8D report format with D0 to D8 and a worked automotive example
An 8D report takes a customer complaint from the first containment to closure in eight disciplines, with the evidence for each. Fill this one in on the page with a worked example, or download it.
- D0 to D8 on one sheet
- Is / is not and containment quantities
- Root cause and escape point
- A4 portrait, Excel with formulas
Written for India. Elsewhere:8D report template US
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Eight disciplines of problem solving
D0. Prepare and emergency response
D1. Team
| Name | Role in the 8D | Department | Phone or email |
|---|---|---|---|
D2. Problem description (5W2H)
D2. Is
D2. Is not
D3. Interim containment
| Location | Checked | Not OK | OK | How marked | Date |
|---|---|---|---|---|---|
| Total |
D4. Root cause: occurrence
D4. Escape point: why not detected
D5 and D6. Permanent corrective actions, verified and validated
| Action | Occurrence or escape | Owner | Done on | Verification and validation |
|---|---|---|---|---|
D7. Prevent recurrence
| Document or system | Change made | New revision | Date |
|---|---|---|---|
D8. Closure and team recognition
Eight disciplines of problem solving
D0. Prepare and emergency response
Customer line stoppage risk confirmed at 14:20 on 10-11-2026. Emergency response: 600 replacement brackets from the last good lot (B-1101-03), 100% checked for thread depth, sent by 22:00 the same day.
D1. Team
| Name | Role in the 8D | Department | Phone or email |
|---|---|---|---|
D2. Problem description (5W2H)
What: M10x1.25 tapped hole short of thread depth (13.1 mm against 15.0 mm min), mounting bolt does not seat. Where: customer caliper assembly, station 4. When: lots of 3 and 4 Nov 2026. Who found it: customer's torque check. How many: 14 of 2,400 delivered. How detected: bolt torque failure.
D2. Is
D2. Is not
D3. Interim containment
| Location | Checked | Not OK | OK | How marked | Date |
|---|---|---|---|---|---|
| 1,829 | |||||
| 557 | |||||
| 1,194 | |||||
| 378 | |||||
| Total | 3,980 | 22 | 3,958 |
D4. Root cause: occurrence
D4. Escape point: why not detected
D5 and D6. Permanent corrective actions, verified and validated
| Action | Occurrence or escape | Owner | Done on | Verification and validation |
|---|---|---|---|---|
D7. Prevent recurrence
| Document or system | Change made | New revision | Date |
|---|---|---|---|
D8. Closure and team recognition
No recurrence in 6 lots (14,400 pcs) since 18-11-2026. Customer confirmation requested. Team recognised at the monthly quality review.
Example entries. Go back to blank to fill in your own.
What an 8D report is
An 8D report is the record of solving one problem, usually a customer complaint, in eight disciplines: the team, the problem described with facts, the containment, the root cause, the permanent fix, its validation, the steps that stop it recurring, and closure. The method was developed at Ford and is now the common language between suppliers and their customers in automotive, engineering and electronics.
IATF 16949 requires a documented problem-solving process (clause 10.2.3), and most OEMs name 8D, or their own version of it, in their supplier quality manuals. When a customer raises a complaint, it is the 8D they read, discipline by discipline, before accepting it.
The eight disciplines, D0 to D8
| Discipline | What it asks | What the customer checks |
|---|---|---|
| D0. Prepare and emergency response | Is an 8D needed? What protects the customer right now? | Line stoppage avoided; good parts sent |
| D1. Team | Who has the product, process and quality knowledge to solve it? | A cross-functional team with a champion |
| D2. Describe the problem | What, where, when, how many, in facts (5W2H and is / is not) | A measured problem, not "quality issue" |
| D3. Interim containment | How are customers protected while the root cause is found? | Every location sorted, with quantities and marking |
| D4. Root cause and escape point | Why did it occur, and why was it not detected? | Both causes, verified by switching the problem on and off |
| D5. Permanent corrective actions | What removes each root cause, and is it proven to work? | One action per root cause, verified before rollout |
| D6. Implement and validate | Is the action in place, and do production results prove it? | Data from later lots, containment removed |
| D7. Prevent recurrence | Which systems, documents and similar parts must change? | PFMEA, control plan, work instructions, other lines |
| D8. Close and recognise the team | Is the customer satisfied, and is the team thanked? | Formal closure with dates |
How to fill in the 8D report format
- Fill the header from the customer's complaint: their reference, the part, the drawing revision and the quantity they report.
- At D0, write what you did in the first hours to keep the customer's line running.
- At D1, name a champion with the authority to approve changes, a team leader and the members from production, process engineering and quality.
