Free templateProjects and construction
Bar bending schedule to BS 8666, with shape codes and cutting lengths
The BS 8666 bar schedule used on most UAE and Gulf sites, with every shape code's length formula, a cutting length calculator for the common shapes and the weight by bar size. Fill it in here, or download Excel with the formulas working.
- BS 8666:2020 shape codes
- Cutting lengths worked out
- Weight at d²/162 kg/m
- A4 landscape, Excel with formulas
Written for UAE. Elsewhere:Bar bending schedule format India
Last updated
Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.
This schedule conforms to BS 8666:2020
Bars (lengths and dimensions in mm)
| Member | Bar mark | Type | Size | No. of mbrs | No. in each | Total no. | Length L | Shape code | A | B | C | D | E/r | Total length, m | Weight, kg |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total | |||||||||||||||
Notes
Type H: BS 4449 grade B500A, B500B or B500C; B: B500B or B500C; C: B500C; X: other, described on the schedule. Lengths L are from the BS 8666:2020 formulas, rounded up to the next 25 mm. Weight at d²/162 kg per metre.
This schedule conforms to BS 8666:2020
Bars (lengths and dimensions in mm)
| Member | Bar mark | Type | Size | No. of mbrs | No. in each | Total no. | Length L | Shape code | A | B | C | D | E/r | Total length, m | Weight, kg |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 6 | 38.70 | 149.31 | |||||||||||||
| 4 | 29.30 | 72.35 | |||||||||||||
| 82 | 141.45 | 87.31 | |||||||||||||
| 32 | 50.40 | 79.64 | |||||||||||||
| 33 | 158.40 | 140.80 | |||||||||||||
| 25 | 155 | 137.78 | |||||||||||||
| Total | 182 | 573.25 | 667.19 | ||||||||||||
Notes
Type H: BS 4449 grade B500A, B500B or B500C; B: B500B or B500C; C: B500C; X: other, described on the schedule. Lengths L are from the BS 8666:2020 formulas, rounded up to the next 25 mm. Bar 03 is a closed link with hooks of the minimum length; bar 02 is a U-bar, legs A and C down. Weight at d²/162 kg per metre.
Example entries. Go back to blank to fill in your own.
What a bar bending schedule is
A bar bending schedule (BBS) lists every reinforcing bar in a member: its mark, size, number, shape and the dimensions the fabricator needs to cut and bend it. The detailer prepares it from the structural drawings, the engineer checks it, and the steel yard cuts and bends from it. It is also how site, quantity surveyor and supplier agree the tonnage.
On BS 8666 projects the schedule has a fixed layout and a fixed vocabulary: two-digit shape codes, dimensions A to E (or r), the bar type letter and size, and the total length L worked out by the formula for that shape. That is what lets any fabricator in the region read any detailer's schedule.
Why Gulf projects use BS 8666, not IS 2502
Most structural specifications in the UAE and Qatar call up British Standards for reinforcement: bars to BS 4449 and scheduling, dimensioning, bending and cutting to BS 8666. Engineers from India often know the Indian method: IS 2502, with the site practice of deducting about 1d, 2d and 3d for 45°, 90° and 135° bends. The two are not interchangeable.
| BS 8666 (Gulf, UK) | IS 2502 (India) | |
|---|---|---|
| Shape identification | Two-digit shape codes, 00 to 99 | Shapes drawn on the schedule |
| Dimensions | Outside dimensions A to E, with r for the radius | Usually centre-line or outer lengths with stated deductions |
| Length | A formula per shape code, using r and d | Sum of segments, less bend deductions, plus hooks |
| Bend radius | Minimum r from Table 2: 2d up to 16 mm, 3.5d from 20 mm | Set by IS 2502 for the bar type and size |
| Bar notation | H25, B16 (type letter and size) | 25 Ø, 16 # |
| Unit weight | d²/162 kg/m | d²/162 kg/m (the same steel density) |
BS 8666:2020 shape codes and their length formulas
L is the total length along the centre line of the bar, d the bar size and r the minimum radius. A dimension in brackets is the one left free to absorb tolerance. Codes 14, 15, 24 to 29, 34 to 36, 46 and 56 are approximate; for those, check the true length along the bar for larger angles.
