Textile ERP software for mills and garment exportersEvery kilo sent out, counted back. Every style costed to the piece.
For spinning, weaving and knitting mills, processing houses and garment exporters: yarn, greige and fabric followed through every job worker by the kilo, lots and shades by the roll, orders by colour and size, buyers' AQL, packing lists and exports under LUT. One system, with an agent that works across all of it.
- Runs onManufacturing · Inventory · CRM & Sales · Quality · Procurement · HRMS · Books · Planning
- Fitted to youYour fields, rules, documents and screens
- Going liveData moved in 48 hours, live in 30 days
This is the app. Click any page on the left, and ask Emplotec on each one.
Emplotec Send the 4 off-shade rolls back for correction at Kumaran's cost and knit 80 kg more navy greige from yarn on hand. Both are back by 20 November, so the last 940 navy tees are cut on the 21st, and the 74 kg over the norm becomes a debit note.
JW-3121Loss normsYarn stockIn this example, Kongu Knit Exports runs its Tiruppur unit on Emplotec. The navy lot for Nordlys came back from the dyer over the loss norm and partly off shade, the order is 940 tees short, and Emplotec has a recovery plan waiting for Anand. Click through orders, job work, lots and shades, the lines, AQL, lab dips, style costing, samples and T&A, piece rates and shipments. Example companies, people and figures.
From the yarn to the realised export bill.
Emplotec follows Nordlys's tees to every job worker and back, then through cutting, AQL and export, and people approve every plan it drafts.
The yarn store
Yarn is received by count and lot, so every kilo after it carries PS-2210.
PO-1462, Palladam Spinners
The knitter
Yarn goes out on a challan with its e-way bill, and greige comes back weighed.
Sri Vinayaga: 1.5% against 2%
The dyer
Navy lot L-0418 came back short and off shade, so Emplotec plans the recovery.
940 tees, cut 21 Nov
Compacting and printing
Every challan shows its kilos, its age and its ITC-04 line, job worker by job worker.
₹51.2 L of fabric out
Cutting and the lines
Rolls are cut by shade band, and bundles carry their band to the lines.
Lay 2: band B, 14 rolls
Checking and final AQL
Inline checks catch defects at the line, and the pre-final runs at AQL 2.5.
94.8% passed first time
Exports and the accounts
Kumaran's loss over norm is drafted as a debit note, and every export realisation is tracked.
₹22,348 debit; margin 12.6%
Does your week look like this?
These are the moments the job work notebook and the order file stop working for mills and garment exporters.
Your fabric is at five job workers, and nobody can say how many kilos are where until someone drives round.
Job work notebook and WhatsAppEvery challan out and every receipt back is weighed against the other, by process and job worker, with ageing. One screen shows every kilo outside the gate.
The dyer returns a lot 4% over the loss norm and partly off shade. You find out at cutting, and the order is short.
Phone callsEach return is weighed against the norm and checked roll by roll for shade and GSM. Emplotec shows the shortfall in garments and drafts the recovery and the debit note.
ITC-04 takes a week every quarter, rebuilt from challans in files.
Excel and TallyITC-04 is prepared from the same challans and receipts, with the ones still open listed for follow-up. Your accountant files it.
You know what a style really cost only after it ships, so the next costing sheet repeats the same guess.
An Excel costing sheetYarn, every job work bill, line time and trims are booked to the order as they happen, against its costing sheet, so the next quote starts from what it really cost.
The buyer's final AQL fails on measurements, and the shipment misses its vessel.
Paper inspection reportsInline and pre-final checks run on tablets against the buyer's AQL and measurement chart, and you see readiness for the final audit by Thursday, not Friday.
The PP sample is late because the fabric was still at the compactor, and the T&A sheet showed green until the buyer asked.
A T&A sheet in ExcelEvery order has its T&A calendar, from lab dips and fit samples to the PP sample, size set and ex-factory, read from the job work, fabric and line records themselves, so a slip shows the day it starts.
