Free templateProduction and quality
Bill of materials template with multi-level costing in Excel
A bill of materials (BOM) lists every assembly, part and material in one unit of a product, with the quantity of each. This template indents the levels, multiplies quantities through them, adds scrap, and rolls material, labor and overhead up to a standard cost per unit and per build.
- Indented levels with quantity roll-down
- Make or buy, MPN, reference designators
- Standard cost per unit and per build
- A4 landscape, Excel with formulas
Country versions:Bill of materials format India
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Manufacturing BOM, per 1 unit of the top-level item
Components
| Level | Part no. | Description | Mfr part no. / ref. des. | Make or buy | UoM | Qty per parent | Parents per unit | Qty per unit | Scrap % | Unit cost | Extended cost |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Material cost per unit | |||||||||||
Standard cost and build quantity
| Material cost per unit (total above) | |
|---|---|
| Direct labor hours per unit | |
| Labor rate per hour | |
| Direct labor per unit | |
| Overhead, % of direct labor | |
| Overhead per unit | |
| Standard cost per unit | |
| Build quantity | |
| Material for the build | |
| Standard cost of the build |
Notes
Manufacturing BOM, per 1 unit of the top-level item
Components
| Level | Part no. | Description | Mfr part no. / ref. des. | Make or buy | UoM | Qty per parent | Parents per unit | Qty per unit | Scrap % | Unit cost | Extended cost |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0.00 | ||||||||||
| 1 | 5.10 | ||||||||||
| 1 | 2.90 | ||||||||||
| 4 | 4.60 | ||||||||||
| 3 | 1.86 | ||||||||||
| 20 | 0.21 | ||||||||||
| 2.50 | 0.22 | ||||||||||
| 1 | 3.40 | ||||||||||
| 1 | 2.75 | ||||||||||
| 4 | 0.16 | ||||||||||
| 1 | 0.18 | ||||||||||
| 1 | 0.85 | ||||||||||
| 1 | 0.12 | ||||||||||
| Material cost per unit | 22.35 | ||||||||||
Standard cost and build quantity
| Material cost per unit (total above) | 22.35 |
|---|---|
| Direct labor hours per unit | |
| Labor rate per hour | |
| Direct labor per unit | 11.20 |
| Overhead, % of direct labor | |
| Overhead per unit | 16.80 |
| Standard cost per unit | 50.35 |
| Build quantity | |
| Material for the build | 11,175.00 |
| Standard cost of the build | 25,175.00 |
Notes
PCA-200 is built in-house, so it carries no unit cost: its cost is the lines below it. Approved alternate for RLY-0512: RLY-0512B (ECO-26-031). Solder paste is issued by weight; 10% allows for stencil waste.
Example entries. Go back to blank to fill in your own.
What a bill of materials is
A bill of materials (BOM) is the complete list of what goes into one unit of a product: subassemblies, parts, raw materials and consumables, each with its quantity. Purchasing buys from it, the stockroom issues against it, planning runs MRP from it, and accounting costs the product with it. If the BOM is wrong, every one of those is wrong too.
| Type | Who owns it | What it shows |
|---|---|---|
| Engineering BOM (EBOM) | Engineering, from CAD | The product as designed: every part on the drawings, grouped the way the design is |
| Manufacturing BOM (MBOM) | Manufacturing engineering | The product as built: the same parts grouped by how they are assembled, plus consumables, packaging and process materials |
| Single-level BOM | Small products | One flat list under the top item |
| Multi-level (indented) BOM | Most products with subassemblies | Levels 1, 2, 3, so each subassembly lists its own parts |
| Sales or configurable BOM | Products with options | Options and variants that resolve into a build BOM for each order |
This template is a manufacturing BOM: it adds the solder paste, the label, the carton and the installation sheet that an engineering BOM usually leaves out, because the stockroom has to issue them and the cost has to include them.
What each column means
| Column | What to enter |
|---|---|
| Level | 1 for parts that go straight into the top item, 2 for parts of a level 1 subassembly, and so on |
| Part no. | Your internal part number, one per part, never reused for a different part |
| Description | Noun first, then the specification: "Relay, 5 V coil, 10 A contacts" |
| Mfr part no. / ref. des. | The manufacturer's part number (MPN) for bought parts, or the reference designators on the board (U1, K1 to K4) for electronics |
| Make or buy | Make for subassemblies you build, Buy for parts you purchase |
| UoM | Each, g, ft, in, lb: the unit you issue in |
| Qty per parent | How many go into one of the item above it |
| Parents per unit | How many of that parent go into one top-level unit (1 for level 1 parts) |
| Qty per unit | Worked out: qty per parent x parents per unit |
| Scrap % | Expected loss in making: board yield, stencil waste, cut-off |
| Unit cost | Standard or last purchase cost; leave 0 on Make lines |
| Extended cost | Worked out: qty per unit x unit cost x (1 + scrap %) |
How to make a bill of materials, step by step
- Fill in the header: BOM number, top-level item, revision, effective date, drawing number, and the change order that created this revision.