- At D2, describe the problem as measured, then fill the is and is not boxes. The difference between "is" and "is not" usually points to the cause.
- At D3, list every place suspect parts can be: the customer, in transit, finished goods, work in progress and the supplier. The sheet works out the good quantity at each and the total.
- At D4, run a why-why for occurrence and another for the escape point. Write how each root cause was verified.
- At D5 and D6, write one action per root cause, its owner, the date and the evidence that it works on later production.
- At D7, name every document changed with its new revision, and the similar parts and machines the fix was applied to.
- At D8, record the result since the fix and ask the customer to accept closure.
Containment that a customer will accept
- Count every location: the customer's stores and line, goods in transit, your finished goods, work in progress, and any stock at a sub-contractor or warehouse.
- Check 100% with a method that detects the defect. A visual check for a depth defect is not containment.
- Mark the checked parts in a way the customer agreed (a paint dot on the checked feature is common), and write the marking in the 8D.
- Keep containment in place until D6 shows the permanent action works, and write the date it was lifted.
8D, why-why analysis and CAPA compared
| 8D report | Why-why analysis | CAPA | |
|---|---|---|---|
| Used for | Customer complaints and serious internal failures | Finding the root cause of one problem | Any internal, audit or supplier finding |
| Covers | Team, problem, containment, root cause, actions, validation, recurrence, closure | The chain of causes for occurrence and escape | Correction, root cause, action and effectiveness |
| Who asks for it | The customer, usually by name in the supplier manual | Inside an 8D or a CAPA | ISO 9001 clause 10.2 and auditors |
Common reasons customers reject an 8D
- The problem in D2 is not measured: no dimension, no quantity, no dates.
- Containment misses a location, often goods in transit or stock at the customer's warehouse.
- Only the occurrence cause is found; nothing explains why inspection let it through.
- The root cause is "operator error" and the action is "operator trained".
- D6 has no production data after the fix, only the date it was done.
- D7 changes nothing in the PFMEA or control plan, so the same failure can return on the next part.
Emplotec Quality
Or build the 8D from the records you already have.
In Emplotec the customer complaint is linked to the dispatch it came from, so the affected lots, stock locations and quantities are on the 8D from the start. The root cause, actions and the PFMEA and control plan changes stay on the part's record.
- Customer complaints are linked to the dispatch and to Quality, with rejection debits from the customer on the same record.
- NCR, CAPA with root cause and an effectiveness check, and 8D for customer complaints.
- PFMEA (AIAG-VDA), control plans and PPAP packs live with the part, so D7 updates them in place.
- Every heat and batch is traced from the gate to the customer, so containment starts from a list, not a search.
- PFMEA op 40, rev 7
- Control plan CP-2207, rev 6
- WI tap change, rev 4
- 9 VMCs, presetter check
- Customer closure
Emplotec Six lots, 14,400 brackets, have shipped since the fix with no thread-depth reject at final. Containment can be lifted once Deccan Motors accepts. Draft the closure request with the D6 data?
8D/26-27/0019IR/26-27/04412CP-2207 rev 6An 8D for a thread-depth complaint: containment by location, both root causes and the D7 changes. Example companies, people and figures.
Questions people ask about the 8D report format
What does 8D stand for?
Eight disciplines: team, problem description, interim containment, root cause, permanent corrective action, implementation and validation, prevention of recurrence, and team recognition. Many formats add D0, preparation and emergency response, before them.
When is an 8D report required?
When a customer asks for one, usually for a complaint or a rejection, and for serious internal failures your own procedure sends to 8D. Automotive OEMs name the 8D in their supplier quality manuals.
What is the difference between D3 and D5?
D3 is interim containment: sorting and marking to protect the customer while the cause is found. D5 is the permanent corrective action that removes the root cause, so containment can be lifted.
What is the escape point in D4?
The control point in your process that should have detected the defect but did not. The 8D must explain why it was missed and fix it, as well as the cause of the defect itself.
Is 8D required by IATF 16949?
IATF 16949 clause 10.2.3 requires a documented problem-solving process with containment, root cause analysis, corrective action and verification. It does not name 8D, but most customers specify 8D or their own format for it.
How long does an 8D take to close?
It depends on the customer's requirements and the problem. Containment is usually expected within a day or two, and closure only after production data proves the permanent action works. Your customer's supplier manual gives the dates they expect.
Sources
- ASQ: What is 8D? Eight disciplines problem solvinghttps://asq.org/quality-resources/eight-disciplines-8d
- IATF 16949:2016, clause 10.2.3 Problem solving (IATF Global Oversight)https://www.iatfglobaloversight.org/
- AIAG: CQI-20 Effective Problem Solvinghttps://www.aiag.org/