Hundreds of workers, three contractors, overtime every week, and a social audit asking for the records.
Attendance registersBiometric attendance, shifts and overtime flow into payroll with PF and ESI. Piece rates come from scanned bundle tickets, and contract workers, their wages and registers are on the same record.
One textile ERP, from the buyer's PO to the realised export bill.
Orders, job work, fabric, production, quality, people and accounts run on one system, set up for textiles and garments. Orders, job work, fabric, quality, people and money share the same data from day one.
- Job work given and received, with ITC-04
- Loss norm per process and job worker
- Planned against actual, per style
- Rolls with lot, shade band and GSM
- Stock at job workers on the same ledger
- Colour and size as item variants
- Orders by colour and size
- Packing lists from scanned cartons
- Buyer's PO read from PDF or Excel
- Overtime by worker and line
- Contract workers and their wages
- PF, ESI, Professional Tax and LWF
- Exports under LUT, realisation tracked
- Job worker bills against their challans
- Keep Tally for accounts until you move
- AQL inline and before dispatch
- Shade, GSM and 4-point checks by roll
- Buyer audits and their findings
- Budget against actuals every month
- CMA data in your bank's template
- Raw material price as a scenario
- Major defects
- 9 of 14 allowed
- Minor defects
- 16 of 21 allowed
- Inspector
- Divya Menon
- Buyer's audit
- Fri 13 Nov, 10:00
- Unrealised
- ₹3.68 Cr
- Past due date
- ₹31.8 L
- LUT
- FY 2026-27, on record
- Bank
- Feeds matched daily
One order, from the buyer's PO to the realised bill.
Nordlys's 24,000 tees, followed through every process and every product they touch, navy lot included. Nobody re-enters anything, and every step is a record you can open.
- 01 · CRM & Sales
The buyer's PO comes in
Rahul Bose sends Nordlys's PO as a PDF. Emplotec reads it into a draft order by colour and size, checks the price against the approved costing, and Meera confirms it.
NL-2611 · NAB-PO-55120 - 02 · Manufacturing
Costed and planned back to yarn
MRP works back from 5,520 kg of finished fabric through each process's loss norm to the yarn to buy, and lists the job work at each step.
MRP-0142 · NL-2611 - 03 · Procurement
Yarn bought by count and lot
Ravi raises the yarn PO. When it arrives, the GRN records the count, the lot and the mill's test report, so every kilo after it carries lot PS-2210.
PO-1462 · Palladam Spinners - 04 · Manufacturing
Out to the knitter, back by the kilo
Yarn goes to Sri Vinayaga on a job work challan with its e-way bill. Greige comes back by the roll and is weighed against the yarn sent and the 2% norm.
JW-3109 · Sri Vinayaga Knitting - 05 · Quality
Back from the dyer, checked roll by roll
Lakshmi checks each navy roll on her tablet for weight, GSM, defects and shade band. Four rolls fall outside the band Nordlys approved and are held, and the shortfall reaches planning the same hour.
L-0418 · 40 rolls - 06 · Quality
Cut, stitched and passed at final AQL
Bundles go to the lines with their shade band. Inline checks catch defects at the line, the pre-final runs against AQL 2.5, and the buyer's inspector passes the lot.
NL-2611 · final AQL 2.5 - 07 · Books
Shipped under LUT, realised
The packing list comes from the scanned cartons, the export invoice goes out under LUT, and when Nordlys pays, the receipt matches the bill and the realisation is recorded.
EXP-2026-131
Ask your unit anything.
Emplotec reads across orders, job work, fabric, lines, people and accounts at once. It answers with the records it used, and anything it would change waits for your approval.
Kumaran Dyeing, by a distance, mostly on dark shades. ₹86,000 of loss beyond the norm hasn't been recovered. I've drafted the debit notes and a note for your next rate talk with Kumaran.