- List level 1: everything that goes directly into the top item, including packaging and documents.
- Under each Make line, list its parts at level 2 with their quantity per parent. Repeat for deeper levels.
- For each Make line's children, set parents per unit to how many of that subassembly go into one finished unit. The sheet multiplies the quantities through.
- Add part numbers, MPNs or reference designators, units of measure and scrap allowances.
- Add unit costs for bought parts. The sheet extends each line and totals the material cost per unit.
- Fill in labor hours, the labor rate and the overhead rate to get the standard cost, and the build quantity to see what a run needs.
- Have engineering and manufacturing sign it, and only then release it. Any later change goes through a change order and a new revision.
Scrap, yield and why the BOM quantity isn't the purchase quantity
The quantity per unit is what ends up in the product. The quantity you issue is higher by the scrap allowance: boards that fail test, paste left on the stencil, the offcut from a length of tube. Putting scrap on the line, rather than padding the quantity, keeps the BOM true to the drawing and the cost true to the shop floor.
Purchasing then works from MRP, not the BOM alone: build quantity x quantity per unit, plus scrap, minus stock on hand and on order, rounded up to the supplier's pack size or minimum order. For the 500-unit build, 20 capacitors per board with 5% scrap is 10,500 capacitors to issue, usually bought as reels of a fixed size.
Revision control and change orders
- Every BOM has a revision letter or number that matches its drawing, and an effective date.
- Changes go through an engineering change order (ECO) that says what changes, why, from which serial number or date, and what happens to stock and work in progress of the old part.
- Approved alternates (a second relay source, an equivalent capacitor) are listed on the BOM, so purchasing can switch without a new revision.
- Keep one released BOM per revision. Copies on desktops drift; mark printed copies as controlled or uncontrolled.
- Where used: before changing a part, check every BOM it appears in.
Common BOM mistakes
- Leaving out consumables, labels and packaging, so the stockroom runs out and the cost is understated.
- Putting a cost on Make lines as well as on their parts, which counts the subassembly twice.
- Quantities per top-level unit typed into level 2 lines, then multiplied again by the parent.
- One part number used for two different parts, or two numbers for the same part.
- Units of measure that don't match how the part is bought and issued (feet against inches, grams against kilograms).
- Editing the released BOM without a change order or revision.
Emplotec Manufacturing
Or let the BOM drive purchasing and the build.
In Emplotec Manufacturing, multi-level BOMs with versions and alternates feed MRP, work orders and job costing, so the parts you buy and the cost you quote come from the same released BOM.
- Multi-level BOMs with versions and alternates, engineering change notes, and a drawing register with revision control.
- BOM import from CAD exports, so engineering's parts list becomes the BOM without retyping.
- MRP from orders, schedules and reorder levels, with what-if MRP compared with the live plan before you commit.
- Job costing planned against actual: material, labor, machine and overhead for every work order.
- Engineering released rev C under ECO-26-031
- Purchasing added RLY-0512B as approved alternate
The VC-200's released BOM, with the build of 500 checked against stock. Example companies, people and figures.
Questions people ask about the bill of materials format
What should a bill of materials include?
For each line: level, part number, description, quantity, unit of measure and make or buy. Most manufacturing BOMs add the manufacturer part number, reference designators, scrap allowance, unit and extended cost, and a header with the revision, effective date, drawing and approvals.
What is the difference between a single-level and a multi-level BOM?
A single-level BOM is one flat list under the product. A multi-level, or indented, BOM shows subassemblies with their own parts underneath, so you can see what goes into each stage of the build.
What is the difference between an EBOM and an MBOM?
The engineering BOM is the product as designed, usually exported from CAD. The manufacturing BOM is the product as built: grouped by assembly steps and including consumables, packaging and documents.
How do you calculate the cost of a BOM?
Multiply each part's quantity per finished unit by its unit cost and by one plus its scrap allowance, then add the lines up. Leave subassemblies you make at zero so they aren't counted twice. Add labor and overhead for the standard cost.
Can I make a bill of materials in Excel?
Yes. This template's Excel download has the formulas for quantity per unit, extended cost and standard cost. Excel gets hard to keep right once you have many products sharing parts, revisions and alternates; that is when BOMs usually move into an ERP.
Who creates the bill of materials?
Engineering creates the engineering BOM from the design. Manufacturing engineering turns it into the manufacturing BOM, and purchasing and accounting check the parts and costs before it is released.
Sources
- APICS (ASCM) Dictionary: bill of material, indented bill and planning bill definitionshttps://www.ascm.org/learning-development/certifications-credentials/dictionary/
Related
Stop typing bill of materialss by hand.
Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.