Free templateSales and dispatch
Gate pass format, returnable and non-returnable, in Excel and PDF
A gate pass lets material leave the premises and tells security what is allowed out, and whether it must come back. This one format covers both returnable and non-returnable gate passes.
- Returnable and non-returnable
- Balance to return worked out
- Excel with formulas
- Free, no sign-up
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
Tick one: returnable / non-returnable
| Sr. | Description of material | Code or serial no. | Unit | Qty out | Qty returned | Balance | Returned on | Inward GE no. |
|---|---|---|---|---|---|---|---|---|
| Total | ||||||||
Instructions
Security checks the material against this pass before it leaves, and signs with the time. Goods that leave for repair, job work or approval also need a delivery challan, and an e-way bill where the rules require one. For a returnable pass, security records each return with the inward gate entry number; stores follows up on any balance after the expected return date.
Tick one: returnable / non-returnable
| Sr. | Description of material | Code or serial no. | Unit | Qty out | Qty returned | Balance | Returned on | Inward GE no. |
|---|---|---|---|---|---|---|---|---|
| 0 | ||||||||
| 1 | ||||||||
| 0 | ||||||||
| Total | 8 | 7 | 1 | |||||
Instructions
Security checks the material against this pass before it leaves, and signs with the time. Goods that leave for repair, job work or approval also need a delivery challan, and an e-way bill where the rules require one. For a returnable pass, security records each return with the inward gate entry number; stores follows up on any balance after the expected return date.
Example entries. Go back to blank to fill in your own.
What a gate pass is
A gate pass is the permission for material to leave the premises. Stores or the department prepares it, a manager approves it, and security checks the material against it at the gate and keeps a copy. Without a signed gate pass, nothing goes out.
It is an internal control, not a tax document. No law prescribes its format. Its job is to make sure every item that leaves the factory, store or site is authorised, recorded, and, if it is meant to come back, followed up until it does.
Returnable and non-returnable gate pass
| Returnable gate pass (RGP) | Non-returnable gate pass (NRGP) | |
|---|---|---|
| Used for | Tools for regrinding, machines and spares for repair, moulds and dies sent to a job worker, samples on approval, equipment on loan | Sales dispatches, scrap sales, returns to vendors, material transferred for good |
| Comes back | Yes, by an expected date | No |
| Tracked until | Every item is returned and entered at the gate | It leaves |
| Number series | Its own (RGP/...) | Its own (NRGP/...) |
| Document with it | Usually a delivery challan | A tax invoice, debit note or delivery challan |
This format covers both: tick the type at the top. For a non-returnable pass, leave the return columns blank.
What a gate pass format should contain
- Gate pass number in a series for each type, date and time out.
- Who the material is going to, why, and the document that goes with it (challan or invoice number).
- Vehicle number, and the driver or carrier.
- Each item with its code or serial number, unit and quantity.
- For returnables: the expected return date, and space to record each return with its date and inward gate entry number.
- Signatures: the requester, the approver, stores, and security at the gate.
Gate pass, delivery challan and e-way bill
A gate pass doesn't replace the GST documents that must travel with goods. It sits alongside them:
- Goods sold go out with a tax invoice (Rule 46), and the gate pass quotes its number.
- Goods sent for repair, job work or on approval go out with a delivery challan under Rule 55, because no sale is taking place.
- An e-way bill is needed where the consignment's value crosses the limit, and goods sent to a job worker in another state need one whatever their value (Rule 138).
- Inputs sent to a job worker must come back within one year, and capital goods within three years (Section 143). Moulds, dies, jigs, fixtures and tools are outside the time limit. A returnable gate pass with an expected date is how stores keeps track.
How to fill in this format
- Tick returnable or non-returnable, and give the pass the next number in that series.
- Write who the material is going to, the purpose, the challan or invoice number, and, for returnables, the expected return date.
- List each item with its code or serial number and quantity.
- Get it approved by the head of department, and have stores sign that the material is issued.
- At the gate, security checks the material, writes the vehicle and time, signs, and keeps the security copy.
- When returnable material comes back, security records the quantity, date and inward gate entry number. The Excel version works out the balance still out.
Common mistakes with gate passes
- Returnable passes that are never closed, so a mould sits at a vendor for two years and no one notices.
- One number series for both types, which makes open returnables hard to list.
- Items described as 'tools, 1 lot', which security can't check and stores can't trace.
- Material out on a gate pass with no challan, which leaves the vehicle without the document an officer will ask for.
- Partial returns recorded as complete.
Emplotec Inventory
Or let the gate see what stores issued.
In Emplotec the gate pass is raised from the challan, the dispatch or the job-work order, and security sees the same record at the gate, so what goes out, and what is still to come back, is never kept on paper.
- Gate entry, returnable and non-returnable gate passes, and vehicles in and out, linked to GRNs, dispatches and job-work challans.
- Returnables stay open until each item is entered back at the gate, with the balance and the days out.
- One stock ledger shows material at vendors and job workers, item by item.
- Ask Emplotec which returnable passes are past their date, and it drafts the reminders for you to send.
- Security RGP/0391 out, TN 09 BX 2291
- Security GE/5518 in, 6 end mills on RGP/0377
- Security NRGP/1462 out with invoice NW/02431
- Stores RGP/0301 marked overdue
Emplotec Seven returnables are past their date. The oldest are dies at Sahyadri, 131 days late, and a mould at Sri Balaji, 51 days late. Draft return requests to both?
RGP/25-26/1188RGP/26-27/0301Open returnable gate passes, with what has come back and what is overdue. Example companies, people and figures.
Questions people ask about the gate pass format
What is a returnable gate pass?
A gate pass for material that leaves the premises and must come back, such as tools for regrinding, machines for repair or moulds sent to a job worker. It stays open until every item is returned and entered at the gate.
What is the difference between a gate pass and a delivery challan?
A gate pass is an internal permission for material to leave, checked by security. A delivery challan is the GST document that travels with goods moving without a sale, under Rule 55 of the CGST Rules. Material for repair or job work usually needs both.
Who approves a gate pass?
Usually the head of the department sending the material, with stores confirming the issue. For high-value items or assets, many companies add a second approval from accounts or the plant head.
Is a gate pass needed for scrap sales?
Yes, a non-returnable gate pass, alongside the tax invoice for the scrap. The weighbridge ticket, where scrap is sold by weight, should match both.
How many copies of a gate pass are needed?
Commonly three: one for security at the gate, one for the department or stores that issued it, and one that travels with the material.
How long can material stay out on a returnable gate pass?
Your own policy sets the date. Where the material is inputs sent to a job worker, GST sets a limit of one year (three years for capital goods), after which it is treated as supplied.
Sources
- CGST Rules, 2017: Rules 46, 55 and 138, CBIC tax information portalhttps://taxinformation.cbic.gov.in/
- CGST Act, 2017: Section 143 (job work procedure), CBIC tax information portalhttps://taxinformation.cbic.gov.in/
- E-way bill system, GSTNhttps://ewaybillgst.gov.in/
Related
Stop typing gate passs by hand.
Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.