS-1 skid made last year, with its real hours and plate. The quote goes out at ₹1.84 Cr.

    QT-0742 · from J-2541
  2. 02 · Projects

    The order becomes a job

    Narmada's PO becomes J-2614. The quote's heads become the budget by cost code, and the payment terms become a billing plan with five milestones.

    J-2614 · BP-2614
  3. 03 · Manufacturing

    The drawing changes, and so does the job

    ECN-118 brings rev C. The BOM gains 1.1 t of plate, the cut list is reissued, and the 3 plates cut on rev B are held. The change is priced before it is built.

    ECN-118 · SRS-2-GA rev C
  4. 04 · Procurement

    Plate bought with its certificate

    The extra plate goes to Sayaji Steel Traders on the comparative statement. The truck is weighed at the gate, and Divya checks the MTC against heat H-77412 before the plate is released.

    PO-5530 · GRN 3318
  5. 05 · Quality

    Welded, tested and witnessed

    Each weld is booked against a qualified welder and its WPS. RT and DPT results go on the weld map, and Sentinel's inspector witnesses the hydrotest at the TPI hold point.

    QAP-2614 · TPI-0412
  6. 06 · Billing

    Dispatched and billed the same day

    Dispatch after TPI is a milestone, so the bill is drafted as the truck leaves, with CO-07 on it. Priya approves the billing run; the e-invoice and e-way bill go with the skid.

    INV-26-0611
  7. 07 · Projects

    The job closes with its real margin

    Every plate, hour and bill posted to J-2614 as it happened, so its margin is known the day the last cost lands, against the quote it started from.

    J-2614 · closed

Ask your shop what each job is really making.

Emplotec reads across jobs, drawings, the bays, quality, stores and accounts at once. It answers with the records it used, and anything it would change waits for your approval.

  • Yes, for completion by early April rather than mid-March. Price it on PR-3's real hours, and allow 5% plate scrap, not 4%. I've drafted the schedule note for Meera's quote.

  • Senthil must requalify before 18 November, and two contract welders need continuity proof before they weld again. I've drafted the booking with Sentinel for 17 November and drafted a note to the contractor.

  • Plate scrap and unbilled client changes explain most of it. Every ECN from a client now opens a change order draft, and quotes can carry 5% scrap until nesting improves. I've drafted both for your review.

  • Remnants cover 3.4 t of J-2620's 5.2 t, worth ₹9.8 L. Only the 1.8 t of 12 mm shell plate needs buying. I've drafted the reservations and a smaller purchase request.

EmplotecAcross the business

Can we take Sabarmati's 240 t pipe rack PR-4 for February without moving other jobs?

ReadShop scheduleBay 1 capacityJ-2608 hours per tonnePlate on orderOpen jobs' promise dates
  1. Estimating hours from J-2608's real hours per tonne
  2. Running a what-if on Bay 1 and blasting
  3. Checking plate lead times
  4. Testing every promise date
  • Bay 1 is free from 2 February once PR-3 is dispatched
  • 240 t at PR-3's real 36 h a tonne needs 9 weeks, not 7
  • No other job moves if blasting adds a second shift in March

Yes, for completion by early April rather than mid-March. Price it on PR-3's real hours, and allow 5% plate scrap, not 4%. I've drafted the schedule note for Meera's quote.

PR-4 · capacity noteWaiting for you
  • Bay 1Free from 2 FebPR-4, 9 weeks
  • Blasting, March1 shift2 shifts
  • Quote basis36 h a tonneIn RFQ-0388
EditReject

Nothing changes until you approve.

Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works

Your shop's way of building, not ours.

Emplotec fits your QAP, your clients' demands and your shop at four levels. The core is never forked, so every change carries through upgrades.

Welding job cardJC-4436J-2614 · joint W-14, shell long seam
Drawing
SRS-2-SH-01 rev C
Welder
Karthik, WQ-22
WPS
WPS-SS-07
Process
GTAW root, SMAW fill
Planned
9.5 h
Bay
Bay 2
Configure it
  • Interpass temperature150 °C max
  • Filler lotER316L, lot 2209
  • Fit-up photos
Set your rules
  • Block the job card if the welder isn't qualified for the process
  • Tell Divya when a joint is repaired twice
Your industry's extension
  • Plate heat number from the cut listH-77412
  • Raise the NDT request from the joint
Yours alone
  • Print Narmada's own weld map format into the dossier
  • Narmada jobs: TPI hold point before any nozzle weld is closed

The core stays the same for every customer, so all of this carries through every upgrade.

Need software Emplotec doesn't have? We build it.