Yes, for ex-factory 20 February, if the yarn is ordered by 1 December. I've drafted the reply for Meera at HB-0934's price, and the yarn requirement for Ravi.
ITC-04 is ready except for four challans. I've drafted reminders to both job workers. Your accountant files it once they're in.
Mostly. Rotate Line 3's overtime so nobody crosses your limit again, and get the missing ESI challan from Kongu Labour Services before the audit. I've drafted both for Deepa.
Which job worker loses the most fabric, process by process?
Job work challansReceiptsLoss normsDebit notesBills- Weighing every challan out against its receipts
- Grouping loss by process and job worker
- Comparing with each norm
- Pricing the loss beyond the norm
- Kumaran Dyeing: 11.4% over 90 days against a 9% norm, 412 kg beyond it
- Sri Vinayaga Knitting: 1.5% against 2%
- Noyyal Compacting: 0.9% against 1%
- Only ₹38,200 of Kumaran's ₹1.24 L excess has been debited
Kumaran Dyeing, by a distance, mostly on dark shades. ₹86,000 of loss beyond the norm hasn't been recovered. I've drafted the debit notes and a note for your next rate talk with Kumaran.
- Debit notes, 6 challans
None₹86,000 draft - Kumaran's pending bills
DueHeld until settled
Nothing changes until you approve.
Emplotec works with the same permissions as the person asking. It drafts, plans and checks; a person approves, sends and files. How the agent works
Your unit's way of working, not ours.
Emplotec fits your process at four levels. The core is never forked, so everything we change for you carries through every upgrade.
JW-3121NL-2611 · navy · to Kumaran Dyeing- Process
- Dyeing, reactive
- Lot
- L-0418
- Sent
- 1,840 kg, 46 rolls
- Date
- 22 Oct 2026
- Loss norm
- 9%
- Expected back
- 1,674 kg
- Lab dip referenceLD-2611-N2
- GSM required180 ± 5
- Merchandiser approval
- Hold the job worker's bill when loss is over the norm
- Tell the merchandiser when fabric sits out past 30 days
- Shade band per roll on returnA 22 · B 14 · C 4
- ITC-04 line from the challan
- Nordlys's organic certificate referenceTC-2611-0418
- Nordlys orders: shade approval photo before cutting
The core stays the same for every customer, so all of this carries through every upgrade.
Need software Emplotec doesn't have? We build it.
Emplotec is built by a software company. If your unit needs something outside the ERP, such as an app for your job workers or a portal for your buyers, our team builds it and connects it to Emplotec, under the same support.
- A phone app where job workers confirm what they received and send back
- A buyer portal for order status, inspection reports and packing lists
- A link from your cutting room's marker files to the cut plan
- Your old order files and job work registers, moved and kept searchable
Built for the rules where you make.
Your country's tax and statutory rules are part of the system, not an add-on. Your market opens first; the others are a click away.
India
- Job work and ITC-04 across every process, with job worker reconciliation
- E-invoices and e-way bills, including on challans to job workers
- Exports under LUT, with realisation tracked on every bill
- GSTR-1 and 3B data, IMS and GSTR-2B reconciliation
- PF, ESI, Professional Tax and LWF on the Labour Codes
- Contract labour registers and returns under the OSH Code
- MSME payment dates tracked on every vendor bill
- Tally sync, if your accounts stay in Tally for now
UAE
- VAT on every invoice and bill
- E-invoicing
- Corporate tax
- WPS payroll
- Free-zone entities alongside the mainland
- Process loss tracked by job worker
Saudi Arabia
- VAT on every invoice and bill
- ZATCA e-invoicing (FATOORA)
- GOSI payroll
- Process loss tracked by job worker
United Kingdom
- VAT with Making Tax Digital
- PAYE payroll with RTI
- Process loss tracked by subcontractor
United States
- Sales tax, state by state
- Payroll
- 1099 forms
- Process loss tracked by subcontractor
Live in 30 days, between two shipments.
