Snag list template for new builds, fit-outs and handovers

A snag list records every defect found when a building or home is inspected before handover, so each one is put right. This template lists snags by room and trade with who fixes them and by when, and for contractors works out the retention held until the certificate of making good.

  • Room, trade, defect, severity, owner
  • Cost to put right
  • Retention to making good
  • A4 landscape, Excel with formulas

Written for UK. Elsewhere:Punch list template US

Last updated

Fill it in with your own details. Click any highlighted space and type, then print it or save it as a PDF, straight from this page. Nothing you type leaves your browser.

Snag list

Inspection                        Date                       

Snags

Ref.Room or areaTradeDefect and what good looks likeSeverityTo fixTargetClearedCost to put right
Total

Progress, and retention for the contractor

Snags raised
Snags cleared and checked
Cleared
Contract sum (build contract)
Retention percentage in the contract
Retention held
Share released at practical completion, %
Released at practical completion
Held until the certificate of making good

Notes

Site manager
Inspector or buyer
Customer care

What a snag list is

A snag is a defect or unfinished item in new building work: a door that sticks, a crack in the plaster, paint on a socket, a missing seal. A snag list (or snagging list) records every snag found on an inspection, with where it is, who will put it right and by when, so nothing is lost between handover and the end of the defects period. In the US the same list is called a punch list.

Who uses itWhen
Contractors and site managersBefore practical completion or handover, and again before the end of the rectification period
Employer's agents, architects, clerks of worksOn the practical completion inspection, and to agree the schedule of defects
New home buyers and their inspectorsOn the pre-completion inspection and in the first years after moving in
Fit-out and refurbishment contractorsAt handover to the tenant or landlord

Snagging under JCT and NEC contracts

StageJCTNEC
The work is finishedPractical completion certified by the architect or contract administratorCompletion certified by the project manager
Defects found afterMade good during the rectification period stated in the contract particularsNotified up to the defects date in the contract data, and corrected within the defect correction period
The listA schedule of defects at the end of the rectification periodDefects notified by the supervisor or contractor
The endCertificate of making good, which releases the rest of the retentionDefects certificate

Snags found before practical completion should be cleared before it is certified. The rectification period is whatever the contract states, often 6 or 12 months. Retention is held from interim payments at the percentage in the contract; under JCT contracts part of it is usually released at practical completion and the rest with the certificate of making good. The template takes your contract's percentage and the share released at practical completion, and works out what is still held.

Snagging a new build home

If your builder is registered with the New Homes Quality Board, the New Homes Quality Code applies. It provides for a pre-completion inspection, with standard checklists for houses and apartments that the inspection must use, and you can bring a professional snagging inspector or do it yourself. The inspection doesn't delay completion, so write everything down then.

  • Book the inspection as close to legal completion as you can, in daylight, with the services on.
  • Go room by room, top to bottom, and test everything: doors, windows, locks, taps, toilets, showers, sockets, switches, heating, extractor fans, the loft hatch.
  • Photograph each snag with its reference number and send the list to the builder in writing; keep a copy.
  • The New Homes Ombudsman Service is open to buyers of homes from registered builders from reservation until two years after legal completion, once the builder has had the time the Code allows to resolve a complaint.
  • Under NHBC's Buildmark, the builder is responsible for putting right defects reported in the first two years (the builder warranty period); report them in writing within that time.

How to fill in the snag list template

  1. Fill in the development, plot or unit, the type of inspection, who inspected and the list's revision.
  2. Walk in a fixed order (outside, then each floor from the front door), so the list follows the building.
  3. For each snag write the room or area, the trade, the defect and what good looks like, so the trade knows when it is done.
  4. Grade the severity: major for safety, security, water and anything that affects use; minor for finish and appearance.
  5. Assign it to the trade or the site team with a target date.
  6. Record the date it was cleared only once someone other than the trade has checked it.
  7. Contractors: enter the cost to put right, your contract sum, retention percentage and the share released at practical completion.

