Free calculatorOperations and costing
Reorder level calculator, with the formula, safety stock and EOQ
Enter daily usage and lead time to get the reorder level, the safety stock behind it, the economic order quantity and the minimum and maximum stock levels.
- Max-min or service-level method
- Safety stock and EOQ
- Minimum and maximum levels
- Stock chart
Last updated
Usage and lead time
Plans for the highest usage over the longest lead time, as cost-accounting texts teach.
Order to receipt, on average.
Interest, storage, insurance and loss.
Reorder level
770 units
Place an order when stock falls to 770: 400 used over the lead time plus 370 safety stock.
- Safety stock
- 370 units
- Order quantity (EOQ)
- 849 units
- Minimum level
- 370 units
- Maximum level
- 1,444 units
The service-level method at 95% would set the reorder level at 442, with 42 safety stock. Max-min holds more because it assumes the worst usage and the worst lead time at once.
Stock falls at the average rate. The order goes out at the reorder level (brass dot) and lands one lead time later, as stock reaches the safety stock. Days run left to right.
How each level is worked out
| Units | |
|---|---|
| Demand over the lead time40 a day × 10 days | 400 |
| Safety stock55 × 14 less 400 | 370 |
| Reorder levelmaximum usage × longest lead time | 770 |
| Minimum levelreorder level less average usage × average lead time | 370 |
| Maximum levelreorder level + EOQ less 25 × 7 | 1,444 |
| Average stockminimum level + half the EOQ | 795 |
Economic order quantity
| Figure | |
|---|---|
| Annual demand40 × 300 days | 12,000 units |
| Carrying cost per unit a year20% of ₹250.00 | ₹50.00 |
| EOQ√(2 × annual demand × order cost ÷ carrying cost) | 849 units |
| Orders a year | 14.1 |
| Ordering cost a year | ₹21,201 |
| Carrying cost a yearon half the EOQ held on average | ₹21,225 |
| Total of the two | ₹42,426 |
Units are whatever you stock in: pieces, kg, metres. Safety stock is rounded up to a whole unit. Carrying cost is applied to the average stock of half an order; safety stock adds its own carrying cost on top.
The reorder level formula
Reorder level = demand during the lead time + safety stock. When stock falls to this level, you place the next order, and it should arrive just as stock reaches the safety stock.
Cost accounting texts write the same thing as reorder level = maximum usage × maximum lead time. That is the max-min method: it plans for the worst usage over the longest lead time, and the safety stock is whatever that adds above average demand.
| Level | Formula |
|---|---|
| Reorder level | Maximum usage × maximum lead time (max-min), or average usage × average lead time + safety stock |
| Safety stock (max-min) | Maximum usage × maximum lead time − average usage × average lead time |
| Safety stock (service level) | z × σ of daily usage × √lead time |
| Minimum level | Reorder level − average usage × average lead time |
| Maximum level | Reorder level + reorder quantity − minimum usage × minimum lead time |
| Average stock | Minimum level + ½ reorder quantity |
| Economic order quantity | √(2 × annual demand × cost per order ÷ carrying cost per unit a year) |
Two ways to set safety stock
The max-min method needs only the highest and average figures you have seen, so it is quick and easy to explain. It is also generous: it assumes the worst usage and the worst lead time happen together, which is rare.
The service-level method uses how much usage varies. Pick the share of order cycles you want to get through without running out, look up its z-value, and multiply by the standard deviation of demand over the lead time. If lead time varies too, the spread becomes √(lead time × σ of usage² + average usage² × σ of lead time²).
| Service level | z | Safety stock with σ of 8 a day and a 10-day lead time |
|---|---|---|
| 90% | 1.282 | 33 units |
| 95% | 1.645 | 42 units |
| 97.5% | 1.960 | 50 units |
| 98% | 2.054 | 52 units |
| 99% | 2.326 | 59 units |
| 99.9% | 3.090 | 79 units |
The EOQ formula
Economic order quantity is the order size at which the cost of placing orders equals the cost of carrying stock, so their total is lowest. EOQ = √(2DS ÷ H), where D is annual demand, S the cost of placing one order, and H the cost of holding one unit for a year (usually the unit cost × a carrying rate of 15% to 30%).