We move your data in 48 hours and take you live in 30 days. Your proposal says what live covers: which units, products and companies. The system is set up for textiles and garments, then fitted to your unit's own workflow, so processes, job workers, lots and styles read the way your team already works.
- We map your unit first: processes, job workers and their loss norms, how orders are costed and how fabric is checked today.
- Your items by count, colour and size, open orders, stock at home and at job workers, and balances come across from Tally and Excel.
- We fit challans, the roll check, costing sheets, packing lists and your buyers' formats to the way you work.
- Merchandisers, stores, supervisors and checkers train on your own orders, then go live order by order.
Questions textile and garment makers ask
What is the best textile ERP software?
One that follows every kilo through every job worker, weighs what comes back against each process's loss norm, keeps lots and shades by the roll, costs each style against its real cost, prepares ITC-04 and runs packing lists and exports, on the same ledger as your accounts. Emplotec does all of that in one system, with an agent across it.
Does Emplotec handle job work at every process?
Yes. Knitting, weaving, dyeing, printing, compacting, embroidery and stitching each run as job work given, with challans, e-way bills, receipts by the kilo or the piece, loss against a norm per job worker, and ageing. Processing houses use job work received for customers' fabric and conversion charges.
Can it track lots, shades and sizes?
Yes. Rolls carry their lot, shade band, GSM and weight, garments carry colour and size as item variants, and orders are taken and planned by colour and size.
Is it suitable for a spinning or weaving mill?
Yes. Spinning mills run cotton by bale and lot, each mixing recorded against its lot, yarn by count with waste by department, and cones and bags packed by lot. Weaving mills run warp beams and sizing, production by loom and picks, and fabric by piece and metre with its inspection grade. Both run purchases, job work both ways, and dispatch with e-invoice and e-way bill; live monitoring of the machines stays with the machines' own systems.
Does it handle samples, lab dips and the T&A calendar?
Yes. Proto, fit, PP and size set samples are recorded with the buyer's comments and their cost. Lab dips are logged by shade and option until the buyer approves one, and the approved recipe is issued with every dye lot. Each order's T&A calendar runs from lab dips to ex-factory, with its dates read from the job work, fabric and line records.
Does it prepare export documents?
Yes. The export invoice under LUT and the packing list come from the order and the scanned cartons, and each shipment has its checklist: certificate of origin, the buyer's inspection certificate, bill of lading and certificates such as an organic transaction certificate. The shipping bill is filed by your customs broker on the customs portal; its number, the drawback and RoDTEP expected and the realisation are recorded against the shipment.
Can we keep Tally for our accounts?
Yes. Orders, job work, stores and production run on Emplotec and your accounts sync to Tally until you choose to move to Emplotec Books.
Can you customise it for our process?
Yes, at four levels: configuration of fields, forms, approvals and dashboards; business rules; extensions for textiles and garments; and extensions for your own workflow. The core is never forked, so your changes survive upgrades.
Does it run on our own servers?
Yes. Emplotec runs in the cloud or on your own servers, the same build either way, and each customer has its own database.
What doesn't Emplotec cover for textile and garment makers?
Colour kitchen dosing machines, and live monitoring of spinning frames, looms or knitting machines. CAD marker making and pattern grading. Export incentive claims and shipping bill filing on the government portals. Dye recipes and piece rates are covered: each dye lot is issued against its shade's recipe, and piece rates are counted from each operator's bundle tickets into payroll.
See Emplotec run your textiles and garments business.
Tell us how your work runs today. We'll show you Emplotec on your own process, with your documents, and say plainly what fits and what we'd build.
- A call within one working day, from the people who build it, not a sales team.
- Your data moved in 48 hours, live in 30 days. Your proposal says what “live” covers.
- Cloud or your own servers, the same build either way, with your own database.