OEE calculator: availability, performance and quality

Enter one shift's time, stops, ideal cycle time and counts to get availability, performance, quality and OEE, with the minutes lost to each.

  • Availability × performance × quality
  • Minutes lost to each
  • World-class benchmarks
  • Cycle time or run rate

Last updated

One shift on one machine

min
min

Breaks, meals, planned maintenance, no orders.

min

Breakdowns, setups, changeovers, waiting for material. Every stop while the machine was meant to run.

Ideal speed given as
sec per piece

The fastest the machine can run this part, by design or the best sustained rate seen, not the standard you plan with.

pcs

Everything made, good and bad.

pcs

Right first time; rework counts as bad.

OEE

80.3%

Typical for discrete manufacturing (60% to 85%)

Availability
91.3%
Performance
90.7%
Quality
97.0%

The biggest loss is availability: 38 min of the 435 min planned, from breakdowns, setups and changeovers.

Where the planned time went

  • Good parts at ideal speed 349.2 min
  • Quality loss 10.8 min
  • Speed loss 37 min
  • Downtime 38 min

Against world-class figures

OEE80.3% of 85%
Availability91.3% of 90%
Performance90.7% of 95%
Quality97.0% of 99.9%

How it is worked out

Figure
Planned production time480 less 45 planned stops435 min
Run timeless 38 min downtime397 min
Availabilityrun time ÷ planned production time91.3%
Ideal time for the count900 pcs × 24 sec360 min
Performanceideal time ÷ run time90.7%
Rejects900 made less 873 good27 pcs
Qualitygood count ÷ total count97.0%
OEEavailability × performance × quality80.3%

Check: good count × ideal cycle time ÷ planned production time gives the same OEE. Planned stops are left out of OEE; count them in TEEP if you measure against all time.

The OEE formula

OEE (overall equipment effectiveness) = availability × performance × quality. It is the share of planned production time in which a machine makes good parts at its ideal speed. The same figure, read as time: good count × ideal cycle time ÷ planned production time.

FactorFormulaWhat it loses
AvailabilityRun time ÷ planned production timeTime the machine was meant to run but stood: breakdowns, setups, changeovers, waiting
Performance(Ideal cycle time × total count) ÷ run timeSpeed while running: small stops and slow cycles
QualityGood count ÷ total countParts made but not good first time: rejects, rework, start-up scrap

Planned production time is the shift less planned stops such as breaks, meals and planned maintenance. Run time is planned production time less unplanned stops.

A worked example

One 8-hour shift on a CNC lathe, with an ideal cycle time of 24 seconds:

StepWorkingResult
Planned production time480 min shift − 45 min breaks435 min
Run time435 − 38 min downtime397 min
Availability397 ÷ 43591.3%
Performance(24 s × 900) ÷ (397 × 60 s)90.7%
Quality873 good ÷ 900 made97.0%
OEE0.913 × 0.907 × 0.97080.3%
Check873 × 24 s = 349.2 min ÷ 435 min80.3%

Of the 435 planned minutes, 38 went to downtime, 37 to slow running and small stops, and 10.8 to the 27 rejects. These are the calculator's opening figures.

What is a good OEE?

OEEWhat it usually means
85% or moreWorld class for discrete manufacturing
60% to 85%Typical for discrete manufacturing, with room to improve
40% to 60%Low, and common where OEE is first measured honestly
Below 40%Check the inputs first, then the biggest loss

The 85% world-class figure comes from the TPM targets of 90% availability, 95% performance and 99.9% quality (0.90 × 0.95 × 0.999 = 85.4%). It is a benchmark, not a law: a line with long changeovers by design, or a process plant, will sit elsewhere. The trend on the same machine tells you more than a comparison with someone else's.

The six big losses

Seiichi Nakajima's grouping, from Total Productive Maintenance.
LossOEE factorExamples
1. BreakdownsAvailabilityEquipment failure, tooling failure, unplanned maintenance
2. Setup and adjustmentsAvailabilityChangeovers, first-off approval, warm-up, waiting for material or an operator
3. Small stopsPerformanceJams, misfeeds, blocked sensors, short stops under a few minutes
4. Reduced speedPerformanceRunning below the ideal rate: worn tools, cautious settings, poor material
5. Start-up rejectsQualityScrap and rework while the process settles after a start or changeover
6. Production rejectsQualityScrap and rework during steady running

Short stops are easy to miss on a log sheet: if performance is low and no-one can say why, it is usually dozens of stops of under five minutes each.

Common mistakes

  • Using the planned or standard cycle time instead of the ideal one. A padded cycle time hides speed loss and can push performance past 100%.
  • Treating setups and changeovers as planned stops. They are downtime: losses OEE is meant to show.
  • Counting reworked parts as good. Quality counts only parts that were right first time.
  • Averaging the OEE of several machines. Add up their good minutes and planned minutes instead, so a long-running machine weighs more.
  • Chasing one number. OEE is useful because it splits into three, and each points at a different fix.

OEE and TEEP

OEE measures against planned production time. TEEP (total effective equipment performance) measures against all the time there is, 24 hours a day, so it also shows how much of the week is not scheduled at all. TEEP = OEE × planned production time ÷ calendar time. It answers a capacity question: whether to add a shift before buying a machine.

Emplotec Manufacturing

Or get OEE from the shop floor's own entries.

In Emplotec, OEE and downtime come from job cards and the downtime log your operators already fill in, machine by machine.

  • Work orders, job cards and shop-floor kiosk entry give the counts, good and rejected, for every operation.
  • OEE and downtime per machine, with scrap, rejection and rework against each job.
  • A finite-capacity schedule that re-sequences when a machine breaks down or a rush order lands.
  • Downtime feeds capacity and maintenance, with preventive plans and spares in Assets & Maintenance.
OEE · Machining cellPlant 2 · Shift A, 12 Nov
ShiftWeekLossesOpen downtime logExport
EmplotecCNC-07 lost 64 min to two spindle alarms. Its preventive check is 9 days overdue.
Cell OEE76.4%
Availability86.9%
Performance90.1%
Quality97.6%
OEE by machine, against 85%
  • CNC-03Lathe · housings80.3%
  • CNC-05Lathe · shafts84.1%
  • VMC-02Machining centre78.6%
  • CNC-07Lathe · flanges62.7%
Downtime, this shift
  • CNC-07 Spindle alarm, 41 min
  • VMC-02 Changeover to HS-40, 26 min
  • CNC-07 Spindle alarm, 23 min
  • CNC-03 Waiting for material, 18 min

OEE for one shift across the machining cell, from job cards and the downtime log. Example companies, people and figures.

Questions people ask about the OEE calculator

What is the formula for OEE?

OEE = availability × performance × quality. Equivalently, good count × ideal cycle time ÷ planned production time.

What is a good OEE score?

85% is widely quoted as world class for discrete manufacturing, from targets of 90% availability, 95% performance and 99.9% quality. Around 60% is typical, and 40% is common where OEE is first measured.

What are the six big losses in OEE?

Breakdowns and setups (availability), small stops and reduced speed (performance), and start-up rejects and production rejects (quality).

Is changeover time included in OEE?

Yes. Setups and changeovers are unplanned stops in OEE terms and reduce availability. Only breaks, meals, planned maintenance and time with no orders are taken out as planned stops.

Can OEE be more than 100%?

No. If performance comes out above 100%, the ideal cycle time entered is slower than the machine really runs. Use the fastest proven cycle time.

What is the difference between OEE and TEEP?

OEE measures against planned production time; TEEP measures against all calendar time. TEEP = OEE × planned production time ÷ calendar time, so it also shows the time not scheduled.