| Shape code | Total length L | Shape code | Total length L |
|---|---|---|---|
| 00 | A (straight) | 29 | A + B + (C) |
| 01 | A (stock length) | 31 | A + B + C + (D) - 1.5r - 3d |
| 11 | A + (B) - 0.5r - d | 32 | A + B + C + (D) - 1.5r - 3d |
| 12 | A + (B) - 0.43R - 1.2d | 33 | 2A + 1.7B + 2(C) - 4d |
| 13 | A + 0.57B + (C) - 1.6d | 34 | A + B + C + (E) - 0.5r - d |
| 14 | A + (C) | 35 | A + B + C + (E) - 0.5r - d |
| 15 | A + (C) | 36 | A + B + C + (D) - r - 2d |
| 21 | A + B + (C) - r - 2d | 41 | A + B + C + D + (E) - 2r - 4d |
| 22 | A + B + 0.57C + (D) - 0.5r - 2.6d | 44 | A + B + C + D + (E) - 2r - 4d |
| 23 | A + B + (C) - r - 2d | 46 | A + 2B + C + (E) |
| 24 | A + B + (C) | 47 | 2A + B + 2(C) + 2q - 3r - 6d |
| 25 | A + B + (E) | 48 | 2A + B + 2(C) - r - 2d |
| 26 | A + B + (C) | 51 | 2[A + B + (C)] - 2.5r - 5d |
| 27 | A + B + (C) - 0.5r - d | 52 | 2(A + B) + 2(C) - 1.5r - 3d |
| 28 | A + B + (C) - 0.5r - d | 56 | A + B + C + D + 2(E) - 1.5r - 3d |
| 63 | 2A + 3B + 2(C) - 3r - 6d | 64 | A + B + C + 2D + E + (F) - 3r - 6d |
| 67 | A (curved bar) | 75 | π(A - d) + B + 25 (B is the lap) |
| 77 | Cπ(A - d) (helix; C turns) | 98 | A + 2B + C + (D) - 2r - 4d |
| 99 | Any other shape: a dimensioned sketch, every dimension given |
Minimum radius, former and end projection by bar size
| Bar size d, mm | Minimum radius r | Former diameter M | Minimum end projection P | Unit weight d²/162, kg/m |
|---|---|---|---|---|
| 6 | 12 | 24 | 110 | 0.222 |
| 8 | 16 | 32 | 115 | 0.395 |
| 10 | 20 | 40 | 120 | 0.617 |
| 12 | 24 | 48 | 125 | 0.889 |
| 16 | 32 | 64 | 130 | 1.580 |
| 20 | 70 | 140 | 190 | 2.469 |
| 25 | 87 | 175 | 240 | 3.858 |
| 32 | 112 | 224 | 305 | 6.321 |
| 40 | 140 | 280 | 380 | 9.877 |
| 50 | 175 | 350 | 475 | 15.432 |
Worked example: three bars from a beam and a column
| Bar | Shape and data | Formula | L | On the schedule |
|---|---|---|---|---|
| 02, H20 U-bar | A 500, B 6,420, C 500, r 70 | 500 + 6,420 + 500 - 70 - 2 x 20 | 7,310 | 7,325 |
| 03, H10 link | A 540, B 240, hook C 130, r 20 | 2 x (540 + 240 + 130) - 2.5 x 20 - 5 x 10 | 1,720 | 1,725 |
| 04, H16 L-bar | A 1,200, B 400, r 32 | 1,200 + 400 - 0.5 x 32 - 16 | 1,568 | 1,575 |
Weights follow from the lengths: 82 links of 1.725 m are 141.45 m, and at 10²/162 = 0.617 kg/m that is 87.31 kg. The whole example schedule comes to 667.19 kg.
How to fill in the bar schedule
- Fill the header from the drawing: project, drawing and revision, members, bar standard, cover and who prepared and checked it.
- Give each bar a mark, unique on the schedule, and the member it belongs to.
- Enter the type letter and size, the number of members and the number of bars in each. The total number is worked out.
- Choose the shape code and enter the dimensions A to E as the shape diagram defines them (outside dimensions for most codes). Put the free dimension in brackets on the drawing.