What to check: a room-by-room snagging checklist

AreaCheck
OutsideBrickwork and mortar, render, gutters and downpipes, roof tiles from the ground, paths and drives, fencing, turf, drainage covers
Doors and windowsOpen, close and lock smoothly; seals complete; glass not scratched; trickle vents work; keys for every lock
Walls and ceilingsCracks, nail pops, uneven plaster, paint runs and missed areas, in daylight
Floors and stairsLevel, no squeaks, flooring edges and thresholds finished, handrails and balustrades firm
KitchenUnits aligned and doors level, worktop joints sealed, appliances working and fitted, taps and waste
BathroomsSealant at bath, shower and basin, tiling and grout, toilets flush and fill, extractor fans, water pressure
Electrics and heatingSockets and switches firm and working, lights, consumer unit labelled, boiler and radiators heat up, smoke alarms
LoftInsulation laid evenly, hatch insulated and sealed, no daylight through the roof

Common snagging mistakes

  • Snags described too vaguely ("paint in hall") for anyone to find or sign off.
  • No photos, so the builder and buyer disagree later about what was there on the day.
  • Signing off snags on the trade's word rather than checking them.
  • Missing the end of the rectification period or the two-year builder warranty period, so later defects cost more to get fixed.
  • Contractors applying for the retention without the schedule of defects closed out.

Emplotec Projects

Or close the snags before the retention falls due.

In Emplotec the site team works on mobile, offline, against the project and its subcontractors, so open snags are known before a retention release is asked for.

  • Mobile checklists with packs for construction, offline on site.
  • Subcontractor work orders and their bills, so each snag stays tied to the trade that owes it.
  • Retention held on every contract, and open snags checked at handover before it is asked for.
  • A daily progress report on mobile, offline, for every project.
Snag list · Millfield Gardens, plot 7SL-07 rev 1 · completion 27 Nov
OpenBy tradeClearedAdd snagSend to trades
Emplotec3 major snags are still open on plot 7, completion is in 9 days. The electrician is on site at plot 9 tomorrow.
Snags10
Cleared440%
Major open3
Cost to put right£675
Open snags
Ref.RoomDefectTradeTarget
7-06Bedroom 1Window won't lock fullyWindows20 Nov
7-07Bedroom 2Socket loose in back boxElectrical17 Nov
7-10LoftHatch not insulatedSite team20 Nov
7-08Rear gardenTurf along rear fenceGroundworks25 Nov
Before completion
  • Front door adjusted
  • Bath sealed
  • Socket refixed
  • Buyer's re-inspection25 Nov

Plot 7's snags on 18 November, nine days before completion, with three major snags still open. Example companies, people and figures.

Questions people ask about the snag list format

What is a snag list?

A list of defects and unfinished items found when new building work is inspected, each with its location, who will put it right and by when. It is used at handover and again before the end of the defects or rectification period.

When should I do a snagging inspection on a new build?

Before legal completion if the builder allows a pre-completion inspection (builders under the New Homes Quality Code do), then again in the first months after moving in and before the two-year builder warranty period ends.

How long does a builder have to fix snags?

On a build contract, the rectification or defects period in the contract sets it. For a new home with NHBC Buildmark, the builder is responsible for putting right defects reported in the first two years; the developer should give target dates for each snag.

What is the rectification period in a JCT contract?

The period after practical completion during which the contractor must make good defects that appear. Its length is stated in the contract particulars, often 6 or 12 months; at the end, a schedule of defects is issued and, once they are made good, a certificate of making good.

What is the difference between a snag list and a punch list?

Only the name: snag list in the UK, Ireland and much of the Commonwealth, punch list in the US and Canada.

Do I need a professional snagging inspector?

No, buyers can do their own inspection with a good checklist. A professional inspector knows where defects hide (lofts, sealant, drainage) and their report carries more weight in a dispute.

Sources

  1. JCT: Joint Contracts Tribunal, standard building contractshttps://www.jctltd.co.uk/
  2. Designing Buildings: Rectification periodhttps://www.designingbuildings.co.uk/wiki/Rectification_period
  3. New Homes Quality Board: the New Homes Quality Code and pre-completion inspection checklistshttps://www.nhqb.org.uk/the-code/
  4. NHBC: Buildmark, the first two years (builder warranty period)https://www.nhbc.co.uk/homeowners/buildmark-cover/first-two-years

Stop typing snag lists by hand.

Tell us how your business runs. We'll show you Emplotec raising this from the work itself, on your own numbers, and reply within one working day.

WhatsApp