The total cost curve is flat near the EOQ, so rounding it to a pack size or a supplier's minimum costs little. Use it as the reorder quantity in the minimum and maximum level formulas.
A worked example
An item used at 40 units a day on average (25 at least, 55 at most), with a lead time of 10 days (7 at least, 14 at most). An order costs ₹1,500 to place, a unit costs ₹250, carrying cost is 20% a year, and the stores work 300 days.
| Figure | Working | Result |
|---|---|---|
| Lead-time demand | 40 × 10 | 400 units |
| Reorder level (max-min) | 55 × 14 | 770 units |
| Safety stock (max-min) | 770 − 400 | 370 units |
| Safety stock at 95%, σ of 8 a day | 1.645 × 8 × √10 | 42 units (reorder level 442) |
| EOQ | √(2 × 12,000 × 1,500 ÷ 50) | 849 units |
| Minimum level | 770 − 400 | 370 units |
| Maximum level | 770 + 849 − 25 × 7 | 1,444 units |
| Average stock | 370 + 849 ÷ 2 | 795 units |
These are the calculator's opening figures. The two methods differ by 328 units of safety stock, worth ₹82,000 at cost and ₹16,400 a year to carry: the price of planning for the worst case on every count.
Reorder level and reorder quantity
The reorder level says when to order; the reorder quantity says how much. A fixed reorder quantity, usually the EOQ, is the classic two-bin system. A min-max system instead orders enough to bring stock back up to the maximum level, so each order varies.
Common mistakes
- Setting a level once and leaving it. Usage and lead times change; review fast movers every quarter.
- Counting lead time from the PO date when approval and dispatch add days before it. Lead time runs from the moment stock hits the level to the moment it can be issued.
- Ignoring stock already on order: compare the level with stock in hand plus open orders, or you order twice.
- Using the same service level for every item. Class A items and those that stop the line deserve more than slow, cheap ones.
- Mixing days: working days for usage and calendar days for lead time.
Emplotec Inventory
Or let the stores raise the indent for you.
In Emplotec, reorder levels and safety stock sit on each item and godown, and stock that crosses its level turns into an indent for someone to approve.
- Reorder levels and safety stock on one stock ledger across every godown, plant and branch.
- Indents raised from reorder levels go for approval and on to the right vendor, with Procurement.
- ABC/XYZ classes, cycle counts, and slow and non-moving stock, so the levels are set where they matter.
- Ask Emplotec which items fell below their level this week, and it lists them with what is already on order.
Items at or below their reorder level in the main stores, with stock on order. Example companies, people and figures.
Questions people ask about the reorder level calculator
What is the reorder level formula?
Reorder level = average usage × average lead time + safety stock. By the max-min method taught in cost accounting, it is maximum usage × maximum lead time.
How do you calculate safety stock?
By the max-min method, safety stock = maximum usage × maximum lead time − average usage × average lead time. By the service-level method, it is z × the standard deviation of daily usage × √lead time in days.
What is the EOQ formula?
EOQ = √(2 × annual demand × cost per order ÷ carrying cost per unit a year). With 12,000 units a year, ₹1,500 an order and ₹50 a year to carry a unit, EOQ is 849 units.
What is the difference between reorder level and reorder quantity?
The reorder level is the stock at which you place an order; the reorder quantity is how much you order. The reorder quantity is often the EOQ.
What is the formula for minimum and maximum stock level?
Minimum level = reorder level − average usage × average lead time. Maximum level = reorder level + reorder quantity − minimum usage × minimum lead time.
What service level should I use for safety stock?
95% is a common default. Raise it to 98% or 99% for items that stop production or that customers wait for, and lower it for cheap, slow items where a short wait costs little.
Sources
- ICAI: Cost and Management Accounting study material, material cost and inventory controlhttps://www.icai.org/
- NIST/SEMATECH e-Handbook of Statistical Methods: the normal distribution and its critical valueshttps://www.itl.nist.gov/div898/handbook/eda/section3/eda3671.htm
- Harris, F. W., How Many Parts to Make at Once (1913), reprinted in Operations Research 38(6), 1990https://pubsonline.informs.org/doi/10.1287/opre.38.6.947
Related
Run this inside one system.
Tell us how your business runs. We'll show you Emplotec doing this work on your own numbers, and reply within one working day.