Emplotec is built by a software company. If your shop needs something outside the ERP, such as your nesting software's cut lists flowing in, a portal where clients approve drawings and see progress, or a link to your crane scales, our team builds it and connects it to Emplotec, under the same support.

  • Cut lists and remnants from your nesting software
  • A client portal for drawing approvals and progress photos
  • A tablet app for the TPI inspector's sign-off in the bay
  • Your old job files and dossiers moved and kept searchable

Built for the rules where you build.

Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.

India

  • GST e-invoices and e-way bills on every dispatch and milestone bill
  • Job work and ITC-04 for galvanising, machining and blasting
  • GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
  • TDS and TCS under the Income-tax Act 2025
  • PF, ESI, Professional Tax and LWF for the shop and contract welders
  • MSME payment dates tracked on every vendor bill
  • Contract labour registers and returns under the OSH Code
  • Tally sync, if your accounts stay in Tally for now

Live in 30 days, with every open job carried across.

We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which shops, products and companies. The system is set up for make-to-order fabrication, then fitted to your shop's own workflow, so estimates, jobs, drawings, QAPs and bills read the way your team already works.

  1. We map how a job runs in your shop first: enquiry, drawings, QAP, bays, TPI and billing terms.
  2. Open jobs come across with their budgets, cost to date, drawings and billing plans, from Tally and Excel.
  3. Plate stock and remnants are loaded by grade, thickness and heat, and welders with their qualifications.
  4. Estimators, planners, QA/QC and stores train on your own jobs, then go live job by job.
What is the best ERP for a fabrication company?

One that costs every job against its quote, keeps drawing revisions and ECNs on the shop floor, traces plate by heat into the dossier, and bills milestones, tonnage and retention from the same job. Emplotec does all of that on one system with your stores and accounts, with an AI agent across it, fitted to your shop.

Is Emplotec a metal fabrication ERP or an engineering ERP?

Both. Structural fabricators bill by tonnage and process equipment makers bill by milestone; both need revisions, job cost, welders, inspections and retention. Emplotec runs either way, and many shops do both.

Can it cost each job against the quote?

Yes. The quote's heads become the job's budget by cost code. Plate, hours, consumables, job workers and bought-out items post as they happen, with a forecast to finish, so you see the margin while there's still time to act.

Does it handle drawings, revisions and ECNs?

Yes. A drawing register with revision control and client approval status, ECNs with approvals, BOMs imported from CAD exports, and job cards and cut lists that carry their revision.

Can it bill by milestones and keep retention?

Yes. Billing plans by milestone, tonnage or measured quantity, with advances, retention, change orders and RA bills, drafted from the signed contract and approved by a person before any invoice goes.

Does it follow a job to erection at site?

Yes. Every mark number is dispatched with its packing list and weighbridge slip, and erection progress at site is booked on the daily progress report on mobile, by mark and by tonnage, so billing by erected tonnage and the job's cost follow the same records.

Can it handle nesting yield, consumables and painting?

Yes. Cut lists from your nesting software carry their yield and remnants back to stock by heat. Electrodes and wire are issued by job and checked against the WPS, and blasting and paint DFT readings are recorded by mark number. The nesting itself stays in your nesting software.

Can we keep Tally for our accounts?

Yes. Jobs, the shop, stores and quality run on Emplotec, and your accounts sync to Tally until you choose to move to Emplotec Books.

Can you customise it for our QAP and our clients' formats?

Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; the fabrication extension; and extensions for your own workflow, such as one client's weld map or hold points. The core is never forked, so your changes survive upgrades.

Does it run in the cloud or on our own servers?

Either. Emplotec runs in the cloud or on your own servers, the same build both ways, and each customer has its own database.

Does it handle warranty and AMC service on the equipment we supply?

Yes. Every supplied unit is on record by tag number with its warranty and AMC. Calls are checked against cover and dispatched to an engineer with the spares, and the report is signed by the client's engineer on the phone (Field Service). The year's budget and the CMA data for your bank come from the order book, bids and ledger (Planning).

What doesn't Emplotec cover for fabricators?

Design software stays as it is: CAD and PLM integration, nesting, design calculations to pressure vessel codes, and BIM. BOMs come in from CAD exports. Estimation is covered: each enquiry is estimated from similar past jobs' actual costs, and the estimate becomes the job's budget when the order is won.

See Emplotec run your engineering and fabrication business.

Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.

  • A call within one working day, from the people who build it, not a sales team.
  • Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
  • Cloud or your own servers, the same build either way, with your own database.

We only use these details to reply to you. No spam, ever.

WhatsApp