- Work out L on the cutting lengths sheet, round up to the next 25 mm, and enter it in Length L.
- Total length and weight per bar mark are worked out. Copy the lengths by size to the weight summary for the tonnage.
- Have the engineer check the schedule before it goes to the yard; mark revisions with a letter and keep superseded copies.
Common mistakes on BS 8666 schedules
- Using IS 2502 bend deductions on a BS 8666 job, so every bent bar is a few centimetres out.
- Giving centre-line dimensions where the shape code expects outside dimensions.
- A radius smaller than Table 2 allows, which the yard can't bend without cracking the bar.
- A leg shorter than the minimum end projection P for that size.
- Shape 99 used for a shape that has a standard code, or a 99 sent without a dimensioned sketch.
- Weight added from a different unit weight table than the supplier invoices by, so the tonnage never reconciles.
Emplotec Projects
Or reconcile the steel on site against the BOQ.
In Emplotec Projects every issue from site stores is booked to the job, the daily progress report records what was placed, and the material reconciliation shows steel issued against the BOQ, with the cost in the project's forecast.
- Site stores and a material reconciliation against the BOQ for every project.
- A daily progress report on mobile, offline, from the site engineer.
- Subcontractor work orders and their RA bills, measured against the work done.
- Commitments from orders and subcontracts, and a forecast to complete you can trust.
- BBS-FF-014 checked
- Steel issued from stores14.9 t
- Consultant inspection
- Pour booked2 Dec
Emplotec Ground floor steel issued is 0.6 t more than placed, against a 1% allowance of 0.3 t. Most of the difference is 12 mm. Ask the steel fixing subcontractor for the offcut return?
DPR 21 NovIssue IS-26-0388WO-SUB-014Reinforcement issued against the BOQ on a Dubai building project, in tonnes and AED. Example companies, people and figures.
Questions people ask about the BS 8666 bar bending schedule format
What is the formula for unit weight of steel bars?
d²/162 kg per metre, with d in millimetres. It comes from steel at 7,850 kg/m³: 12 mm is 144 ÷ 162 = 0.889 kg/m, 16 mm is 1.58 kg/m and 25 mm is 3.858 kg/m.
What are BS 8666 shape codes?
Two-digit codes for standard bar shapes, from 00 (straight) to 98, with 99 for any other shape drawn on the schedule. Each code has its dimensions (A to E or r) and a formula for the total length.
How do you calculate the cutting length of a link to BS 8666?
For shape code 51, L = 2(A + B + C) - 2.5r - 5d, with A and B the outside dimensions and C the hook. With minimum hooks, L = 2A + 2B plus the larger of 16d and 160 mm. A 540 x 240 link in 10 mm bar is 1,720 mm, scheduled as 1,725.
Is BS 8666:2005 still used?
BS 8666:2020 replaced it, with new shape codes and changed formulas for about twenty codes. Some projects still schedule to 2005; the schedule must say which edition it conforms to, and formulas must come from that edition.
What does H mean on a bar schedule, as in H16?
Under BS 8666, H is the type: a BS 4449 bar of grade B500A, B500B or B500C. 16 is the size in millimetres. B means B500B or B500C, and C means B500C.
Why is the length rounded up to 25 mm?
Schedules give bar lengths in multiples of 25 mm, which is within the cutting tolerance. Round up, so the bar is never short.
Do Saudi projects use BS 8666?
Some do, especially where the consultant specifies British Standards. Many Saudi structures are designed to SBC 304, which follows ACI 318, and use ACI hook and bend rules. Follow the project specification.
Sources
- BSI: BS 8666:2020, Scheduling, dimensioning, cutting and bending of steel reinforcement for concrete. Specificationhttps://knowledge.bsigroup.com/products/scheduling-dimensioning-bending-and-cutting-of-steel-reinforcement-for-concrete-specification-1
- Collins Reinforcements: BS 8666:2020 shape codes and length formulashttps://rebar.co.uk/bs-8666-2020/
- BSI: BS 4449, Steel for the reinforcement of concrete. Weldable reinforcing steelhttps://knowledge.bsigroup.com/
- Saudi Building Code National Committee: SBC 304, Concrete structureshttps://sbc.gov.sa/